Slide 1: Positioned as the Next Leading Latin American Precious Metals Company
POSITIONED AS THE NEXT LEADING LATIN AMERICAN PRECIOUS METALS COMPANY TSXV:MAI November 2017
Slide 2: Disclaimer
Disclaimer This presentation contains certain “forward-looking statements”. All statements, other than statements of historical fact, that address activities, events or developments that Minera Alamos believes, expects or anticipates will or may occur in the future are forward-looking statements. Fo
Slide 3: In Summary
In Summary • Proven Mine Building Team Focused on Mexican Gold Production – The Minera Alamos team built Argonaut Gold’s platform asset for less than C$10M and sold it to Argonaut Gold for C$130M • Cornerstone Financial Partner – Osisko Gold Royalties added as a cornerstone strategic partner with 15
Slide 4: Company Snapshot
Company Snapshot General Major Shareholders Headquarters Toronto, Ontario Osisko Gold Royalties 15.0% Symbol TSXV:MAI Other Institutions 23.9% Capitalization Management and Insiders 9.6% Current Price $0.18 Basic Shares Outstanding 146.9M Share Price and Volume (Last Twelve Months) (add) Warrants 62
Slide 5: OBAN/Osisko Model for Growth
OBAN/Osisko Model for Growth The partnership with Osisko Gold Royalties provides Minera Alamos with the ability to replicate a strategy similar to Osisko Mining in Mexico/Latin America Osisko Mining – Market Capitalization (June 2015 to November 2017) $1,200 August 25, 2015: Oban June 9, 2015: Oban
Slide 6: Proven Mine Builders
Proven Mine Builders Management > +20 years of engineering/metallurgical experience Darren Koningen > Led the development of Castle Gold’s El Castillo project prior to its sale to Argonaut President, CEO and Director > Designed, constructed, commissioned and operated two gold heap leach operations (
Slide 7: Asset Overview
Asset Overview La Fortuna Tonnage Au Grade Au Contained (Kt) (g/t) (Koz) Measured 1,538 2.96 146 Indicated 3,287 1.53 162 La Fortuna M&I 4,824 1.99 308 GdR Guadalupe de los Reyes Tonnage Au Grade Ag Grade Au Contained AuEq Contained (Kt) (g/t) (g/t) (Koz) (Koz) Indicated 6,843 1.73 28.71 380 499 M&I
Slide 8: La Fortuna and Guadalupe de los Reyes
La Fortuna and Guadalupe de los Reyes Located in a prolific mining district November 2017 8
Slide 9: La Fortuna
La Fortuna A high grade / low-CAPEX open pit operation Project Location with significant resource expansion potential Location • Durango State, Mexico • +6,200 ha Infrastructure • Easily accessible via a 100 km road from Culiacan, the Capital of Sinaloa state • State authorities are extending a 2-la
Slide 10: La Fortuna Main Zone
La Fortuna Main Zone High-Grade and High-Margin Block Model • Majority of resource grades 3.5-4.0 g/t Au • Wide zones of mineralized breccia • Metallurgical testing demonstrated +90% Au recoveries Processing Capacity • 2,000 tpd mill acquired in 2017 • 1,000 tpd starter operation easily expanded to
Slide 11: La Fortuna Regional Prospects
La Fortuna Regional Prospects • Multiple zones of “Fortuna-style” mineralization identified • Mineralization focused in areas of intersecting fault structures • Some of alteration zones (i.e. PN Prospects area) significantly greater in scale than those present at Fortuna • No systematic exploration
Slide 12: Guadalupe de los Reyes (GdR)
Guadalupe de los Reyes (GdR) A PEA-stage heap leachable gold-silver asset Project Location with ~2 g/t AuEq grade in stable Sinaloa Location/Land Package • ~15,575 ha in Sinaloa State, Mexico • Significant regional gold system - est. historical production of 500-600 Koz Au and +40 Moz Ag Recent Hist
Slide 13: GdR Exploration Potential
GdR Exploration Potential • Significant regional gold system with estimated historical production of 500,000-600,000 oz Au and +40 Moz Ag • Project area includes at least 8 target areas identified along 3 major structural zones (+10 km identified at surface) • 4 deposits: with drilled resources -- E
Slide 14: Planned Work Schedule
Planned Work Schedule 2017 2018 2019 Q4 Q1 Q2 Q3 Q4 Q1 Q2 La Fortuna Complete Revised Economic Analysis Complete Detailed Construction Plan First Initiate Exploration & Resource Production Expansion Drilling Receive Permits Construction Decision Guadalupe de los Reyes Close Acquisition Transaction C
Slide 15: Achievements (2017)
Achievements (2017) Near Mine Resource Mine Development Corporate Development Expansion La Fortuna La Fortuna Strategic Acquisition Commenced fast-track Initiated (late 2017) Entered into an option to development activities resource expansion acquire 100% of GdR program through staged Hired
Slide 16: Company Strategy
Company Strategy A proven success strategy: Develop low CAPEX assets, while expanding the near mine resource and remaining opportunistic for assets that fit the target profile Near Mine Resource Mine Development Corporate Development Expansion Study Targets Resource Growth Target Profile • Issue PEA
Slide 17: Appendix
Appendix MINERAWALAMOS
Slide 18: La Fortuna Main Orebody Section
La Fortuna Main Orebody Section La Fortuna November 2017 18
Slide 19: Main Zone Potential
La Fortuna Main Zone Potential Resource Wireframe Similar style mineralization to main La Fortuna orebody • quartz monzonite Open • tourmaline breccias • andesite dykes Some extensions seem to be faulted offsets from main Fortuna deposit November 2017 19
Slide 20: Regional Geology
La Fortuna Regional Geology • Regional Geology – Porphyry-Epithermal System (6238 Ha) November 2017 20
Slide 21: Exploration Potential
La Fortuna Exploration Potential November 2017 21
Minera Alamos — Investor Presentation (November 2017) on 6ix