Mandalay Resources Corp

Mandalay Resources — Investor Presentation (August 2011)

40 slides from Mandalay Resources's investor presentation, August 2011

  1. Slide 1: Delivering Production, Cash Flow and Reserve Growth 2011

    TSX: MND, MND.WT Delivering Production, Cash Flow and Reserve Growth 2011 August 2011

  2. Slide 2: Forward-looking statements

    Forward-looking statements This presentation contains "forward-looking statements" within the meaning of applicable securities laws, including statements relating to life of mine production plans and exploration plans and the growth and strategy of Mandalay. Readers are cautioned not to place undue

  3. Slide 3: Quality control and assurance

    Quality control and assurance Quality control and assurance programs are implemented in line with the standards of National Instrument 43-101. The exploration program at Costerfield is supervised by Chris Gregory (Member, Australian Institute of Geoscientists accredited Chartered Professional (Minin

  4. Slide 4: Investment highlights for 2011

    Investment highlights for 2011 ¾ Becoming a significant producer of gold, silver and antimony from two producing mines 2011E Forecast Production 2012E Forecast Production Gold (oz) 20,000 ‐ 25,000 35,000 ‐ 40,000 Silver (oz) 1,500,000 – 1,900,000 3,200,000 ‐ 3,700,000 Antimony (t) 1,500‐2,500 2,500

  5. Slide 5: Mandalay Resources strategy – Growing a portfolio of cash generating properties

    Mandalay Resources strategy – Growing a portfolio of cash generating and high potential properties ¾ Continuing to develop/expand operations at Costerfield & Cerro Bayo • 100% ownership • Diversified commodities (Au, Ag, Sb) • Two stable, mining-friendly jurisdictions (Chile, Australia) • Each opera

  6. Slide 6: Growing Revenue & EBITDA @ growing margins

    Growing Revenue & EBITDA @ growing margins 6

  7. Slide 7: Growth at lower risk

    Growth at lower risk ¾ Increasingly diverse Q1, 2011 9 Metals, Q 4, 2010 9 Regions, 9 Customers ¾100% ownership of all projects & mines Q3, 2011 7

  8. Slide 8: Growing reserves and mine life

    Growing reserves and mine life +15% +5% +17% Q3, 2011 1 Source: Mandalay Resources Corporation NI 43-101 Technical Report Cerro Bayo Mine, Chile; prepared by SRK Consulting, dated May 14, 2010, updated by internal resource estimation on Yasna vein only, April, 2011. 2 Source: NI 43-101 Technical Rep

  9. Slide 9: Cerro Bayo district

    Cerro Bayo district NI43-101 Reserve-Resource veins ¾ 2011 Infill Drilling and Step-Out Drilling 2011 Scheduled blue sky targets 2012 Scheduled blue sky targets Identified targets extending historic veins ¾ (+40 of these, systematic review needed) 9

  10. Slide 10: Cerro Bayo operational summary

    Cerro Bayo operational summary ¾Operational ramp-up on schedule • 2011 Year end Silver production of 1.5M – 1.9M oz • Capital and operating development ahead of schedule ¾Initiation of Delia NW mine • Primary ramp started in April, 2011 • On track to begin ore development November, 2011 ¾Producing f

  11. Slide 11: Cerro Bayo production & cost

    Cerro Bayo production & cost 11

  12. Slide 12: Cerro Bayo production plan 2011-2012

    Cerro Bayo production plan 2011-2012 Cerro Bayo Plan 2011E 2012E Gold Produced (oz) 6,000-10,000 19,000 – 21,000 Gold Sold (oz) 7,000-9,000 19,000 – 21,000 Silver Produced (oz) 1.5m – 1.9m 3.4m – 3.8m Silver Sold (oz) 1.4 – 1.6m 3.4m – 3.8m Operating Costs (US$ m) 29 – 30 34 – 35 Concentrate Shippin

  13. Slide 13: Cerro Bayo Laguna Verde area

    Cerro Bayo Laguna Verde area • Bianca discovered & mined • Yasna reserves added • Delia SE Ext. discovered • Trinidad a new target Q1, 2011 DAGNY Dalila FABIOLA YASNA Coyita Mill DELIA NW Delia SE BIANCA Tailings LAGUNA VERDE Trinidad Q3, 2011 13 Producing Mine or Planned mine (Vein Outcrop) Explora

  14. Slide 14: Fabiola vein & outcrops

    Fabiola vein & outcrops COIGUES ESTE PROJECT - FABIOLA VEIN bad x = o Nw R LONGITUDINAL SECTION - TOTAL DRILLING ® 27 JULIO 2011 400Z i i e 3 3 S : £ 8 ; g sr teve : 3 300Z 2b7 LeveL, By Laguna Verde ° guna Ver FCHS52 ites 200Z e FCHS53 5° ores _FCHS38 0.48 @0.15-27— e SOEERe. ug iti ercusag 9 FCH54

  15. Slide 15: Delia Vein: SE extension target – high grade shoot offset by fault

    Delia Vein: SE extension target – high grade shoot offset by fault g/t AuEq 2.32m @ 42.3 1.21m @ 8.39 1.22m @ 9.53 2.19m @ 65.6 15

  16. Slide 16: Cerro Bayo district – new targets

    Cerro Bayo district – new targets 16

  17. Slide 17: Costerfield mine

    Costerfield mine Brunswick Pit Brunswick Plant Evaporation Pond Augusta Portal 17

  18. Slide 18: Costerfield production & cost

    Costerfield production & cost 18

  19. Slide 19: Costerfield production plan 2011-2012

    Costerfield production plan 2011-2012 Costerfield Plan 2011E 2012E Gold Produced (oz) 14,000 – 16,000 16,000 – 18,000 Gold Sold (oz) 14,000 – 16,000 16,000 – 18,000 Antimony Produced (t) 1,500 – 2,500 2,400 – 2,600 Antimony Sold (t) 1,500 – 2,500 2,400 – 2,600 Operating Costs (US$ m) 21 – 25 21 – 25

  20. Slide 20: W-Lode Deeps

    W-Lode Deeps ¾ 2010 Accomplished • 3,634 m core • 11 intercepts • 68% success rate • Demonstrated continuation at depth ¾ Apr-2011 Resource & Reserves • Updated independent NI 43-101 report • Increased contained metal in reserves by about 15% net of 2010 production ¾2011 to date • 4592 m core • 15 i

  21. Slide 21: Brownfields drilling

    Brownfields drilling ¾ 2011 Plan • 4,000 m core • Drill confirm at least one additional ore shoot with the potential of at least 250 k/oz of Au Eq. ¾ 2011 to Date • 8 holes • 1,814 m • Two high priority targets tested • N-Lode success • Alison-Lode success • Several more high priority targets (benea

  22. Slide 22: Costerfield Brownfield Targets in NW-SE Long Section

    Costerfield Brownfield Targets in NW-SE Long Section 22

  23. Slide 23: N-Lode East vein – large target emerging

    N-Lode East vein – large target emerging ¾ New compilation ¾ Mine sampling confirms resource ¾Three new holes extend potential Potential Target 17 hits out of 23 23

  24. Slide 24: Alison vein – high grade intercepts

    Alison vein – 2 high grade intercepts 24

  25. Slide 25: La Quebrada copper-silver exploration project

    La Quebrada copper-silver exploration project Casa de Tugal Piedra Pit Manto outcrop 25

  26. Slide 26: Casa de Piedra – geology & drill map

    Casa de Piedra – geology & drill map 26

  27. Slide 27: Casa de Piedra – cross-section B-B’

    Casa de Piedra – cross-section B-B’ ? 27

  28. Slide 28: Mandalay financials (June 30, 2011)

    Mandalay financials (June 30,2011) Revenues, Costs and Capital • Expected 2011 revenue ($1,250/oz Au, $27/oz Ag, $12,500/t Sb) = $80-100 million • Expected operational costs inclusive of overheads = $60-70 million • Planned capital and exploration expenditures = $25-30 million • Financing costs 2011

  29. Slide 29: 2011 – 2012 price protection program

    2011 – 2012 price protection program Put price Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 2011 2012 Product (US$) 2011 2011 2011 2011 2012 2012 2012 2012 Total Total Au Puts 1,400 - - - - 7,000 7,000 7,000 7,000 - 28,000 % Cover 0.00% 0.00% 0.00% 0.00% 76.98% 75.19% 66.01% 64.18% - 70.15% Expected Production Ag Puts 2

  30. Slide 30: Capital & share structure (23-Aug-2011)

    Capital & share structure (23-Aug-2011) Shares outstanding 268,504,075 Options (1) 14,458,446 Warrants (2) 106,389,312 Shares fully diluted 389,351,833 Approx. Ownership Major shareholders: Shares Owned (basic) West Face Capital 43.50% 116,883,045 Sprott (all) 10.39% 27,885,938 Western Coal (Walter

  31. Slide 31: 2011 goals

    2011 goals Cerro Bayo Costerfield Portfolio 9Prove up an additional 9Continue decline and 9La Quebrada – Drill 3-5 years of minable stope development to Casa de Piedras and reserves from drilling lower levels, increasing Leoncita targets inferred resources and measured resource – • Acquire at least

  32. Slide 32: Investment advantages

    Investment advantages Big company In production – experience with the generating cash flow Opportunity to invest at agility of a junior from diversified portfolio the right time • Company is • Cash flowing company, with • Management team with – Multi-mine access to projects and strong excellent trac

  33. Slide 33: Thank you

    TSX: MND, MND.WT Thank you For more information, please contact: Greg DiTomaso Tel: 647.260.1566 Email: g.ditomaso@mandalayresources.com Company Website: www.mandalayresources.com 33

  34. Slide 34: Appendices

    TSX: MND, MND.WT Appendices 34

  35. Slide 35: Management and Board of Directors

    Management and Board of Directors Brad Mills, CEO Former CEO Lonmin plc, over 30 years of experience in Copper, Gold, PGMs Sanjay Swarup, CFO Former Lonmin plc, over 20 years of industry experience Mark Sander, COO 27 years of experience in exploration, strategy, and operating improvements Belinda L

  36. Slide 36: Metal price history

    Metal price history Source: www.metalbulletin.com 36

  37. Slide 37: FOREX history

    story FOREX h LL-9eq LL-38q LL-AON LL-40N LL-PO 1-PO LL-dag LL-dag. L-ny LL-Bny Line eine bL-unr bL-une LL Aewy LL Aew Lady Lady LL-2e 14 LE-sel 1-994 Lb-qad a bLuer a LL-uer 7) aL-99q a oL-290 2 OL- AON 2 OL-AON, oD Fa 01-20 3 } 01-290 a f ai-dag fo¥ QL-dag a / aL-6ny o / o-6ny > / onine J OL-inr —

  38. Slide 38: Mandalay stock volume & price history

    Mandalay stock volume & price history 38

  39. Slide 39: Mandalay Reserves – Costerfield & Cerro Bayo

    Mandalay Reserves – Costerfield & Cerro Bayo Resource Ag Grade Ag Au Grade Au Cerro Bayo Reserves1 (t) (g/t) (cont. oz) (g/t) (cont. oz) Proven Reserves 0 ? 0 ? - Probable Reserves 778,175 307 7,679,817 2.48 62,035 P&P Reserves 778,175 307 7,679,817 2.48 62,035 Ore Sb Grade Sb Au Grade Au Costerfiel

  40. Slide 40: Mandalay Resources – Costerfield & Cerro Bayo

    Mandalay Resources – Costerfield & Cerro Bayo Resource Ag Grade Ag Au Grade Au Cerro Bayo Resources1 (t) (g/t) (cont. oz) (g/t) (cont. oz) Measured Resources 5,000 514 82,637 2.60 418 Indicated Resources 740,269 468 11,134,227 3.31 78,688 M&I Resources 745,269 468 11,216,864 3.30 79,106 Inferred Res