Endeavour Mining Plc · TSX:EDV

Endeavour Mining — Investor Presentation (February 2023)

184 slides from Endeavour Mining's investor presentation, February 2023

  1. Slide 1: Corporate Presentation

    TSX & LSE: EDV OTCQX: EDVMF CORPORATE PRESENTATION February 2023

  2. Slide 2: Table of Contents

    TABLE OF CONTENTS 1 Endeavour Overview 2 Financial Results and Outlook 3 Our High Quality Portfolio 4 Being a Trusted Partner 5 West Africa Insights 6 Appendix 2

  3. Slide 3: Disclaimer and Forward-Looking Statements

    DISCLAIMER AND FORWARD-LOOKING STATEMENTS Cash cost per ounce and all-in sustaining cash cost per ounce are non-GAAP performance activities; changes in national and local government legislation, regulation of mining measures with no standard meaning under IFRS. This presentation contains statements

  4. Slide 4: Endeavour Overview

    ENDEAVOUR OVERVIEW 1 4

  5. Slide 5: Unmatched Competitive Advantage in the World's Largest Gold Producing Region

    ENDEAVOUR HAS AN UNMATCHED COMPETITIVE ADVANTAGE IN THE WORLD’S LARGEST GOLD PRODUCING REGION 1 Largest 6 Gold 1,325-1,425koz West African producer mines AISC $940-995/oz 2023 Production Guidance 5

  6. Slide 6: Company Profile

    COMPANY PROFILE Highlights Top Shareholders Shareholder register as at 30 November 2022 Ticker LSE | TSX: EDV, OTXCQ: EDVMF Shares outstanding as at 31 January 2023 246m Rank Institution name % of S/O 1 La Mancha 19.6% Share price as at 31 January 2023 £18.67 / C$31.37 2 BlackRock Investment Managem

  7. Slide 7: Our Purpose Is to Produce Gold That Provides Lasting Value to Society

    OUR PURPOSE IS TO EMBEDDING THE UN SDGS INTO OUR ESG STRATEGY PRODUCE GOLD THAT PROVIDES LASTING VALUE TO SOCIETY We do so while protecting and promoting the places where we operate. Our work is a partnership, helping to create resilient and self-sustaining communities, where people are equipped wit

  8. Slide 8: Our Strategy

    Watch CEO OUR STRATEGY video Build a resilient business and be a trusted partner with the ability to reward shareholders MAINTAINING A BEING A REWARDING HIGH-QUALITY PORTFOLIO TRUSTED PARTNER SHAREHOLDERS Industry-leading operational excellence Employment and training Prudent balance sheet managemen

  9. Slide 9: Focused on Being a Resilient Business

    FOCUSED ON BEING A RESILIENT BUSINESS High quality portfolio which generates sufficient cash flow to re-invest in our business and reward our stakeholders PORTFOLIO OBJECTIVES PORTFOLIO OPTIMISATION PILLARS $950/oz Industry-leading All-in Sustaining Cost 01 Operational Excellence +10 YEARS Productio

  10. Slide 10: Superior Operating Model

    1 SUPERIOR OPERATING MODEL OPERATIONAL EXCELLENCE Geographic focus provides a strong competitive advantage OPERATING MODEL MANAGEMENT TRACK RECORD › Largest producer in each of our operating countries enhances ability to extract synergies › Significant synergies from shared technical functions › Han

  11. Slide 11: Met Guidance for 10th Consecutive Year

    MET GUIDANCE FOR 10TH CONSECUTIVE YEAR Achieved top-end of production guidance and AISC within range for FY-2022 0.02 GROUP LTM INDUSTRY LTIFR1 LEADING 1.08 Industry Average2 1,400 koz GROUP ACHIEVED FY TOP END OF PRODUCTION (For continuing operations) GUIDANCE 1,315-1,400koz Guidance ~$928/oz GROUP

  12. Slide 12: Strong Construction Track Record

    CEO INTRODUCTION 2 STRONG CONSTRUCTION TRACK RECORD PROJECT DEVELOPMENT Five recent builds integrated within our business AGBAOU, CÔTE D’IVOIRE, BOUNGOU, BURKINA FASO WAHGNION, BURKINA FASO BUILT IN 2014 BUILT IN 2018 BUILT IN 2019 TRACK RECORD safely with zero LTIs HOUNDÉ, BURKINA FASO ITY CIL, CÔT

  13. Slide 13: Project Pipeline

    2 PROJECT PIPELINE PROJECT DEVELOPMENT Strong competition for capital on a returns basis across the portfolio +110 EXPLORATION PROPERTIES 7 DEVELOPMENT PROJECTS 6 MINING OPERATIONS Current high priority efforts: In construction: Optimization initiatives: Siguiri Sia/Sianikoui Lafigué Sabodala-Massaw

  14. Slide 14: Key Projects

    4 2 44 KEY PROJECTS PROJECT DEVELOPMENT Sabodala-Massawa expansion and Lafigué construction are both underway BROWNFIELD PROJECT: GREENFIELD PROJECT: SABODALA-MASSAWA EXPANSION LAFIGUÉ ON FETEKRO PROPERTY DFS INSIGHTS: DFS INSIGHTS: ▪ Incremental annual production of 194koz over the first five years

  15. Slide 15: Largest Exploration Presence in West Africa

    3 LARGEST EXPLORATION PRESENCE IN WEST AFRICA UNLOCKING EXPLORATION VALUE Endeavour has a strategic foothold in two of West Africa’s most prospective belts 60% of greenstone belt lies in Burkina Faso and Côte d’Ivoire but… KOFI LIPTAKO SIGUIRI NABANGA …only represents ~30% of production BANTOU since

  16. Slide 16: Proven Ranking and Screening Methodology

    Watch 3 PROVEN RANKING AND SCREENING METHODOLOGY video UNLOCKING EXPLORATION VALUE Based on techniques used in the oil and gas sector Exhaustive Screened through multi- All screening based 150 criteria data analysis to targets on geological data targets set targets amenable to 110 and first selectio

  17. Slide 17: Strong Exploration Track Record

    3 STRONG EXPLORATION TRACK RECORD UNLOCKING EXPLORATION VALUE Achieved 5-year discovery target of 10-15Moz Total Indicated discoveries and targets Indicated resources discovered Exploration spend 11.5Moz 3.0Moz Discovered 11.5Moz Discovered from 2.2Moz mid-2016 to 2021 2.1Moz 1.9Moz 1.3Moz <$25/oz 1

  18. Slide 18: Strong Exploration Track Record: 15-20Moz Target

    3 STRONG EXPLORATION TRACK RECORD UNLOCKING EXPLORATION VALUE Targeting discovery of more than 2x production depletion over 2021-2025 period 5-year resource discovery target Risked mean Indicated resource discovery target (2021 - 2025) M&I resource as at 31 December, 2020 15-20Moz $/oz Target discov

  19. Slide 19: Major Greenfield Discovery in Côte d'Ivoire

    3 MAJOR GREENFIELD DISCOVERY IN CÔTE D’IVOIRE UNLOCKING EXPLORATION VALUE Tanda-Iguela property has the potential to be another flagship asset for Endeavour INSIGHTS › Maiden resource outlined in <15 months for a discovery cost of <$10 per Indicated ounce › Indicated resource of 14.9Mt at 2.35g/t fo

  20. Slide 20: Focused on Long Life and Low AISC Assets

    4 FOCUSED ON LONG LIFE AND LOW AISC ASSETS ACTIVE PORTFOLIO MANAGEMENT Divested non-core assets and integrated five mines Key achievements across 4 pillars Endeavour’s Portfolio Core Mine Divested / Ceased Mine Construction Project1 Expanding Sabodala-Massawa AISC, $/oz Realised synergies Built Houn

  21. Slide 21: Production Outlook

    PRODUCTION OUTLOOK Ability to grow high-quality production while maintaining industry-leading AISC Production and AISC For discontinued operations For continuing operations1 Start of Full year Sabodala- benefit of Massawa both projects expansion & Lafigué 1.6Moz +1.6Moz <$950/oz +1.5Moz Full year <$

  22. Slide 22: Strong Cash Generation

    STRONG CASH GENERATION Provides ability to fund capital allocation priorities Operating Cash Flow and Capital expenditure Operating Cash Flow Capital Expenditures1 Realized Gold Price INVESTMENT PHASE CASH FLOW PHASE +$ 426m Operating CF FY-2021 vs. FY-2020 $1,175m $749m +57% $223m $251m $302m $233m

  23. Slide 23: Net Cash Evolution

    NET CASH EVOLUTION Strong net cash position supports shareholder returns and growth Net Cash Evolution (Net Debt)/ Net Cash 1.53B INVESTMENT DEBT REDUCTION SHAREHOLDER RETURNS PHASE PHASE PHASE WITH ABILITY TO FUND GROWTH $217m $ $167m $75m $76m $121m Available Liquidity $3m as at 31 Dec. 2022 Cash

  24. Slide 24: Attractive Shareholder Returns

    ATTRACTIVE SHAREHOLDER RETURNS $637m of cumulative returns since programme began SHAREHOLDER RETURNS POLICY Progressive Dividend Policy Supplemental Dividend Minimum Dividend Paid $200m Minimum Progressive Dividend ($0.81/sh) › In 2021, Endeavour implemented a minimum $140m $50m progressive dividend

  25. Slide 25: Return on Capital Employed

    RETURN ON CAPITAL EMPLOYED Significant improvement following build of our Ity and Houndé mines Return on Capital Employed (ROCE)1 20% 18% 18% 2021 ROCE 10% 6% 6% +20% ROCE target with strong capital allocation discipline 2017 2018 2019 2020 2021 (1) EBIT (Adjusted EBITDA as in MD&A less depreciation

  26. Slide 26: London Stock Exchange Listing Progress

    LONDON STOCK EXCHANGE LISTING PROGRESS Strong UK liquidity growth following premium LSE listing in Q2-2021 Volume traded on LSE compared to the TSX1 42% 42% 38% 37% 33% FTSE of shares outstanding 250 in the UK register FTSE ALL SHARE 26% >40% 23% FTSE 100 of daily volume in the UK in Q4-2022 Q3-2021

  27. Slide 27: Ability to Reward Shareholders Across Cycles

    Watch ABILITY TO REWARD SHAREHOLDERS ACROSS CYCLES video Underpinned by a resilient business, disciplined capital allocation and a strong competitive advantage in West Africa RESILIENT BUSINESS + DISCIPLINED CAPITAL ALLOCATION High Quality Being a Prudent Balance Sheet Organic Shareholder Returns Po

  28. Slide 28: Financial Results and Outlook

    FINANCIAL RESULTS AND OUTLOOK 2 28

  29. Slide 29: Strong Achievements in 2022

    STRONG ACHIEVEMENTS IN 2022 Key Themes: STRONG OPERATIONAL HEALTHY ATTRACTIVE PERFORMANCE FINANCIAL POSITION SHAREHOLDER RETURNS 2022 Scorecard 2022 TARGET 2022 ACHIEVEMENT COMMENT Production, koz 1,315 - 1,400 1,400 Achieved AISC, $/oz 880 - 930 ~928 Achieved Leverage <0.5x Net Debt/adj. EBITDA LTM

  30. Slide 30: Production and AISC

    PRODUCTION AND AISC Consistent performance compared to previous year Production and AISC Production from discontinued operations 1,516koz -3% Production from continuing operations AISC from continuing operations (US$/oz) 1,410koz Production from Continuing Operations FY-2022 vs. FY-2021 803koz 651ko

  31. Slide 31: Production and AISC

    PRODUCTION AND AISC Improved Q4-2022 performance vs. Q3-2022 Production and AISC from continuing operations Production (koz) AISC (US$/oz) +3% 378koz 357koz 355koz 345koz 343koz Production Q4-2022 vs Q3-2022 $954/oz $960/oz ~$954/oz $894/oz $848/oz -1% All-In Sustaining Cost Q4-2022 vs Q3-2022 Q4-20

  32. Slide 32: Tackling Inflationary Pressures

    4 TACKLING 44 INFLATIONARY PRESSURES Benefit of long-term contracts and optimization initiatives Fuel Average fuel price variance, $/L › Fuel price is regulated by in-country based pricing Q3-2021 Q2-2022 Q3-2022 Q4-2022 mechanisms where prices are revised periodically, sheltering Endeavour from pea

  33. Slide 33: 2023 Guidance

    2023 GUIDANCE INSIGHTS Consolidated Production Guidance 2023 FULL-YEAR 2022 ACTUALS (All amounts in koz, on a 100% basis) GUIDANCE › Production guidance for FY-2023 amounts to 1,325-1,425koz, which marks an increase over Ity 313 285 — 300 the FY-2022 guidance of 1,315-1,400koz Houndé 295 270 — 285 ›

  34. Slide 34: 2023 Guidance (Continued)

    2023 GUIDANCE (Continued) Capital Expenditure Guidance 2022 ACTUALS 2023 FULL-YEAR (All amounts in US$m) GUIDANCE Boungou 7 5 Houndé 27 40 INSIGHTS Ity 13 25 › Total sustaining and non-sustaining capital expenditure is Mana 10 25 expected to remain consistent with that achieved in FY-2022, at Saboda

  35. Slide 35: Short Term Revenue Protection Programme

    SHORT TERM REVENUE PROTECTION PROGRAMME Increased certainty of cash flow to achieve corporate objectives Gold collars INSIGHTS Gold price in US$/oz › Endeavour entered into a short term revenue Growth and shareholder protection programme for a proportion of its return focus production across FY-2022

  36. Slide 36: Healthy Financial Position

    HEALTHY FINANCIAL POSITION Upcoming debt reduction and significant liquidity sources available Principal Debt Evolution Liquidity Sources (as at 31 December 2022) $1,030m $384m $910m $830m $830m $880m $880m $830m $830m Cash $951m +$ 1.53B assumed from Available Repaid Teranga RCF Liquidity Convertib

  37. Slide 37: Our High Quality Portfolio

    Watch video OUR HIGH QUALITY PORTFOLIO 3 37

  38. Slide 38: Diversified Portfolio of Six Mines

    DIVERSIFIED PORTFOLIO OF SIX MINES P&P RESERVES as at Dec 31, M&I RESOURCES as at Dec 31, 2022 Actuals 2023 Guidance 2021 2021 NAME COUNTRY MINE AISC MINE PRODUCTION AISC CONTAINED GRADE CONTAINED GOLD GRADE PRODUCTION (US$/oz) (koz) (US$/oz) GOLD (Moz) (g/t) (Moz) (g/t) (koz) Houndé Burkina Faso 29

  39. Slide 39: Key Optimisations Initiatives

    KEY OPTIMISATIONS INITIATIVES Continued optimization efforts to tackle inflationary pressures Sabodala-Massawa Ity Houndé ▪ Sabodala in-pit tailings can have +$31m in savings with ▪ Recyn project improves the environmental footprint ▪ Options to reduce energy costs and emissions reduced environmenta

  40. Slide 40: Sabodala-Massawa Mine

    COO video presentation Website Latest technical report SABODALA-MASSAWA MINE Snapshot 315-340koz $760-810/oz 4.4Moz 6.9Moz As at As at 2023 Target 2023 Target 31 December 2021 31 December 2021 Production AISC P&P Reserves M&I Resources1 Overview The Sabodala-Massawa complex has potential to become a

  41. Slide 41: Sabodala-Massawa Mine

    COO video presentation Website Latest technical report SABODALA-MASSAWA MINE Overview KEY OPPORTUNITIES RESERVES AND RESOURCES AS AT 31 DEC. 2021 • BIOX expansion project Resources shown Tonnage Grade Content inclusive of Reserves (on a 100% basis) (Mt) (Au g/t) (Au koz) • On track to discover 2.3 -

  42. Slide 42: Sabodala-Massawa Mine

    COO video presentation Website Latest technical report SABODALA-MASSAWA MINE Higher grade oxide ore in Q4-2022 from Massawa North Zone improved performance Q4-2022 vs Q3-2022 INSIGHTS Production and AISC Production, koz AISC, US$/oz › Production increased due to an increase in processed grade and pl

  43. Slide 43: Sabodala-Massawa Expansion

    SABODALA-MASSAWA EXPANSION Low-capex intensive brownfield expansion is on track INSIGHTS BIOX® REACTORS Processing Plant Foundation › Sabodala-Massawa DFS defined a robust expansion Neutralisation project adding a 1.2Mtpa BIOX® plant, designed to process the high-grade refractory ore from the Massaw

  44. Slide 44: Sabodala-Massawa Expansion

    SABODALA-MASSAWA EXPANSION BIOX® plant construction lifts Sabodala-Massawa mine to top tier status Sabodala-Massawa mine plan 2022 Guidance mid-point BIOX® production CIL production 450Koz Targeting production +400koz per annum 400Koz 350Koz 300Koz 250Koz 200Koz 150Koz 100Koz 50Koz 0Koz 2021A1 2022

  45. Slide 45: Robust Economics for the Expansion Project

    CORPORATE PRESENTATION Expansion Project Highlights (excludes current CIL operation) SABODALA-MASSAWA FIRST FIVE YEARS LIFE OF MINE Senegal (2024-2028) (2024-2033) OPERATING SUMMARY Tonnes processed, Mt 5.7 10.8 Strip ratio, W:O 7.7 8.5 ROBUST ECONOMICS Grade processed, Au g/t Gold contained process

  46. Slide 46: Sabodala-Massawa Expansion

    SABODALA-MASSAWA EXPANSION Scope changes in DFS compared to PFS AREA DESCRIPTION OF CHANGE EXPECTED RESULT Capital cost estimates Additional geometallurgical work has reclassified Removes risk associated with blending transitional and fresh CAPITAL fresh and transitional ore from the Massawa ore wit

  47. Slide 47: Sabodala-Massawa Mine Discovery Target

    DISCOVERY TARGET (2021-2025) SABODALA-MASSAWA MINE Senegal 2.3 - 2.7Moz $26/oz Indicated resources Discovery cost M&I RESOURCES as at 31 December 2021 110Mt at 1.94g/t au containing 6.88Moz NEAR-TERM FOCUS Discovery of additional high-grade refractory and non-refractory ore resources. Explore high-g

  48. Slide 48: Discovery Track Record

    DISCOVERY TRACK RECORD Resource base continues to grow net of depletion M&I resource additions versus depletion M&I Resource at year end Cumulative Depletion +10Moz 10.0Moz 9.3Moz 9.3Moz 3.1Moz 2.4Moz 2.7Moz Defined gold 6.3Moz endowment 6.1Moz 6.2Moz 1.6Moz1 1.9Moz 2.1Moz 6.9Moz 6.9Moz 6.6Moz 6.9Mo

  49. Slide 49: Near Term Exploration Focus

    EXPLORATION NEAR TERM EXPLORATION FOCUS Focussed on increasing near-mine non-refractory resources INSIGHTS › Phased approach to property wide exploration programme through a review of the existing data, to prioritise drill targets and further soil sampling programmes › Exploration in 2020 and 2021 w

  50. Slide 50: Kiesta

    KIESTA High-grade intercepts at the Kiesta discovery are being delineated INSIGHTS › The Kiesta target is located along the Sabodala Shear Zone › The deposit is located in the north of the Massawa mining license, approximately 18 kilometers southeast of the Sabodala-Massawa processing plant › Follow

  51. Slide 51: Bambaraya

    BAMBARAYA Resource increased at Bambaraya deposit INSIGHTS › The Bambaraya deposit is located in the northwest corner of the Massawa mining license, approximately 13 kilometers south of the Sabodala-Massawa processing plant › Following successful exploration work during H1-2022, an updated mineral r

  52. Slide 52: Bambaraya

    BAMBARAYA Mineralisation from surface extending over 2,000m along strike

  53. Slide 53: Sofia North Extension

    SOFIA NORTH EXTENSION Shallow high grade mineralisation extending for over 800m along strike 53

  54. Slide 54: Ity Mine

    COO video presentation Website Latest technical report 3D mine site tour ITY MINE Snapshot 285-300koz $840-915/oz 3.0Moz 4.5Moz As at As at 2023 Target 2023 Target 31 December 2021 31 December 2021 Production AISC P&P Reserves M&I Resources1 Overview The Ity mine is one of Endeavour’s cornerstone as

  55. Slide 55: Ity Mine

    COO video presentation Website Latest technical report 3D mine site tour ITY MINE Overview KEY OPPORTUNITIES RESERVES AND RESOURCES AS AT 31 DEC. 2021 Tonnage Grade Content • Continued inclusion of new discoveries, including Le Plaque, to Resources shown (Mt) (Au g/t) (Au koz) provide greater mining

  56. Slide 56: Ity Mine

    COO video presentation Website Latest technical report 3D mine site tour ITY MINE Throughput improved in Q4-2022 as the asset exited the rainy season Q4-2022 vs Q3-2022 INSIGHTS Production and AISC › Production remained flat as lower processed grades were Production, koz AISC, US$/oz offset by highe

  57. Slide 57: Ity Mine

    COO video presentation Website Latest technical report 3D mine site tour ITY MINE Overview Ity production plan 2023 Guidance Incremental production added 2017 Optimization Study 350koz 300koz Target production of 250koz over +10 years expected to be achieved based on exploration potential and furthe

  58. Slide 58: Ity Mine Recyanidation Project

    ITY MINE Recyanidation Project INSIGHTS 3D Model › Recyanidation circuit aims to: ‒ optimise costs by reducing leaching and detox reagent consumption ‒ improving the quality of the discharge water ‒ increasing production through higher recovery rates › The Recyanidation process reduces cyanide consu

  59. Slide 59: Ity Mine Discovery Target

    DISCOVERY TARGET (2021-2025) ITY MINE Côte D’Ivoire 3.5 – 4.5Moz $17/oz Indicated resources Discovery cost M&I RESOURCES as at Dec 31, 2021 90Mt at 1.56g/t au containing 4.48Moz NEAR-TERM FOCUS 3.3Moz discovered since 2016 with +10 year mine life. Focus to maintain and extend mine life through high

  60. Slide 60: Discovery Track Record

    DISCOVERY TRACK RECORD Resource base continues to grow net of depletion M&I Resource2 additions versus depletion Cumulative depletion M&I Resource at year end 6.9Moz 6.9Moz 5.9Moz 5.7Moz 2.5Moz 5.2Moz 5.3Moz Defined gold 1.9Moz 2.1Moz endowment 4.2Moz 1.5Moz 1.6Moz 1.5Moz1 2.7Moz 4.5Moz 3.7Moz 3.6Mo

  61. Slide 61: Ity Resource Model

    ITY RESOURCE MODEL Evolution of resource model (3D view looking North) 2017 Ity area resource model 2022 Ity area resource model 61

  62. Slide 62: Near Term Exploration Focus

    NEAR TERM EXPLORATION FOCUS Focussed on high-grade oxide at near mine targets and Le Plaque INSIGHTS › An exploration programme of $10.0m is planned for FY-2022, of which $8.0m has been spent in YTD-2022 with $3.5m spent in Q3-2022 consisting of 13,500 meters of drilling across 72 drill holes. The e

  63. Slide 63: West Flotouo

    WEST FLOTOUO High grade discovery close to the Ity CIL plant West Flotouo Plan Map West Flotouo Cross Section VO21-165 8.4m @ 4.57 g/t Au 5.9m @ 14.55 g/t Au VO21-176 25.8m @ 4.91 g/t Au 4.2m @ 10.85 g/t Au VO21-158 14.8m @ 3.04 g/t Au 5.9m @ 10.65 g/t Au VO21-096 25.2m @ 13.00g/t Au 3.7m @ 11.01g/t

  64. Slide 64: Le Plaque

    LE PLAQUE Updated resources extended mineralisation INSIGHTS Le Plaque Exploration Targets › During the 2021 drilling campaign, an updated mineral resource was defined at Le Plaque, extending mineralisation towards Le Plaque SW and at depth at Delta Extension › The high grade Le Plaque deposit has b

  65. Slide 65: Delta Extension

    DELTA EXTENSION Mineralisation extends below pit shell 65

  66. Slide 66: Walter-Bakatouo

    WALTER-BAKATOUO Near mine low strip ratio resources added WA21-052 5m @ 17.02 g/t Au WA21-074 3m @ 4.35 g/t Au 26.9m @ 3.24 g/t Au 6m @ 2.7 g/t Au WA21-033 WA21-025 18.4m @ 2.73 g/t Au 2m @ 39.84 g/t Au 23m @ 4.29 g/t Au 6.4m @ 3.86 g/t Au WA21-022 11m @ 2.54 g/t Au WA21-060 16.9m @ 6.20 g/t Au 19m

  67. Slide 67: Gbampleu

    GBAMPLEU New discovery is a promising target on the Toulepleu-Ity greenstone belt INSIGHTS Gbampleu selected drill holes › The Gbampleu prospect is located in the Toulepleu exploration permit (PR462), 22km south of the Ity plant. The prospect sits in the center part of the Toulepleu-Ity greenstone b

  68. Slide 68: Gbampleu

    GBAMPLEU New discovery is a promising target on the Toulepleu-Ity greenstone belt 68

  69. Slide 69: Houndé Mine

    COO video presentation Website Latest technical report 3D mine site tour HOUNDÉ MINE Burkina Faso 270-285koz $850-925/oz 2.5Moz 5.2Moz As at As at 2023 Target 2023 Target December 31, 2021 December 31, 2021 Production AISC P&P Reserves M&I Resources1 Overview The Houndé mine is one of Endeavour’s Th

  70. Slide 70: Houndé Mine

    COO video presentation Website Latest technical report 3D mine site tour HOUNDÉ MINE Burkina Faso KEY OPPORTUNITIES RESERVES AND RESOURCES AS AT DEC. 31, 2021 Resources shown Tonnage Grade Content • Greater mining flexibility with multiple available ore sources inclusive of Reserves (on a 100% basis

  71. Slide 71: Houndé Mine

    COO video presentation Website Latest technical report 3D mine site tour HOUNDÉ MINE Record mill throughput achieved in Q3-2022 Q4-2022 vs Q3-2022 INSIGHTS Production and AISC › Production decreased due to lower processed grades, which Production, koz AISC, US$/oz was slightly offset by higher mill

  72. Slide 72: Houndé Mine

    COO video presentation Website Latest technical report 3D mine site tour HOUNDÉ MINE Burkina Faso Houndé production plan 2023 Guidance mid-point Incremental production added 2016 Optimization Study 300Koz Target production of 250koz over +10 years expected to be achieved based on exploration potenti

  73. Slide 73: Houndé Mine Discovery Target

    DISCOVERY TARGET (2021-2025) HOUNDÉ MINE Burkina Faso 3.0 – 4.0Moz $19/oz Indicated resources Discovery cost M&I RESOURCES as at Dec 31, 2021 104Mt at 1.55g/t au containing 5.17Moz NEAR-TERM FOCUS Focused on maintaining +10-year mine life. Focused on near mill targets such as Kari Area, Vindaloo Sou

  74. Slide 74: Discovery Track Record

    DISCOVERY TRACK RECORD Resource base continues to grow net of depletion M&I Resource additions versus depletion M&I Resource at year end Cumulative Depletion 6.4Moz 6.4Moz 5.5Moz 1.2Moz 0.9Moz Defined gold 4.5Moz endowment 0.6Moz 3.5Moz 0.4Moz 2.6Moz 2.5Moz 3.8Moz 0.1Moz 5.2Moz 4.6Moz 3.9Moz 3.1Moz

  75. Slide 75: Near Term Exploration Focus

    NEAR TERM EXPLORATION FOCUS Focused on Sianikoui and Dohoun, and Vindaloo South targets INSIGHTS Houndé plan map highlighting soil geochemical anomalies › An exploration programme of $14.0m is planned for FY- 2022, of which $10.9m has been spent YTD-2022 with $5.3m spent in Q3-2022 consisting of 8,0

  76. Slide 76: Mambo

    MAMBO Delineation of the Mambo discovery INSIGHTS Mambo geology and drilling intercepts › Mambo is an attractive deposit as it is expected to have a low strip ratio, the resource contains approximately 40% oxide and transitional material › The higher-grade portion (+2g/t) of the Mambo deposit is exp

  77. Slide 77: Mambo

    MAMBO Down dip mineralisation extension remains open 77

  78. Slide 78: Golden Hill Exploration

    GOLDEN HILL EXPLORATION Potential to integrate within the Houndé mine plan INSIGHTS › Advanced-stage exploration project on the Houndé Belt within trucking distance (25-30 kilometers) of the Houndé mine › Potential for development as a satellite deposit › Expansive exploration licenses covering 468k

  79. Slide 79: Sianikoui

    SIANIKOUI Drilling to continue through the year at high-grade target north of Kari area 79

  80. Slide 80: Vindaloo Drill Programme

    VINDALOO DRILL PROGRAMME Drill programme focussing on delineating the Vindaloo South deposit INSIGHTS › Following FY-2021 positive first pass drilling results, 28 new holes were drilled, including 26 RC holes (3,654 meters) and 2 DDH (380 meters) for a total of 4,034 meters drilled to determine the

  81. Slide 81: Vindaloo South Section

    VINDALOO SOUTH SECTION Mineralisation remains open at depth 81

  82. Slide 82: Wahgnion Mine

    COO video presentation Website Latest technical report 3D mine site tour WAHGNION MINE Burkina Faso 150-165koz $1,250-1,350/oz 1.1 Moz 1.9 Moz As at As at 2023 Target 2023 Target December 31, 2021 December 31, 2021 Production AISC P&P Reserves M&I Resources1 Overview The Wahgnion mine offers cash fl

  83. Slide 83: Wahgnion Mine

    COO video presentation Website Latest technical report 3D mine site tour WAHGNION MINE Burkina Faso KEY OPPORTUNITIES RESERVES AND RESOURCES AS AT DEC. 31, 2021 • Greater mining flexibility following the commissioning of Resources shown Tonnage Grade Content the Samovogo satellite deposits later thi

  84. Slide 84: Wahgnion Mine

    COO video presentation Website Latest technical report 3D mine site tour WAHGNION MINE Mining commenced at Samavogo in late Q3-2022 Q4-2022 vs Q3-2022 INSIGHTS Production and AISC Production, koz AISC, US$/oz › Production increased due to higher processed grades which was partially offset by slightl

  85. Slide 85: Wahgnion Mine Discovery Target

    DISCOVERY TARGET (2021-2025) WAHGNION MINE Burkina Faso 1.5 – 2.0Moz $25/oz Indicated resources Discovery cost M&I RESOURCES as at Dec 31, 2021 41Mt at 1.48g/t Au containing 1.94Moz NEAR-TERM FOCUS Extend mine life to +10 years through discovery of additional satellite deposits within trucking dista

  86. Slide 86: Wahgnion Mine

    WAHGNION MINE Significant exploration potential exists within the permitted mine license INSIGHTS Nogbele South: Significant Indicated resource potential › An exploration programme of $9.0m is planned for FY-2022, of which $7.0m has been spent YTD-2022 with $2.2m spent in Q3-2022 consisting of 9,800

  87. Slide 87: Ouahiri South

    OUAHIRI SOUTH Large soil anomaly on the project permit located 8km to the west of the mine 87

  88. Slide 88: Mana Mine

    COO video presentation Website Latest technical report 3D mine site tour MANA MINE Burkina Faso 190-210koz $950-1,050/oz 1.2 Moz 2.3 Moz As at As at 2023 Target 2023 Target December 31, 2021 December 31, 2021 Production AISC P&P Reserves M&I Resources1 Overview The Mana mine is located in the northe

  89. Slide 89: Mana Mine

    COO video presentation Website Latest technical report 3D mine site tour MANA MINE Burkina Faso KEY OPPORTUNITIES RESERVES AND RESOURCES AS AT DEC. 31, 2021 • Mine life extensions through open pit and underground exploration Tonnage Grade Content Resources shown (Mt) (Au g/t) (Au koz) • Transitionin

  90. Slide 90: Mana Mine

    COO video presentation Website Latest technical report 3D mine site tour MANA MINE Mining at the Maoula satellite pit started in Q4-2022 Q4-2022 vs Q3-2022 INSIGHTS Production and AISC › Production increased due to higher processed grades Production, koz AISC, US$/oz and gold recovery rates, partial

  91. Slide 91: Mana Mine Discovery Target

    DISCOVERY TARGET (2021-2025) MANA MINE Burkina Faso 1.0 – 1.5Moz $30/oz Indicated resources Discovery cost M&I RESOURCES as at Dec 31, 2021 38Mt at 1.89 g/t Au containing 2.29Moz NEAR-TERM FOCUS Extend mine life to +10 years through exploration of Siou underground, Wona underground as well as explor

  92. Slide 92: Near Term Exploration Focus

    NEAR TERM EXPLORATION FOCUS Focus on discovering new oxide potential Mana exploration map INSIGHTS › An exploration programme of $6.0m is planned for FY- 2022, of which $5.6m has been spent year to date with $0.3m spent in Q3-2022 consisting of 21,100 meters of drilling across 204 drill holes focuse

  93. Slide 93: Maoula

    MAOULA Open pit oxide target 93

  94. Slide 94: Maoula

    MAOULA Mineralisation open between east and west structures NW MARC21-214 Base line MARC21-208 4.0m @ 3.33 g/t \ 14m SE 5.0m @ 1.99 g/t \ 25m 4.0m @ 1.35 g/t \ 21m 6.0m @ 1.53 g/t \ 69m MARC21-207 8.0m @ 2.09 g/t \ 26m Laterite MARC21-209 300m RL 5.0m @ 3.63 g/t \ 118m MARC21-210 7.0m @ 3.29 g/t \ 1

  95. Slide 95: Nyafe Sud

    NYAFE SUD Drilling focussed on delineating under explored refractory ore potential NYRC22-008 NYRC22-009 NYDD21-002 6 m @ 1.57 g/t \ 101m 6 m @ 1.99 g/t \ 55m 4.0 m @ 3.67 g/t \ 38.0m 1 m @ 1.50 g/t \ 153m 1 m @ 1.37 g/t \ 94m 1.2 m @ 1.99 g/t \ 97.1m 1 m @ 4.05 g/t \ 159m 3 m @ 2.69 g/t \ 97m 95

  96. Slide 96: Boungou Mine

    COO video presentation Website Latest technical report 3D mine site tour BOUNGOU MINE Burkina Faso 115-125koz $985-1,075/oz 1.1 Moz 1.4 Moz As at As at 2023 Target 2023 Target December 31, 2021 December 31, 2021 Production AISC P&P Reserves M&I Resources1 Overview The Boungou mine is a low cost, hig

  97. Slide 97: Boungou Mine

    COO video presentation Website Latest technical report 3D mine site tour BOUNGOU MINE Burkina Faso KEY OPPORTUNITIES RESERVES AND RESOURCES AS AT DEC. 31, 2021 • Discovery of new deposits to maintain higher grade profile Resources shown Tonnage Grade Content inclusive of Reserves (on a 100% basis) (

  98. Slide 98: Boungou Mine

    COO video presentation Website Latest technical report 3D mine site tour BOUNGOU MINE Grade sequencing of the mine plan is influencing the production profile Q4-2022 vs Q3-2022 INSIGHTS Production and AISC Production, koz AISC, US$/oz › Production decreased due to lower tonnes milled and a slightly

  99. Slide 99: Boungou Mine Discovery Target

    DISCOVERY TARGET (2021-2025) BOUNGOU MINE Burkina Faso 1.0 – 1.5Moz $32/oz Indicated resources Discovery cost M&I RESOURCES as at Dec 31, 2021 11Mt at 3.85g/t Au containing 1.38Moz NEAR-TERM FOCUS Extend mine life to +10 years through exploration of near mine targets Boungou North, Natougou SW, Nato

  100. Slide 100: Near Term Exploration Focus

    NEAR TERM EXPLORATION FOCUS Focused on the Osaanpalo and Boungou East targets INSIGHTS Boungou Exploration Map › An exploration programme of $4.0m is planned for FY- 2022, of which $1.9m has been spent YTD-2022 with $0.3m spent in Q3-2022. The exploration programme has been focused on identifying ne

  101. Slide 101: Near Mine Targets at Boungou

    NEAR MINE TARGETS AT BOUNGOU Osaanpalo, Boungou East, and Tawori are targets close to the plant Osaanpalo Boungou Est Tawori 101

  102. Slide 102: Lafigué Project

    Website 3D mine site tour LAFIGUÉ PROJECT Côte D’Ivoire 203koz $871/oz 2.7Moz 3.0Moz As at As at Life of Mine annual Life of Mine annual June 1, 2022 May 15, 2022 Production AISC P&P Reserves M&I Resources1 Overview The Lafigué project will become Endeavour’s next cornerstone asset. It also demonstr

  103. Slide 103: Lafigué Project DFS Confirms Potential Cornerstone Asset

    Lafigué Project DFS highlights LAFIGUÉ PROJECT PLANT TYPE, SIZE & CAPEX Plant type Gravity / CIL Côte D’Ivoire Mill capacity 4.0 Upfront capital cost, $m 448 RESERVES & RESOURCES P&P Reserves, koz 49.8Mt at 1.69 g/t for 2.7Moz DFS CONFIRMS M&I Resources, koz 46.3Mt at 2.03 g/t for 3.0Moz Inferred Re

  104. Slide 104: Lafigué Project: Long Life and Low AISC Operation

    Website 3D mine site tour LAFIGUÉ PROJECT Long life and low AISC operation Lafigué production plan DFS Production DFS AISC 300koz 250koz $2,000/oz 203Koz $1,600/oz Average annual Target production of +200koz Production over LOM 200koz $1,200/oz 150koz +33% $800/oz 100koz $400/oz 50koz Incremental pr

  105. Slide 105: Lafigué Project

    Website 3D mine site tour LAFIGUÉ PROJECT Endeavour’s next cornerstone asset Lafigué Project - Earthworks underway PROJECT UPDATES › Construction of the Lafigué development project on the Fetekro property was launched on 17 October 2022, following completion of a robust DFS that confirmed Lafigué’s

  106. Slide 106: Lafigué Process Plant Layout

    Lafigué process plant layout LAFIGUÉ PROJECT Côte D’Ivoire Mining • Open-pit drill & blast mining will be carried out by contractors with a maximum mining capacity of 55Mt per year • Fleet will comprise 400t class face shovels to load 180t capacity trucks for waste, and 200t class excavators to load

  107. Slide 107: Lafigué Project Discovery Target

    DISCOVERY TARGET (2021-2025) LAFIGUÉ PROJECT Côte D’Ivoire 1.5 – 2.0Moz $45/oz Indicated resources Discovery cost M&I RESOURCES as at May 15, 2022 46Mt at 2.03g/t Au containing 3.03Moz NEAR-TERM FOCUS 3.03Moz of M&I resources have been discovered since 2018 with the aim to further extend the Lafigué

  108. Slide 108: Fetekro Exploration Property

    FETEKRO EXPLORATION PROPERTY Eight high priority targets to be followed up with over the next year INSIGHTS Fetekro Exploration permit select intercepts › Targeting the discovery of 1.5–2.0 Moz of Indicated resources across the Fetekro exploration permit area over the 2021-2025 period at a discovery

  109. Slide 109: Lafigué North

    LAFIGUÉ NORTH Section 320205 109

  110. Slide 110: Lafigué Center

    LAFIGUÉ CENTER Section 319830 110

  111. Slide 111: Tanda & Iguela

    INSIGHTS › Maiden resource outlined very quickly (under 15 months) since discovery was made at a low discovery cost of <$10 per indicated ounce TANDA & IGUELA Côte D’Ivoire TONNAGE GRADE CONTENT (Mt) (Au g/t) (Au koz) Indicated 14.9 2.33 1,114 Inferred 32.9 1.80 1,903 › Tanda-Iguela property has the

  112. Slide 112: Assafou Deposit

    ASSAFOU DEPOSIT Target remains open along depth and strike INSIGHTS Assafou Geological Context › Assafou mineralised system has now been defined over an area which is approximately three kilometres in length and 350 metres in width, extending from surface to depths exceeding 300 metres › The 2022 de

  113. Slide 113: Assafou Deposit

    ASSAFOU DEPOSIT Select intercepts exceeded 100 metres in true thickness at above 3.00g/t gold Assafou section 2166 Assafou section 2433 113

  114. Slide 114: Assafou Deposit

    ASSAFOU DEPOSIT Periphery intercepts of the Indicated Resource show potential for continuity Assafou section A2700 at Northwest limit of the indicated resource boundary Assafou A2800 showing high grade intercepts outside the indicated resource boundary towards Northwest 114

  115. Slide 115: Assafou Deposit

    ASSAFOU DEPOSIT Periphery intercepts of the Indicated Resource show potential for continuity Assafou Section A1800 showing inferred resource high grade intercepts 200m Assafou Section A0400 showing intercepts 2 km outside of the indicated resource to SE of the Indicated resource boundary boundary to

  116. Slide 116: Guitry - Krakouadiokro

    INSIGHTS › Located on the southern extension of the Houndé greenstone belt which is largely underexplored in GUITRY - KRAKOUADIOKRO Côte D’Ivoire Côte d’Ivoire › Mineralisation occurs in moderately to steeply dipping subparallel brittle-ductile graphitic shear zones in contact between sediments and

  117. Slide 117: Kalana Project

    PFS press release Website Latest technical report KALANA PROJECT Mali QUICKFACTS (ON 100% BASIS) – 2021 UPDATED PFS RESERVES AND RESOURCES AS AT DEC. 31, 2021 Ownership 80% EDV; 20% Mali government Mine Type Open Pit Tonnage Grade Content Mill Type 3.0Mtpa Gravity / CIL Plant Resources shown inclusi

  118. Slide 118: Kalana 2016 vs. 2021 Study Comparison

    KALANA PROJECT Kalana 2016 vs. 2021 Study Comparison1 Mali 2021 STUDY 2016 STUDY VARIANCE PLANT SIZE & CAPEX Nominal mill capacity, Mtpa 3.0 1.2 +150% Upfront capital cost, $m 297 196 +51% › Key changes in updated PFS compared to LIFE OF MINE STATS the 2016 Avnel study: Mine life, years 11 18 -39% ‒

  119. Slide 119: Kalana Project

    Kalana license and exploration targets KALANA PROJECT Mali › Discovery of additional deposits may provide an extension of the Kalana mining operation. In addition, potential high-grade free-digging soft material may provide further operating flexibility › The Kalanako Northwest area is highly prospe

  120. Slide 120: Bantou Project

    INSIGHTS › Acquired through Endeavour’s acquisition of SEMAFO in 2020 and currently consists of eight mineralised zones with diverse BANTOU PROJECT mineralisation styles and grades within the prolific Houndé Burkina Faso Greenstone Belt › The inferred resource is comprised of three main areas with t

  121. Slide 121: Nabanga Project

    INSIGHTS Nabanga deposit plan map and schematic cross-section › Located 250 kilometres southeast of Ouagadougou, the Nabanga Gold NABANGA PROJECT Project lies within the Nabanga Burkina Faso exploration permit. › Results of Preliminary Economic Assessment (PEA) released on September 30, 2019. ‒ Pre-

  122. Slide 122: Greenfield Liguidi

    122 GREENFIELD LIGUIDI Burkina Faso

  123. Slide 123: Greenfield Siguiri Licenses

    123 GREENFIELD SIGUIRI LICENSES Guinea

  124. Slide 124: Greenfield Nassile / Da-Guity

    INSIGHTS › Highly prospective area of Nassile and Dar-Guiti Niger GREENFIELD NASSILE / DA-GUITY › Exploration Permit obtained in 2017 › Exploration Permit covers a total surface area of 695km² 124

  125. Slide 125: Greenfield Kofi

    INSIGHTS › Kofi on same trend as Barrick’s Loulo- Mali GREENFIELD KOFI Gounkoto in Mali › Exploration license of Kofi not sold in Tabakoto sales process › Aim is to attain additional license around Kofi North/Netekoto to consolidate exploration cluster 125

  126. Slide 126: Being a Trusted Partner

    Watch video BEING A TRUSTED PARTNER 4 126

  127. Slide 127: Our Purpose Is to Produce Gold That Provides Lasting Value

    OUR PURPOSE IS TO PRODUCE GOLD THAT PROVIDES LASTING OURVALUE PURPOSETO IS TOSOCIETY PRODUCE GOLD THAT PROVIDES LASTING VALUE TO SOCIETY We achieve this by... Protecting and promoting the Helping to create resilient and Trusted to unlock the full benefits places where we operate self-sustaining comm

  128. Slide 128: Improving Our Transparency & Disclosure

    IMPROVING OUR TRANSPARENCY & DISCLOSURE As our company has grown, so have our ESG initiatives and commitments 2022 • New Code of Business 2021 Conduct and Ethics • External assurance on key 2020 ESG data • New Group-wide Tailings Management Policy • 1st RGMP externally • 7 RGMPs externally assured a

  129. Slide 129: Continuous Improvement in ESG Ratings

    CONTINUOUS IMPROVEMENT IN ESG RATINGS Sustainability efforts underpin top ESG ratings Sustainalytics 2022 Scores1 Endeavour MSCI rating evolution2 Newmont Endeavour 2022 2022 AA Yamana Kirkland Gold Fields Agnico Eagle AngloGold Ashanti 2021 A Newcrest B2 Gold CCC Endeavour 2021 AA 17% 25% Kinross 2

  130. Slide 130: Continuous Improvement in ESG Ratings

    CONTINUOUS IMPROVEMENT IN ESG RATINGS Reflecting increased transparency, disclosure and engagement 2019 2022 2019 23.9 /100 Medium Risk 2022 Relative Performance 2020 2022 2020 2019 2020 2021 Climate D- C C Change Water N/A C C 2021 Forestry ✓ ✓ ✓ Defined targets required to advance to a B rating 13

  131. Slide 131: ESG 2021 Highlights

    ESG 2021 HIGHLIGHTS Strong year delivering against key objectives ZERO HARM ADDRESSING CLIMATE CHANGE INVESTING IN OUR COMMUNITIES Zero Fatalities 0.54tCO2-e/oz emissions intensity, $2.0B in total economic contribution to 0.20 LTIFR, well below industry one of the lowest in the gold sector host coun

  132. Slide 132: Addressing Our Climate Impact

    ADDRESSING OUR CLIMATE IMPACT SNAPSHOT OF OUR POWER SOURCES AND OPPORTUNITIES SENEGAL CÔTE D’IVOIRE BURKINA FASO Country Profile Country Profile Country Profile • 65% Fossil, 35% Renewables (Solar, Wind, Hydro) • Well-developed national infrastructure • 68% Imports, 32% Local Production • 68% Fossil

  133. Slide 133: Greenhouse Gas Emissions Intensity Ranks Favourably

    2021 GHG EMISSIONS INTENSITY Emission Intensity (kt CO2-e/oz) 2.86 1.60 ENDEAVOUR'S GREENHOUSE 1.20 Industry average intensity of 0.901 1.12 GAS EMISSIONS INTENSITY 0.56 0.59 0.69 0.73 0.74 0.78 0.80 0.81 0.54 0.40 RANKS FAVOURABLY IN 0.20 COMPARISON TO PEERS 2020 data 2020 data 2020 data Scope 2 Em

  134. Slide 134: Addressing Our Climate Impact

    ADDRESSING OUR CLIMATE IMPACT ENERGY INTENSITY GHG EMISSION INTENSITY CURRENT STRUCTURE OF OUR Total Energy Consumption (GJ) Scope 1+2 GHG Emissions (kt CO2 Eq) CARBON FOOTPRINT Energy Intensity (GJ/oz) GHG Intensity (ktCO2-e/oz) Scope 1 Scope 2 Scope 3 0.54 7.04 6.41 0.48 853 ktCO2-e 71% 15,447,836

  135. Slide 135: Protecting the Environment: Water Stewardship

    PROTECTING THE ENVIRONMENT Water Stewardship › Our approach is to use water as efficiently as possible › We pay for the water we use, as part of our water permits › 2021 increase in water withdrawal and consumption due to the expanded asset portfolio › We plan to set Group water reduction targets in

  136. Slide 136: Protecting the Environment: Tailings Management

    PROTECTING THE ENVIRONMENT Responsible Tailings Management › Our goal is to ensure Zero Harm through effective TSF management, as governed by our Group Tailings Policy 0 Audited 100% › Conduct regular internal and external audits, results TSF-related Annually audited by are reported back to senior m

  137. Slide 137: Protecting the Environment: Biodiversity

    PROTECTING THE ENVIRONMENT Biodiversity – Protecting Africa’s Fauna & Flora › Goal is to effectively manage biodiversity and reduce our impacts throughout the life of our mines and post closure Protect & Preserve Restore X › We have a multi-pronged approach to protect 600ha 10ha/mine No Mining on Wo

  138. Slide 138: Protecting the Environment: Towards Zero Plastic

    PROTECTING THE ENVIRONMENT Towards ZERO Plastic › Developing a ‘Towards ZERO Plastic’ Strategy › Will be conducting a baseline on waste management during 2022 › Liaising with our mine site supply chains to explore opportunities › Eliminate single use plastic water bottles at all our operations by 20

  139. Slide 139: Creating Jobs & Upskilling Talent

    CREATING JOBS & UPSKILLING TALENT OUR EMPLOYEES OUR SENIOR MANAGERS Nationals Expatriates Nationals Regional Local Communities Local Communities Foreign 56% 38% 5% 95% 55% 12% of employees are West of Senior Managers are 5% African nationals with West African nationals 39% from local communities 39%

  140. Slide 140: Boosting Local Economies

    BOOSTING LOCAL ECONOMIES PROCUREMENT BUDGET PAYMENTS TO GOVERNMENTS ECONOMIC CONTRIBUTION TO National and Local suppliers Senegal Burkina Faso HOST COUNTRIES Foreign Suppliers Cote D’Ivoire Employee salaries, benefits and social invesmtents Payments to Government $89m National procurement 80% $87m $

  141. Slide 141: The Endeavour Foundation

    THE ENDEAVOUR FOUNDATION › Launched in 2021, the Endeavour Foundation is our primary vehicle to implement projects beyond the mine, focused on regional, national and trans-border › Focused on social investment and sustainability $295k › The Great Green Wall Invested in 2021 › Partnership with Senega

  142. Slide 142: ECODEV - Endeavour's Impact Investment Fund

    ECODEV – ENDEAVOUR’S IMPACT INVESTMENT FUND › Established by Endeavour to support national economic growth › Invests in the creation of local long-term, sustainable, SMEs with reputable partners $3.2m Invested 2019 - 2021 › Mali Shi › Mali is 2nd largest producer of shea nut and accounts for ~20% gl

  143. Slide 143: Community Engagement

    COMMUNITY ENGAGEMENT INSIGHTS › 1,825 community consultations in 2021 › Grievance resolution rate improved from 70% to 93% › New Social Responsibility Policy developed and new social performance management system launched › Range of income-generating activities in place, with a focus on the youth an

  144. Slide 144: Targeting Zero Harm

    TARGETING ZERO HARM LOST TIME INJURY FREQUENCY ALL INJURY FREQUENCY RATE MALARIA INCIDENCE RATE RATE (LTIFR) (AIFR) 119.80 3.66 106.50 0.26 3.47 0.20 FY-2020 FY-2021 FY-2020 FY-2021 FY-2020 FY-2021 LTIFR is calculated as number of LTIs in the Period X AIFR is calculated as LTIs+MTIs+RWIs+FAIs in the

  145. Slide 145: Diversity & Inclusion

    DIVERSITY & INCLUSION FEMALE REPRESENTATION IN WOMEN AT ENDEAVOUR TOTAL WORKFORCE Management Skilled Technical/Supervisors Semi-Skilled 9% 8% 22% 33% 508 10% Women employees 35% FY-2020 FY-2021 INSIGHTS TARGETS ACTIONS › Female representation remained flat due › Continue to increase female › EDV Fem

  146. Slide 146: Ethical Business

    ETHICAL BUSINESS HUMAN RIGHTS ANTI-BRIBERY/CORRUPTION RESPONSIBLE SOURCING › Our Human Rights Policy is reviewed › Independent 3rd party 24/7 whistleblower › All gold produced by Endeavour sourced annually, and we publish an annual Modern hotline from our own operations Slavery statement › DD is con

  147. Slide 147: Governance Framework & ESG Executive Comp

    GOVERNANCE FRAMEWORK & ESG EXECUTIVE COMP THE BOARD ESG Committee Audit Committee Quarterly Executive Management Committee Executive ESG SteerCo Quarterly Sector Specialists Health, safety Human Social Finance Legal & Supply Investor IT & environment resources performance compliance chain relations

  148. Slide 148: Aligning ESG Priorities Through Exec Comp.

    ALIGNING ESG PRIORITIES THROUGH EXEC COMP. FY-2022 FY-2021 FY-2020 Target Weighting Target Weighting Target Weighting 5% reduction in TRIFR 15% 10% reduction in TRIFR 10% 10% reduction in TRIFR 10% SHORT-TERM INCENTIVE 75% host country sourcing 10% 25% increase in female 10% reduction in malaria A r

  149. Slide 149: Strong Corporate Governance

    STRONG CORPORATE GOVERNANCE Aiming for close alignment with UK Corporate Governance Code Size of Board = 9 Nationalities represented on the Board Board experience by sector Strategy & Leadership Accounting 8 5 1 Metals & Mining Finance Public Policy International Business Operations & Exploration Co

  150. Slide 150: Key ESG 2022 Targets

    KEY ESG 2022 TARGETS ZERO HARM ADDRESSING CLIMATE CHANGE INVESTING IN OUR COMMUNITIES Zero Fatalities Finalise decarbonisation strategy Define a Local Content Policy roadmap ≥5% reduction in TRIFR Develop Local Procurement Plan per site Set a Group water target in 2022 Target 10% reduction in malari

  151. Slide 151: West Africa Insights

    Watch video WEST AFRICA INSIGHTS 5 151

  152. Slide 152: West Africa: Golden Opportunity

    WEST AFRICA ENDEAVOUR'S PRESENCE No. 1 GOLDEN OPPORTUNITY No. 1 Gold producer in the region and in each of the countries in which we operate IN WEST AFRICA for global gold discoveries over past decade Endeavour is strategically positioned with an unmatched competitive advantage in the region. 20% En

  153. Slide 153: West African Production Growth

    REGION’S PRODUCTION GROWTH WEST AFRICAN PRODUCTION GROWTH Burkina Faso Mali Guinea % of Mine Supply Côte d’Ivoire Senegal Ghana and Other WEST AFRICA 16.5t 16.0t 15% IS THE FASTEST- 15.5t 15.0t 14.5t 14% GROWING GOLD 14.0t 13.5t 13% PRODUCING REGION 13.0t 12.5t 12% 12.0t 11% 11.5t 11.0t 10% West Afr

  154. Slide 154: Production for the Region

    PRODUCTION FOR THE REGION ANNUAL GOLD PRODUCTION BY REGION In millions of ounces, for 2021 WEST AFRICA 16Moz IS THE LARGEST GLOBAL GOLD PRODUCING REGION 12Moz 12Moz 11Moz Given the golden opportunity in West Africa, 6 out of the top 10 senior gold producers have a presence in 7Moz 7Moz the region. 5

  155. Slide 155: Endeavour Is the Dominant West African Gold Producer

    PRODUCTION WEST AFRICAN GOLD PRODUCTION (2021E) ENDEAVOUR Endeavour IS THE DOMINANT AngloGold WEST AFRICAN Newmont GOLD PRODUCER Gold Fields Barrick Given its focus on West Africa, B2Gold Endeavour has a strategic industrial Kinross benefit from being geographically focused yet diversified across mu

  156. Slide 156: Endeavour's Operating Model

    ENDEAVOUR’S OPERATING MODEL › Geographic focus provides a strong competitive advantage › Largest producer in each of our operating countries › Hands-on management model with teams close to operations › Senior management team spends significant time in-country › General managers empowered and rely on

  157. Slide 157: Industry Exploration Spend

    INDUSTRY EXPLORATION SPEND INDUSTRY 2020 EXPLORATION BUDGET In US$ millions 842 WEST AFRICA IS 788 THE 4TH LARGEST EXPLORATION FOCUS ACROSS THE GLOBE Given that exploration spend often 470 458 foreshadows future production growth, West Africa has the potential to continue to be a large producing reg

  158. Slide 158: Exploration Spend Discoveries by Area

    INDUSTRY EXPLORATION SPEND DISCOVERIES BY AREA For the period between 2010-2021 67Moz WEST AFRICA RANKS 1ST FOR DISCOVERIES OVER PAST DECADE The region is significantly under-explored compared to other regions. 28Moz 27Moz 23Moz 67 20Moz 19Moz 18Moz 18Moz 18Moz 17Moz 15Moz Moz 14Moz 13Moz 11Moz 8Moz

  159. Slide 159: One of the Largest Land Tenement Holdings in West Africa

    UNDER-EXPLORED REGION ENDEAVOUR HOLDS ONE OF THE LARGEST LAND TENEMENT HOLDINGS IN WEST AFRICA 60% of greenstone belt lies in Burkina Faso and Côte d’Ivoire but… …only represents Endeavour has a strategic foothold in ~30% of production two of West Africa’s most prospective belts since it is underexp

  160. Slide 160: Endeavour Controls the Full 125km Ity Birimian Belt

    ENDEAVOUR CONTROLS THE FULL 125KM STRETCH ALONG THE ITY BIRIMIAN BELT 160

  161. Slide 161: Largest Foothold on the Houndé Belt

    ENDEAVOUR HAS THE LARGEST FOOTHOLD ON THE HOUNDÉ BELT 161

  162. Slide 162: West Africa Operates as a Stable Sector

    WEST AFRICA OPERATES STABLE SECTOR AS AN ECONOMIC UNION MINING CODE SIZE West African Economic and Well balanced profit sharing: Extractive sector Monetary Union (WAEMU) › Corporate tax rate between 25- represents a low % 35% of GDP1: › Free-carried interests between › Senegal: 3% 10-15% › Cote d’Iv

  163. Slide 163: Enhanced Security Platform Due to Scale in the Region

    REGION’S PRODUCTION GROWTH ENHANCED SECURITY PLATFORM DUE TO SCALE IN THE REGION › Security unit structured as a business unit, led by ex-French military › Air strips on sites to avoid use of roads and improve operating efficiencies › Significant foreign aid and co- operation amongst West African na

  164. Slide 164: Unmatched Competitive Advantage

    UNMATCHED COMPETITIVE ADVANTAGE Dominant presence in the world’s largest producing region STRATEGIC SUPERIOR MANAGEMENT POSITIONING OPERATING MODEL TRACK RECORD Largest producer in each country In country and regional synergies Discovered 11.5Moz of Indicated resources where we operate at <$25/oz ov

  165. Slide 165: Appendix

    APPENDIX FT / 2) Es y

  166. Slide 166: Appendix 1: Management and Board

    01 APPENDIX 1 Management and Board

  167. Slide 167: Executive Management Team

    EXECUTIVE MANAGEMENT TEAM Sébastien de Montessus Mark Morcombe Joanna Pearson David Dragone Djaria Traore President & CEO COO CFO EVP HR & Comms EVP ESG & Supply Chain • Joined in 2019 • Joined in 2020 • Joined in 2023 • Joined Endeavour in 2019 • Joined in 2016 • 20+ years in HR with expertise in •

  168. Slide 168: Board Members

    BOARD MEMBERS Srinivasan Venkatakrishnan Ian Cockerill (SID) Alison Baker Livia Mahler Sébastien de Montessus Chair and Independent Senior Independent Independent Independent Executive Non-Executive Director Non-Executive Director Non-Executive Director Non-Executive Director Tertius Zongo Sakhila M

  169. Slide 169: Appendix 2: Mine Statistics and Financials

    02 APPENDIX 2 Mine statistics and financials

  170. Slide 170: Production and AISC

    PRODUCTION AND AISC Production THREE MONTHS ENDED TWELVE MONTHS ENDED 31 December 30 September 31 December 31 December 31 December 2022 FULL-YEAR GUIDANCE All amounts in koz, on a 100% basis 2022 2022 2021 2022 2021 Boungou 26 29 35 116 174 130 — 140 Hounde 63 72 77 295 293 260 — 275 Ity 82 81 60 31

  171. Slide 171: Mine Statistics

    MINE STATISTICS On a quarterly basis (1) Includes waste capitalized. 171

  172. Slide 172: Mine Statistics

    MINE STATISTICS On a year to date basis (1) Includes waste capitalized. Note: Sabodala-Massawa and Wahgnion are represented for the post acquisition period commencing February 10,2021 172

  173. Slide 173: Production and Preliminary AISC Statistics

    PRODUCTION AND PRELIMINARY AISC STATISTICS On a quarterly basis (1) Includes waste capitalized. 173

  174. Slide 174: Production and Preliminary AISC Statistics

    PRODUCTION AND PRELIMINARY AISC STATISTICS On a full year basis (1) Includes waste capitalized. Note: Sabodala-Massawa and Wahgnion are represented for the post acquisition period commencing February 10,2021 174

  175. Slide 175: Cash Flow and Net Cash

    CASH FLOW AND NET CASH THREE MONTHS ENDED NINE MONTHS ENDED 30 June 30 September 30 September 30 September 2022 2021 30 September 2021 All amounts in US$ million unless otherwise specified 2022 2022 Net cash from/(used in), as per cash flow statement: Operating cash flows before changes in working c

  176. Slide 176: Earnings from Continuing Operations

    EARNINGS FROM CONTINUING OPERATIONS THREE MONTHS ENDED NINE MONTHS ENDED 30 September 30 June 30 September 30 September 30 September All amounts in US$ million unless otherwise specified 2022 2022 2021 2022 2021 Revenue 568 630 657 1,883 1,968 Operating expenses (254) (251) (234) (722) (744) Depreci

  177. Slide 177: Return on Capital Employed

    RETURN ON CAPITAL EMPLOYED Expected to improve acquired asset ROCE through optimisation Return on Capital Employed High ROCE for legacy assets following Expected to increase ROCE on acquired by asset build and exploration success assets with exploration and optimisation ITY MANA BOUNGOU Mana Houndé

  178. Slide 178: Emissions and Energy

    EMISSIONS AND ENERGY On a full year basis FY-2021 FY-2020 Variance (%) FY-2021 FY-2020 Variance (%) Aggregate Emissions1 (Scope1+2), kt Aggregate Energy1 Consumption, GJ Houndé 162.8 126.3 + 29% Houndé 2,026,860 1,615,355 + 25% Ity 117.6 115.5 + 2% Ity 1,881,153 1,446,685 + 30% Mana 132.9 108.4 + 23

  179. Slide 179: Water Stewardship

    WATER STEWARDSHIP On a full year basis FY-2021 FY-2020 Variance (%) Aggregate water withdrawal1, ML Houndé 2,785 2,215 + 26% Ity 1,862 1,785 + 4% Mana 778 2,397 - 67% Boungou 1,148 454 + 153% Karma 546 525 + 4% Sabodala-Massawa 1,668 na na Wahgnion 1,253 na na Group Total 10,042 7,376 + 36% Water wi

  180. Slide 180: Appendix 3: Reserves and Resources, 5-Year Exploration Target

    03 APPENDIX 3 Reserves and Resources, 5-year exploration target and security

  181. Slide 181: Reserves and Resources

    RESERVES AND RESOURCES As of 31 December 2021 On a 100% basis On a 100% basis On a 100% basis Resources shown Tonnage Grade Content Resources shown Tonnage Grade Content Resources shown Tonnage Grade Content inclusive of Reserves (Mt) (Au g/t) (Au koz) inclusive of Reserves (Mt) (Au g/t) (Au koz) in

  182. Slide 182: Exploration Methodology and Strategy

    EXPLORATON METHODOLOGY AND STRATEGY Selection, ranking and risk evaluation of exploration targets Endeavour’s large land position (more than 17,000 sq Km) and comprehensive database over a very large number of exploration targets promotes the application of a general portfolio management theory wher

  183. Slide 183: Exploration Methodology and Strategy

    EXPLORATON METHODOLOGY AND STRATEGY Selection, ranking and risk evaluation of exploration targets Step 4: Final selection of targets, with higher PoO and priority, which can be physically be included in the 5 year exploration plan Since Endeavour cannot feasibly explore the 110 targets, defined in S

  184. Slide 184: Contact Us

    ®) ENDEAVOUR MINING | CONTACT US T: +44 203 011 2719 investor@endeavourmining.com Follow us: endeavourmining.com CORPORATE OFFICE 5 Young Street London W8 5EH United Kingdom T: +44 203 011 2723 OPERATIONS OFFICE Hotel Palm Club Croisement Boulevard Latrille et rue du Lycée Technique Abidjan 08 BP 87

Endeavour Mining — Investor Presentation (February 2023) on 6ix