Southern Hemisphere Mining Limited · ASX:SUH

Southern Hemisphere Mining — Investor Presentation (August 2011)

25 slides from Southern Hemisphere Mining's investor presentation, August 2011

  1. Slide 1: Southern Hemisphere Mining Limited

    Slide 1: Southern Hemisphere Mining Limited

    Southern Hemisphere Mining Limited August 2011 Trevor Tennant – Managing Director Contact: +61 (0) 414 895 605 or +56 (9) 7766 4688

  2. Slide 2: Overview

    Slide 2: Overview

    Overview Los Pumas  Following a review of Company’s projects priority has been Chitigua given to: 1. Newly acquired Llahuin project 2. Chitigua project El Arrayan  Positive drill results from Llahuin project confirm potential for Llahuin significant porphyry deposit.  The recently completed IP su

  3. Slide 3: Company Snapshot

    Slide 3: Company Snapshot

    Company Snapshot Capitalisation Summary Ordinary Shares (1) 152,525,822 Headquartered in Australia and operating Market Capitalisation @ $0.40 (2) AU $61M in Chile Cash (3) AU$15M Debt (3) $0.0 Dual listed on the ASX (SUH) and the TSXV Enterprise Value (Fully Diluted) AU$46M (SH) (1) Excludes 21m

  4. Slide 4: SUH Project Locations

    Slide 4: SUH Project Locations

    SUH Project Locations Los Pumas Manganese Project Copper/Gold Project Iron Sands Project 4

  5. Slide 5: Llahuin Copper Porphyry

    Slide 5: Llahuin Copper Porphyry

    Llahuin Copper Porphyry July 2011, company signed Option Agreement to purchase the Llahuin Amapola mining licenses. The Llahuin exploration project is highly prospective for copper and is situated 250 kms north of Santiago and 40km north of the city of Illapel, that has a population of 40,000. Th

  6. Slide 6: Cluster Llahuin

    Slide 6: Cluster Llahuin

    Cluster Llahuin The Llahuin Cluster, consisting of 2 mineralizations, Copper and Gold: LLAHUIN PORPHYRY 1.- Porfido Llahuín: (Porhyry Copper Rich Composed of a clear Porphyry in Gold) copper, rich in gold. 2.- Llanos de Llahuín: LLANOS DE LLAHUIN Composed of structural (Stockwork Cu.Au) geological m

  7. Slide 7: Llahuin Copper Porphyry

    Slide 7: Llahuin Copper Porphyry

    Llahuin Copper Porphyry Llahuin Valley showing the porphyry occurrence to the right. The Valley runs north/south. The Llahuin Amapola group of exploitation licences, cover 772 hectares, and include the valley pictured above. 7

  8. Slide 8: Llahuin Copper Porphyry

    Slide 8: Llahuin Copper Porphyry

    Llahuin Copper Porphyry  Llahuin drill hole locations within the Amapola licenses The Llahuin Porphyry is one expression of a system that incorporates other targets Gold Zone These will be better defined by an IP survey and ground magnetics in third quarter 2011. Llahuin Porphyry Cerro Zone 8

  9. Slide 9: Llahuin Copper Porphyry

    Slide 9: Llahuin Copper Porphyry

    Llahuin Copper Porphyry Drill Collar Locations at the Llahuin Porphyry as at 16th August 2011. To date we have received 1959 analysis results averaging 0.32%Cu. Removing the lower grade results (less than 0.2%Cu), largely from the granodioritic porphyry, gives us 1429 analysis results averaging 0

  10. Slide 10: Llahuin Copper Porphyry

    Slide 10: Llahuin Copper Porphyry

    Llahuin Copper Porphyry Results from nine holes in the Llahuin Porphry. Hole LLA -010 is being deepened with a DDH hole that is currently at 400m. 10

  11. Slide 11: Llahuin Copper Porphyry

    Slide 11: Llahuin Copper Porphyry

    Llahuin Copper Porphyry The mineralisation is open at depth and open laterally. Anomalous gold grades indicate that we are in a typical copper/ gold porphyry similar to the Andacollo porphry that is currently in production. 11

  12. Slide 12: Los Llanos de Llahuin

    Slide 12: Los Llanos de Llahuin

    Los Llanos de Llahuin The prospect Llahuin Plains, was exploited since early 1800, but industrially in 1975 to 1980, Cerro Centinela mining company, a subsidiary of Antofagasta Minerals S A. (AMSA). The project is covered Strong quartz stockwork with copper oxides by mining properties over 100 years

  13. Slide 13: Chitigua Copper Porphyry

    Slide 13: Chitigua Copper Porphyry

    Chitigua Copper Porphyry The Chitigua project is located 100km north of Calama, which is the regional centre and has a population of 150,000. The project is at an elevation of 4,000 metres and is on the western fault between the El Abra and Quebrada Blanca mines. Porphyry deposits in this metallo

  14. Slide 14: Chitigua Copper Porphyry

    Slide 14: Chitigua Copper Porphyry

    Chitigua Copper Porphyry Large Tenement Holding of 190 Sq km Three target areas: Church Zone, Breccia Zone And North Zone. IP Survey completed over Breccia Zone. IP Survey underway over Church Zone 14

  15. Slide 15: Chitigua Project - Breccia Zone

    Slide 15: Chitigua Project - Breccia Zone

    te) RC-CH-05 Chitigua Project - Breccia Zone SOUTHERN HEMISPHERE mining limited 15

  16. Slide 16: Chitigua Breccia Zone (IP survey)

    Slide 16: Chitigua Breccia Zone (IP survey)

    Chitigua Breccia Zone (IP survey at the surface minus 200m level.) 16

  17. Slide 17: Chitigua Copper Porphyry

    Slide 17: Chitigua Copper Porphyry

    Chitigua Copper Porphyry Characteristics Required Chitigua Large Licence Holding 190 Sq km West Fault Belt West Fault through centre of licence area Tier 1 Deposits Chuquicamata, Escondida, El Abra, Collahuasi, Quebrada Blanca, RT, MM, Mina Sur, El Salvador, Zaldiva and others Tensional Faults each

  18. Slide 18: Update on El Arrayan Project

    Slide 18: Update on El Arrayan Project

    Update on El Arrayan Project El Arrayan is situated 35 km from the coastal city of La Serena. La Serena together with Coquimbo has a population of 400,000. El Arrayan is in the coastal cordillera with an elevation of 700m. 18

  19. Slide 19: Update on El Arrayan Project

    Slide 19: Update on El Arrayan Project

    Update on El Arrayan Project A drill program of 2,294 meters in 10 RC drill holes was completed and announced in February 2011 . The holes collared on the higher elevations were in volcanic andesites and returned better grades than the holes collared in the valley that were in the intrusive dacite

  20. Slide 20: Update on El Arrayan Project

    Slide 20: Update on El Arrayan Project

    Update on El Arrayan Project Following encouraging initial drill results at El Arrayan ,the Company is in negotiation to acquire the concession group to the south of El Arrayan. When acquired, another drill program will be undertaken to add to the copper oxide resource. Although prospective, El A

  21. Slide 21: Update on Los Pumas Manganese Project

    Slide 21: Update on Los Pumas Manganese Project

    Update on Los Pumas Manganese Project Los Pumas Project is located 174 road km from the Port of Arica in the far north of Chile. The Port of Arica is equipped with a bulk commodity loading System. The project is at an elevation of 3,700 metres. 21

  22. Slide 22: Update on Los Pumas Manganese Project

    Slide 22: Update on Los Pumas Manganese Project

    Update on Los Pumas Manganese Project  Completed JORC compliant resource estimate by Coffey Mining at the Los Pumas Manganese project in northern Chile.  Environmental approval filing has been delayed and we now expect approval to be granted in first quarter of next year.  Feasibility study compl

  23. Slide 23: Strategy for period ending December 2011

    Slide 23: Strategy for period ending December 2011

    Strategy for period ending December 2011 Llahuin Project The Llahuin porphyry is in resource drilling mode and we are planning a total of another 40 RC holes that will complete a 50m by 50m grid. An IP survey will highlight other porphyry targets in the valley that will be investigated. The Compa

  24. Slide 24: Strategy for period ending December 2011

    Slide 24: Strategy for period ending December 2011

    Strategy for period ending December 2011 Chitigua Project Analysis from DDH-CH-02 core, show encouraging results. IP surveys, that are being conducted in the Breccia and Church Zones, will assist in the targeting of drill hole locations. An RC drill rig has been mobilised to site and drill produc

  25. Slide 25: Strategy for period ending December 2011

    Slide 25: Strategy for period ending December 2011

    Strategy for period ending December 2011 Current cash position is A$15m The Company will be focussing on the Llahuin and Chitigua projects A stretch target for drilling through to the end of the calendar year is 19,000 metres Drilling Llahuin (m) Chitigua (m) RC 10,000 7,000 DDH 1,350 850 Total 1

Source: Internet Archive copy of shmining.com.au

More decks from Southern Hemisphere Mining Limited

All 40 Southern Hemisphere Mining decks