Colonial Coal International Corp. · TSXV:CAD

Colonial Coal International — Investor Presentation (June 2026)

20 slides from Colonial Coal International's investor presentation, Jun 9, 2026

  1. Slide 1: Colonial Coal International Corp.

    TSX-V: CAD Colonial Coal International Corp. Western Canada’s Leading Coking Coal Developer 2026 June Investor Presentation TSX-V: CAD www.ccoal.ca 0

  2. Slide 2: Legal Disclaimers

    Legal Disclaimers This presentation may contain forward-looking statements, and forward-looking information under applicable securities laws including management’s expectations of future production, cash flow, and earnings. These statements are based on current expectations that involve a number of

  3. Slide 3: Investment Highlights

    Investment Highlights Unparalleled Investment Opportunity Project Location Map ● Well-positioned to support projected global steel growth  Global metallurgical supply of coal has faced constraints due to limited new mine developments, coinciding with increasing capacities of blast furnaces in key m

  4. Slide 4: Market Overview: Metallurgical Coal

    Market Overview: Metallurgical Coal Western Canadian Coal Miners are Poised to Supply Asian Markets BC Metallurgical Coal Production (Mt) Western Canadian Coal Overview ● Steelmaking coal benchmark prices were approximately US$245/t as of June 10-Year Average = 28.4 Mt/y 35 2026, remaining below pri

  5. Slide 5: Management Team and Board of Directors

    Management Team and Board of Directors ● Co-founder of Colonial Coal Corp., Western Coal Corp. (WCC), and Northern Energy & Mining Inc. (NEMI) David Austin ● One of the three founders credited for the success on the production of WCC projects Chairman, President & CEO (WCC was sold CAD$3.3 billion t

  6. Slide 6: Western Canada Met Coal Project Comparison

    Western Canada Met Coal Project Comparison ● In mid-2019, Hancock Prospecting Pty Ltd announced that it had acquired all of the outstanding ordinary shares of Riversdale Resources Limited that it did not already own ● Implies a TEV of AUS$737 million for Riversdale (100.0% basis) ● Riversdale's prim

  7. Slide 7: Company Overview: Colonial Coal

    Company Overview: Colonial Coal Colonial’s Projects: Two of the Largest Hard Coking Coal Deposits in the Region ● Huguenot has a contained resource of 277.7 million tonnes of combined Measured and Indicated resources plus 119.2 million tonnes of Inferred resources, making it one of the largest depos

  8. Slide 8: Peace River Coal Tenures

    Peace River Coal Tenures WILLOW CRK. Chetwynd CTI HD Mining Int’l. Ltd. UA WILLOW CREEK SUSKA MURRAY RIVER (Producing) SUSKA Resource Definition Approved Mine Permit Reserves: 6.6 Mt Resources: 103 Mt Projected Resources: 688 Mt Production (2024): 1.3 Mt Conuma NNW SUKUNKA Target Production: 6 Mtpa

  9. Slide 9: Colonial Projects Overview: Conceptual Infrastructure Development Plan

    Colonial Projects Overview: Conceptual Infrastructure Development Plan Highlights HUGUENOT PRC Rail Loadout Possible Flatbed Rail Loadout • 2018 PEA considers the construction of an 85 km rail spur Murray River connecting the project to the main rail line, assumed to be Loadout Area Paved Highway (3

  10. Slide 10: HUGUENOT

    Colonial Projects Overview: HUGUENOT TSX-V: CAD www.ccoal.ca 9

  11. Slide 11: Company Overview: Colonial Coal (Huguenot Property)

    Company Overview: Colonial Coal HUGUENOT PROPERTY  Situated adjacent to and contiguous with the proposed Belcourt South open pit (owned by PRC)  Trucking distance of ~111 km road– also accessible by ~85 km rail spur (or combination rail and overland conveyor) - to link with the existing rail line

  12. Slide 12: Huguenot 2020 PEA Highlights (Open Pit Only)

    Company Overview: Colonial Coal HUGUENOT PROPERTY 2020 PEA Highlights (Open Pit Only)  The 2020 study used previously reported surface mineable resources to Huguenot Project develop a revised conceptual mine plan utilizing a stand-alone open pit mine. NPV (millions) at Varying Discount Rates with I

  13. Slide 13: Huguenot 2020 PEA Highlights (Open Pit Only)

    Company Overview: Colonial Coal HUGUENOT PROPERTY 2020 PEA Highlights (Open Pit Only)  Measured and Indicated surface mineable coal resources total 132.0 million tonnes, with an additional Inferred resource of 0.5 million tonnes. Not included for mining in the 2020 PEA are in-situ underground minea

  14. Slide 14: Huguenot 2018 PEA Highlights (Open Pit and Underground)

    Colonial Projects Overview: HUGUENOT PROPERTY 2018 PEA Highlights (Open Pit and Underground Mine) Huguenot Project  The 2018 PEA has an indicative after-tax (and royalty) net present value PEA 2018 (NPV) of US$1,166 million (CAD$1,516 million) using a 7.5% discount Coal NPV (millions) at Varying Di

  15. Slide 15: Huguenot Project Coal Quality Comparison

    Colonial Projects Overview: Huguenot Project Coal Quality Comparison The Huguenot Project is projected to produce a clean premium hard coking coal (HCC) product with low ash, low sulfur, low phosphorus, and High FSI Coal Quality Comparison: Huguenot HCC VS. Canadian Export Coking Coals Huguenot HCC1

  16. Slide 16: FLATBED

    Company Overview: Colonial Coal FLATBED TSX-V: CAD www.ccoal.ca 15

  17. Slide 17: Gordon Creek Metallurgical Coal Project (Flatbed Property)

    Colonial Projects Overview: Gordon Creek Metallurgical Coal Project (Flatbed Property) PROJECT SUMMARY ● Proximal to supportive infrastructure such as existing PRC Rail Loadout rail, power, highways, and the town of Tumbler Ridge. Bearhole Lake Park MURRAY RIVER ● Located near currently and Loadout

  18. Slide 18: Gordon Creek Project (Flatbed) 2018 PEA

    Colonial Projects Overview: Gordon Creek Metallurgical Coal Project (Flatbed Property) Gordon Creek Project (Flatbed) 2018 PEA PEA 2018 Gordon Creek Project (Flatbed) Highlights NPV (millions) at Varying Discount Rates with IRR Overall Average Coal Price/Tonne • The Gordon Creek Project has an indic

  19. Slide 19: Gordon Creek Coal Quality Comparison

    Colonial Projects Overview: Gordon Creek Metallurgical Coal Project (Flatbed Property) Premium clean hard coking coal product (Seams B, D, F (combined F1 and F2), and Seam G, totalling 71.4% of the reported resources) plus a premium pulverized coal injection (PCI) product (Seams J and K, totalling 2

  20. Slide 20: Access to World Class Infrastructure

    Access to World Class Infrastructure ● Production from Huguenot and Flatbed would be shipped by rail to one of the three export terminals on the west coast of British Columbia. ● Access to deep water export terminals, including the Neptune and Westshore terminals in Vancouver and the Ridley Terminal