  1. Slide 1: Midway Steam Plant: A Case Study in Early Twentieth Century California

    Midway Steam Plant: A Case Study in Early Twentieth Century California Industrial and Electrical Development Midway Steam Plant, Buttonwillow, Kern County Polly Allen and Michelle Cross October 1, 2014

  2. Slide 2: Electricity is destined to be one of the most powerful factors

    “Electricity is destined to be one of the most powerful factors entering our social condition” -Electrical Engineer,1890 Night Illumination, Panama Pacific International Exposition, 1915 Los Angeles Electric Rail, 1909

  3. Slide 3: San Joaquin Light and Power Corporation

    San Joaquin Light and Power Corporation • Established in 1895 as San Joaquin Electric Company. • 37 Mile Transmission Line from Powerhouse #1 on the San Joaquin River to Fresno, longest in world at construction. • By 1920, the company operated 11 powerhouses and served 7 Counties. • Strong Promoter

  4. Slide 4: Hydro Under Pressure: Navigating Drought, Demand, and Development

    Hydro Under Pressure: Navigating Drought, Demand, and Development California Press 1918-1921

  5. Slide 5: A Rush For Infrastructural Expansion

    A Rush For Infrastructural Expansion Report of the California State Railroad Commission, 1921

  6. Slide 6: Siting of the Midway Steam Plant

    Siting of the Midway Steam Plant: Proximity to Load Centers, Fuel Supplies, and Low-Priced Land Standard Hay Number 7, Elk Hills Miller and Lux Versus Southern Pacific, PG&E Archives, Bakersfield

  7. Slide 7: Pushing Midway Online

    Pushing Midway Online PG&E Archives Bakersfield

  8. Slide 8: Layout of the Midway Steam Plant

    Layout of the Midway Steam Plant • Steam Plant • Cooling Pond • Cooling tower • Machine Shop • Warehouse • Spur • Wells • Gas Pipeline • Workers Cottages

  9. Slide 9: An Irrigated Eden: Steam Plant Salesmanship

    An Irrigated Eden: Steam Plant Salesmanship Circa 1930 Plans for Midway Steam Plant Landscaping, (PGE Archives Bakersfield). 19/07/2016

  10. Slide 10: Operating Midway Steam Plant: Demographic and Social Development

    Operating Midway Steam Plant: Demographic and Social Development United States Federal Census, 1930

  11. Slide 11: A Step of Unusual Importance: The Pacific Service Merger

    A Step of Unusual Importance: The Pacific Service Merger and Ongoing Energy Consolidation

  12. Slide 12: Post-War Expansion and Industry Transition

    Post-War Expansion and Industry Transition

  13. Slide 13: From Midway Steam Plant to Midway Substation

    From Midway Steam Plant to Midway Substation 1966 Midway Substation Expansion (PG&E Archives Bakersfield) 1966 Demolition of Midway Steam Plant (Buttonwillow Times)

  14. Slide 14: Evolving Energy Infrastructure: Midway Today

    Evolving Energy Infrastructure: Midway Today

  15. Slide 15: PG&E Substation Security Upgrade Project 2014

    Pacific Gas and Electric Company Substation Security Upgrade Project 2014 19/07/2016 View of Metcalf Substation located in Santa Clara County, California

  16. Slide 16: Scope – Substation Security Upgrade Project

    Scope – Substation Security Upgrade Project This image cannot currently be displayed. 19/07/2016

  17. Slide 17: The Midway Substation, Kern County

    The Midway Substation, Kern County View of former San Joaquin Light and Power Company Warehouse at the 19/07/2016 location of the Midway Substation, Kern County, California

  18. Slide 18: Previous Archaeological Investigations and Studies of the Midway Steam Plant

    Previous Archaeological Investigations and Studies of the Midway Steam Plant 19/07/2016

  19. Slide 19: Previous Archaeological Investigations and Studies of the Midway Steam Plant

    Previous Archaeological Investigations and Studies of the Midway Steam Plant 19/07/2016

  20. Slide 20: Previous Archaeological Investigations and Studies of the Midway Steam Plant

    Previous Archaeological Investigations and Studies of the Midway Steam Plant 19/07/2016

  21. Slide 21: Approach to Archaeological Testing

    Approach to Archaeological Testing 19/07/2016

  22. Slide 22: Georeferenced Historic Plan Map

    Georeferenced Historic Plan Map 19/07/2016

  23. Slide 23: Results: What did we find?

    Results: What did we find? 19/07/2016

  24. Slide 24: Redefined Site Boundaries

    Redefined Site Boundaries 19/07/2016

  25. Slide 25: Archaeological Evaluation: Ineligible for Listing in the NRHP or CRHR

    Archaeological Evaluation: Ineligible for Listing in the NRHP or CRHR Potential Significance Under NRHP Criteria: • A: Associated with important advances in electrical generation and steam plant development. • C: Reflective of a cohesive operational and industrial design that is representative of pe

  26. Slide 26: Approach to Architectural Inventory and Evaluation

    Approach to Architectural Inventory and Evaluation 1. Warehouse 2. Remnant slab associated with Powerhouse and Machine Shop 3. Remnant portions of perimeter of Cooling Pond 4. Remnant rails associated with SPRR Midway Steam Plant Spur 5. Remnant utility features associated with Midway Steam Plant Wo

  27. Slide 27: Site Inventory

    Site Inventory Storage Warehouse

  28. Slide 28: Site Inventory

    Site Inventory Steam Plant Remnants

  29. Slide 29: Site Inventory

    Site Inventory Southern Pacific Railroad Spur

  30. Slide 30: Site Inventory

    Site Inventory Hop TF aes | Cooling Pond >) Cardna ENTRIX Shaping the Future

  31. Slide 31: Site Inventory

    Site Inventory Water Delivery Infrastructure, Worker Cottage Area

  32. Slide 32: Site Inventory

    Site Inventory Remnants of Landscaping

  33. Slide 33: Architectural Evaluation: Ineligible for Listing in the NRHP or CRHR

    Architectural Evaluation: Ineligible for Listing in the NRHP or CRHR Potential Significance Under NRHP Criteria: • A: Associated with important advances in electrical generation and steam plant development. • C: Reflective of a cohesive operational and industrial design that is representative of per

  34. Slide 34: General Conclusions / Lessons Learned

    General Conclusions / Lessons Learned • Importance of Cultivating and Exploring Multiple Archival Sources • Utility Sites with Ongoing Development Contexts May Hold Multiple Evaluative Frameworks • Timely updating of DPR documentation necessary • Importance of detailed and exhaustive Historic Contex