Patagonia Gold Corp · TSXV:PGDC
Patagonia Gold — Shareholder Meeting (June 2010)
27 slides from Patagonia Gold's shareholder meeting presentation, June 2010
Slide 1: Patagonia Gold Plc
Patagonia g Gold Plc 2010 Cap-Oeste updated June 2010
Slide 2: Patagonia Gold - AGM Voting 2010
Patagonia g Gold ‐ AGM VOTING 2010 ORDINARY SPECIAL Resolution 1 Resolution 2 Resolution 3 Resolution 4 Resolution 5 Resolution 6 Resolution 7 Approval of Reappointment of Reappointment of Reappointment of Allotment of Allotment of Securities Adoption of New Accounts Carlos Miguens g Gonzalo Tanoira
Slide 3: Patagonia Gold Plc
Patagonia g Gold Plc 2010 Cap-Oeste updated June 2010
Slide 4: Patagonia Gold Plc Company Overview
PATAGONIA GOLD PLC COMPANY OVERVIEW A precious metals exploration company operating in the Argentine southern Patagonia provinces Februaryy 2007, acquired q highly g y pprospective p Santa Cruz exploration p portfolio p from Barrick Gold All expenditure requirements met 2 years ahead of obligation T
Slide 5: Area of Operation
AREA OF OPERATION Patagonia Gold through its 100% subsidiary Patagonia Gold S.A. (PGSA) operates p in four of the Argentine g Provinces in Patagonia Total T t l area held h ld under d license li 7,364* 7 364* km² k ² No. of properties ~200 In 2009 PGSA formed a strategic partnership with Fomicruz i
Slide 6: PGSA in Santa Cruz
PGSA in SANTA CRUZ 4850000 mN 4650000 mN 4700000 mN 4750000 mN 4800000 mN 4600000 mN 2300000 mE 2350000 mE 2400000 mE 2450000 mE 2500000 mE 2550000 mE 2600000 mE 2650000 mE a w+ 4 + Fs = + + + | 4 ¢ PERITO MORENO 1C) \ N 3 - 3 Las Hi J 3 ‘ o @ Nuevos venoes ries =a * a | 3 _ LAPALOMA = e eng ‘4 PROP
Slide 7: La Paloma Property - Lomada de Leiva Project
La PALOMA PROPERTY LOMADA DE LEIVA PROJECT
Slide 8: Lomada de Leiva Project
LOMADA de LEIVA PROJECT Long section gold g/t x metres
Slide 9: Lomada de Leiva Project
LOMADA de LEIVA PROJECT COMPLETED •NI NI 43 43-101 101 Resource R estimate ti t att 0.30 0 30 grams per tonne t off gold ld cutt off ff Measured and Indicated 161,347 oz gold Inferred 73,726 , oz ggold Total 235,073 oz gold •Positive Scoping Study for an open pit/heap leach operation Production 21,0
Slide 10: Lomada de Leiva Project - Trial Heap Leach Operation
LOMADA de LEIVA PROJECT TRIAL HEAP LEACH OPERATION Leach Pad Layout Plant Facility Layout
Slide 11: El Tranquilo Property Block
EL TRANQUILO Q PROPERTY BLOCK
Slide 12: Cap Oeste Project
CAP OESTE PROJECT COMPLETED •NI 43-101 Resource estimate Oct 2009 at 0.30 grams per tonne of gold cut off Indicated 362,040 362 040 oz gold 14,503,120 14 503 120 oz silver Inferred 46,090 oz gold 1,604,030 oz silver Total gold equivalent (1 oz gold: 65 oz silver) 655,930 oz gold Eq IN PROGRESS •Scop
Slide 13: Cap Oeste Project
CAP OESTE PROJECT Long-section showing Au x metre
Slide 14: Cap Oeste Project
CAP OESTE PROJECT Significant results Drill hole section 10,100N Hole No. From Interval Grade Grade metres metres Au g/t Ag g/t CO 016 D CO-016-D 91.95 13.45 11.93 389 CO-036-D 47.1 12.3 14.03 56 CO-054-D 132 7 47.16 769 CO-080-D 161 27 7.88 122 CO-099-D 80.1 10.4 12.02 178 CO-105-D CO 105 D 186 95
Slide 15: Cap Oeste South East Prospect (COSE)
CAP OESTE SOUTH EAST PROSPECT (COSE)
Slide 16: Cap Oeste South East Prospect (COSE)
CAP OESTE SOUTH EAST PROSPECT (COSE) . A high grade gold and silver shoot less than 2 kilometres SE along strike from Cap Oeste Deposit COMPLETED •43 Drill holes for 10,270m IN PROGRESS •3D 3D modelling of ore shoot •NI 43-101 Resource estimate initiated PLANNED •2010/11 2010/11 •SAM (Sub Audio Magn
Slide 17: Cap Oeste South East Prospect (COSE)
CAP OESTE SOUTH EAST PROSPECT (COSE) Section 8595 N Significant Intersections Drill hole No. From Interval Grade Grade metres metres Au g/t Ag g/t CSE 013 D CSE-013-D 208 3 208.3 41 4.1 540 05 540.05 28 089 28,089 including 208.3 0.9 166 5,464 including 209.2 0.8 402 23,341 including 210 0.85 2,030.
Slide 18: Cap Oeste Project - Strike Extension Exploration
CAP OESTE PROJECT STRIKE EXTENSION EXPLORATION La Pampa Zone of intersection of the Bonanza fault structure and Don Pancho corridor Drill hole CX CX- 038 2.25 metres @ 5.71 g/t gold Cap Oeste Extension Pattern drilling along 1,500 metres of strike from Cap Oeste resource area to COSE prospect Hole C
Slide 19: El Tranquilo Property Exploration
El TRANQUILO PROPERTY EXPLORATION
Slide 20: El Tranquilo Property Exploration
El TRANQUILO PROPERTY EXPLORATION COMPLETED Reconnaissance exploration, mapping trenching and drilling of 6 prospects with 29 holes for 2,817m including: Don Pancho DP-03 DP 03 from 20m 20m-5m 5m @8 @8.13g/t 13g/t Au 138g/t Ag Vetas Norte – Laguna VN-001 from 35m-6m @ 0.84 g/t Au Felix FLX 01 R from
Slide 21: La Manchuria
La MANCHURIA
Slide 22: La Manchuria
La MANCHURIA High grade gold and silver prospect 50 kilometres SE of and within carting distance of the Cap Oeste Deposit COMPLETED •95 Drill holes for 17,853 metres IN PROGRESS •NI 43-101 Resource estimate for Q3 2010 PLANNED •2011/12 Scoping/feasibility studies •2013/14 Permitting construction and
Slide 23: La Manchuria Drill hole location plan
La MANCHURIA Drill hole location plan Significant results Drill hole No. From Interval Grade Grade metres t metres t A g/t Au /t A g/t Ag /t LM-015-D 60.70 1.00 20.10 23 and 95.25 1.20 58.90 4,150 LM-020-D 119.50 2.85 22.35 401 LM-022-DR 184.65 2.35 28.82 344 LM-023-DR 121.00 4.00 13.31 145 LM 030 D
Slide 24: Reconnaissance in Santa Cruz
Reconnaissance in SANTA CRUZ
Slide 25: Reconnaissance in Santa Cruz
Reconnaissance in SANTA CRUZ
Slide 26: Exploration in Santa Cruz
Exploration in Santa Cruz Sarita prospect El Bagual prospect Lineaments from the Mina Martha trend can be Historic rock chip samples up to 2.36 g/t traced on satellite imagery into the Sarita gold. property property. PGSA sampling found multigram gold values with best sample returned up to Within th
Slide 27: Key Milestones for 2010/2011
KEY MILESTONES FOR 2010/2011 Lomada de Leiva •Complete permitting, open pit/trial heap leach operation (50,000 t) •Complete p ppermittingg and studies for the main open p ppit/trial heap p leach operation p Cap Oeste •Complete scoping study •Continue expanding resource through drilling COSE •Complet