Move Logistics Group Limited · NZX:MOV

Move Logistics — H1 2024 Earnings Presentation

20 slides from Move Logistics's earnings presentation, Feb 23, 2024

  1. Slide 1: MOVE Logistics Group Limited 1H24 Results

    MOVE LOGISTICS GROUP LIMITED 1H24 RESULTS 23 February 2024

  2. Slide 2: Our Vision

    OUR VISION To be the preferred freight and logistics company in Australasia

  3. Slide 3: 1H24 Results Snapshot

    1H24 RESULTS SNAPSHOT Economic and sector headwinds INCOME EBITDA EBIT NLAT2 driving subdued customer Normalised1 Normalised1 volumes and impacting on costs $159.4m $13.2m $(8.6)m $(10.7)m and short term growth 1H23: $180.0m 1H23: $24.7m 1H23: $3.0m 1H23: $(3.3)m opportunities. Reflects first three

  4. Slide 4: 1H24 Summary

    1H24 SUMMARY Economic headwinds driving softer demand across the industry Operating Environment Initiatives and Events • Economic and sector headwinds tougher • Continue to execute on Project Blueprint and for longer than anticipated. Hampering including ongoing reset of Freight business execution s

  5. Slide 5: Strategy for Growth

    STRATEGY FOR GROWTH Our Vision: To be the preferred freight and logistics provider in Australasia Our Mission: To keep our customers moving Our Mantra: Customer, Safety, Team 1H24 Results Presentation 5

  6. Slide 6: Project Blueprint

    PROJECT BLUEPRINT 12–18 month dual pathway programme of short and long term initiatives to reshape and strengthen the business, and drive organic growth. First three months completed in 1H24. PRIORITIES RESHAPE AND STRENGTHEN THE BUSINESS DRIVE ORGANIC GROWTH Immediate benefit Short to medium term b

  7. Slide 7: Project Blueprint Initiatives

    PROJECT BLUEPRINT INITIATIVES We have identified what needs to be done across the business to achieve success and have a clear plan in place. Early benefits are being seen from the work underway. • Continuation of the Freight improvement programme • Accelerated comprehensive cost out programme from

  8. Slide 8: Financial Results

    FINANCIAL RESULTS 1H24 Results Presentation 8

  9. Slide 9: 1H24 Group Summary

    1H24 GROUP SUMMARY Results reflect: $Millions 1H24 1H23 • First three months of Project Blueprint Total Income 159.4 180.0 • Customer volumes impacted by economic Normalised EBITDA1 13.2 24.7 headwinds Normalised EBIT1 (8.6) 3.0 • Ongoing reset of Freight business with short 1 Normalised NLAT (9.6)

  10. Slide 10: Business Performance

    Business Performance 1H Revenue • FREIGHT: Reset programme ongoing with short term reduction in 200 earnings as previously advised; business being right sized to create a 150 $millions leaner, more efficient structure – benefits from cost out programme 100 expected from 2H24; priority on rebuilding

  11. Slide 11: Normalised EBITDA

    NORMALISED EBITDA • FREIGHT: Ongoing Freight reset; accelerated cost out programme with some short term impact – benefits expected from 2H24 • CONTRACT LOGISTICS: Softer short term customer demand for warehousing and reduced Fuels volumes. • INTERNATIONAL: Pilot of new shipping service $(2.2)m. Vess

  12. Slide 12: Cash Flow

    CASH FLOW $000s 1H24 1H23 Cash conversion remains stable despite Normalised EBITDA excl. non cash items 13,158 24,424 Non trading - cash items (396) 3 challenging trading Working capital movement 2,908 5,308 Net operating cashflows 15,670 29,735 • Cash conversion of 123% remains stable and in Capita

  13. Slide 13: Capex

    CAPEX Focus on maximum utilisation of existing assets; continued move to Capital Expenditure ($m) asset light model 1H24 1H23 Fleet 1.2 2.5 Ship - 8.5 • Asset light model supporting the balance sheet and building resilience in Technology 0.1 1.7 the supply chain Other 0.2 0.7 • Capital expenditure d

  14. Slide 14: Balance Sheet

    BALANCE SHEET Significant reduction in Net Debt Reduction in net debt 80 • $5.3m reduction in net debt 60 following conversion of convertible $millions 40 note and from cashflows 20 • Bank facilities with revised 0 covenants enabling runway for Dec-21 Jun-22 Dec-22 Jun-23 Dec-23 Borrowings (incl Con

  15. Slide 15: Looking Forward

    LOOKING FORWARD 1H24 Results Presentation 15

  16. Slide 16: Strong Leadership Team

    STRONG LEADERSHIP TEAM Leading our pathway to success Craig Evans Lee Banks Anthony Barrett Rachel Hustler Ricky Clark CEO CFO CIO GM People & Culture National Sales Manger Appointed Feb 2023 Appointed Jul 2013 Appointed Apr 2022 Appointed Jul 2023 Appointed Oct 2023 James Watters Justin Marshall An

  17. Slide 17: Looking Ahead

    LOOKING AHEAD Business Outlook: • Short term focus to recover to prior Market outlook: performance levels. Longer term to exceed • Continuation of current economic and sector and outperform conditions expected in the short term • Project Blueprint - embedding change, • New opportunities for MOVE as

  18. Slide 18: Appendices

    APPENDICES Craig Evans Lee Banks Chief Executive Officer Chief Financial Officer Phone: +64 274 353 897 Phone: +64 27 525 2876 Email: craig.evans@movelogistics.com Email: Lee.Banks@movelogistics.com 1H24 Results Presentation 18

  19. Slide 19: Non-GAAP Reconciliation

    Non-GAAP Reconciliation $Millions 1H24 1H23 MOVE Logistics Group uses several non-GAAP measures when discussing financial performance and the Board and Net profit/(loss) before income tax (GAAP measure) (14.19) (2.91) Management believes this provides a better reflection of the Add back: company’s u

  20. Slide 20: Disclaimer

    Disclaimer This presentation has been prepared by MOVE Logistics Group Limited (“MOV”). The information in this presentation is of a general nature only. It is not a complete description of MOV. This presentation is not a recommendation or offer of financial products for subscription, purchase or sa

MOVE Logistics Group — H1 2024 Earnings Presentation on 6ix