  1. Slide 1: Clean • Safe • Secure • Affordable

    Exhibit 99.1 Clean • Safe • Secure • Affordable © 2023 X-Energy Reactor Company, LLC, all rights reserved 1 1 © 2023 X-Energy Reactor Company, LLC, all rights reserved

  2. Slide 2: Disclaimer

    Disclaimer This presentation (the “presentation”) is being delivered to you by X-Energy Reactor Company, LLC (“X-energy”) and Ares Acquisition Corporation (“AAC”) to assist interested parties in making their own evaluation with respect to a potential business combination of X-energy and AAC and rela

  3. Slide 3: Ares is a Compelling SPAC Partner for X-energy

    Ares is a Compelling SPAC Partner for X-energy (1) Leading Partnership with Ares Acquisition Corporation Ares’ Sponsorship and Deep Infrastructure Investing Experience ~1,900 ~3,000 Portfolio >10 IPOs Institutional Companies Ares has successfully brought Relationships Deep executive network and over

  4. Slide 4: X-energy & Ares – A Differentiated Partnership

    X-energy & Ares – A Differentiated Partnership Compelling Tailwinds in Clean Energy Advanced nuclear is a key component of the clean energy transition and energy security investment themes given its ability to decarbonize power and industrial end markets and provide reliable and continuous operation

  5. Slide 5: Introduction & Company Overview

    Introduction & Company Overview © 2023 X-Energy Reactor Company, LLC, all rights reserved 5

  6. Slide 6: Nuclear is the only energy source for reliability and decarbonization

    Two Challenges in Nuclear is the only energy source for reliability and decarbonization Opposition “Always-on” baseload energy Global Energy Need to drastically Demand Up Reduce Carbon (1) 50% by 2050 Emissions Generates zero carbon emissions Can be flexibly located near Fossil fuels currently load

  7. Slide 7: Energy for the Future

    Energy for the Future “ I founded X-energy because the world needs energy solutions that are clean, safe, secure, and affordable. With so much at stake, we cannot continue down the same path.” – Kam Ghaffarian, Founder Steam Turbines Nuclear Islands Expected EPZ Digital rendering of a Xe-100 4-pack

  8. Slide 8: X-energy at a Glance

    X-energy at a Glance X-energy’s Advanced Nuclear Technology Founded in Rockville, MD 2009 Headquarters Our High Performing Reactor: Xe-100 Gen-IV High-Temperature Gas-cooled Reactors (HTGR) have Rooted in the nuclear 14 years of investment advantages in sustainability, economics, reliability, safety

  9. Slide 9: Our Traction, Accomplishments & Risk Reduction to Date

    Our Traction, Accomplishments & Risk Reduction to Date 2009 - 2014 2015 - 2018 2019 - 2021 2022 - 2023 Initial Concept Technical Development Focus Preparation for Commercialization Customer Wins & Commercialization Acceleration Founded X-energy hired fuel team and Clay Sell appointed CEO Signed fram

  10. Slide 10: Leadership Team: Deep Nuclear Roots, Technical & Business Pedigrees

    Leadership Team: Deep Nuclear Roots, Technical & Business Pedigrees Average 25+ Years of Nuclear / Energy Experience with Specialty in Design, Operations, Government Relations and Public Markets Key Leadership Team Steve Miller Dr. Kam Ghaffarian J. Clay Sell Harlan Bowers Senior Vice President & Ex

  11. Slide 11: Key Investment Highlights

    Key Investment Highlights Powerful Significant total addressable market (“TAM”) for advanced nuclear – a carbon-free, always-on generation Tailwinds in source capable of addressing the global need for clean energy Clean Energy Safe, Simplified and designed to be meltdown proof, the Xe-100 drives enh

  12. Slide 12: X-energy is Building Advanced Nuclear Technology

    X-energy is Building Advanced Nuclear Technology © 2023 X-Energy Reactor Company, LLC, all rights reserved 12

  13. Slide 13: X-energy Is Advancing Nuclear Energy

    X-energy Is Advancing Nuclear Energy Modular design and off-the-shelf Carbon-free, always-on generation components designed to drive source capable of addressing the scalability, accelerated timelines global need for clean energy and ability to manage construction Affordable Clean cost – revolutioni

  14. Slide 14: X-energy & Gen IV SMRs are Key to the Energy Transition

    X-energy & Gen IV SMRs are Key to the Energy Transition X-energy’s solution will outperform other energy sources on key criteria essential to decarbonization (1) SMRs Traditional Renewables Large-Scale Gen III+ / Gen IV Fossil Fuels (Solar & Wind) Nuclear Carbon-Free ûüüüü Power Reliable Baseload üû

  15. Slide 15: Xe-100 – A Pioneering Gen IV Nuclear Reactor

    Xe-100 – A Pioneering Gen IV Nuclear Reactor 80 MWe modular design & manufactured components designed to drive scalability, accelerated timeline and cost control Xe-100 Schematic • Each reactor module is connected to its own steam turbine Nuclear generator or process heat offtake, so modules can be

  16. Slide 16: Xe-100 is Attractive Compared to Conventional Nuclear

    Xe-100 is Attractive Compared to Conventional Nuclear The Xe-100’s lower capital costs, simplified operations and improved safety profile are a significant improvement over conventional nuclear (2) (1) Site-Bounded Emergency Planning Zone (“EPZ”) Xe-100 Conventional Nuclear 320 MWe 4-Pack ~1,150 MWe

  17. Slide 17: TRISO-X Fuel – Intrinsic Safety

    TRISO-X Fuel – Intrinsic Safety (1) The Department of Energy describes TRISO fuel as “the most robust nuclear fuel on Earth” It retains waste and fission products within the fuel during all foreseeable adverse conditions, even worst-case accidents, and it is designed not to melt • X-energy manufactu

  18. Slide 18: North America's First Commercial Advanced Nuclear Fuel Fabrication Facility

    North America’s First Commercial Advanced Nuclear Fuel Fabrication Facility Digital rendering of a TRISO Fuel Facility © 2023 X-Energy Reactor Company, LLC, all rights reserved 18

  19. Slide 19: Fuel Facility Construction Progress

    Fuel Facility Construction Progress Proven Fuel Demonstration Facility Construction of Fuel Facility X-energy TRISO-X Fuel Fabrication Pilot Facility at Oak Ridge National Laboratory Groundbreaking for X-energy’s TRISO-X facility in Oak Ridge, TN in October 2022 North America’s First Commercial Adva

  20. Slide 20: Versatility Creates Opportunity for New Nuclear Applications

    Versatility Creates Opportunity for New Nuclear Applications X-energy is targeting end-markets beyond just conventional power generation to satisfy diverse decarbonization needs Conventional High-Temperature Power Steam for Generation Industrial Use Replace & Canadian Oil Sands Re-Use Legacy Decarbo

  21. Slide 21: Versatility Creates Opportunity for New Nuclear Applications (Cont'd)

    Versatility Creates Opportunity for New Nuclear Applications (Cont’d) Xe-100 could enable bespoke solutions for the world’s most challenging decarbonization efforts Repurposes Coal Facilities Supports Industrial Applications Enables Clean Hydrogen Production DOE identified ~315 operating and retired

  22. Slide 22: Thermal Output Well Positioned to Satisfy Most Industrial Applications

    X-energy’s Thermal Output is Well Positioned to Satisfy Most Industrial Applications Steam Output Temperature 100 °C 200 °C 300 °C 400 °C 500 °C 600 °C 700 °C 800 °C 900 °C 1,000 °C HTSE and Thermo-Chemical Hydrogen Production 800-1,000°C Coal Gasification Hydrogen Steam Reforming 500-900°C Biomass

  23. Slide 23: Competitive Position Reinforced by $1.2 Billion ARDP Grant

    Competitive Position Reinforced by $1.2 Billion ARDP Grant X-energy’s selection for the DOE’s Advanced Reactor Demonstration Program represents a critical advantage over other competitors Construction of the Commercialization of ARDP to Fund: 1 Design of the Xe-100 2 3 first fuel facility the first

  24. Slide 24: Partnership with Industry-Leading, Blue-Chip Customer

    Partnership with Industry-Leading, Blue-Chip Customer On March 1, 2023, Dow and X-energy announced their entry into an agreement to build the Xe-100 under the ARDP Project Overview • Dow and X-energy have signed a joint development agreement (“JDA”) to deliver the first advanced nuclear reactor for

  25. Slide 25: Meaningful Customer Support

    Meaningful Customer Support Industry leaders in both power generation and industrial applications recognize the Xe-100’s ability to facilitate decarbonization Energy Northwest is a Washington state public power Grant County Public Utility District (“GCPUD”) is a OPG is the third largest utility in C

  26. Slide 26: Growing Customer Pipeline

    Growing Customer Pipeline X-energy’s current pipeline represents 30+ estimated opportunities across a variety of use cases and geographies Tier I – Advanced Partnerships In active negotiations with six parties, each with unique use cases Confidential Confidential European Utility U.S. Utility Signed

  27. Slide 27: Market Overview

    Market Overview © 2023 X-Energy Reactor Company, LLC, all rights reserved 27

  28. Slide 28: Global Macro Themes Drive Support for Nuclear

    Global Macro Themes Drive Support for Nuclear (1) Nuclear Can Support Decarbonization Beyond Electric Power Clean Nuclear Baseload Power Complements Intermittent Renewables (2) U.S. Renewables Projected Capacity Growth (GW) 1,500 Commercial & Agriculture Residential 11% 13% 1,000 500 - Total U.S. Gr

  29. Slide 29: Clean Energy Transition Drives Market Opportunity

    Clean Energy Transition Drives Market Opportunity X-energy is well positioned to address the potential ~$1 trillion market for SMRs in the United States, Canada and UK alone • Global Electricity Demand: Initial X-energy target markets – the U.S., (1) UK and Canada – comprise about a third of global

  30. Slide 30: Need for New Capacity Creates Significant Revenue Opportunity

    Need for New Capacity Creates Significant Revenue Opportunity Energy transition provides significant SAM opportunity, driven by the enhanced safety, energy security and reliability of SMRs Illustrative Estimate of X-energy’s Market Opportunity SMR SAM in Context of Energy Transition 2040E 2050E 67 G

  31. Slide 31: Policymakers Recognize the Importance of Nuclear

    Policymakers Recognize the Importance of Nuclear to Address the Global Need for Clean Power United States International I have long supported the It can’t be done with wind and Nuclear is the only form of reliable, low carbon electricity generation which commercialization of advanced solar alone. We

  32. Slide 32: Inflation Reduction Act Represents a Significant Increase in U.S. Government Support

    Inflation Reduction Act Represents a Significant Increase in U.S. Government Support for the Advanced Nuclear Industry New U.S. government support will meaningfully accelerate the deployment of advanced nuclear reactors U.S. Government Funding for Advanced Nuclear ($ in millions) Investment tax cred

  33. Slide 33: IRA Provides Significant Support for SMR Deployment

    IRA Provides Significant Support for SMR Deployment Up to $830mm in tax credits per 4-pack reactor fundamentally enhances SMR economics for customers (1) (2) Clean Electricity Production Tax Credit (§ 45Y) Clean Electricity Investment Tax Credit (§ 48E) Up to ~$83 million potential tax credits to cu

  34. Slide 34: Support for Nuclear Continues to Gain Momentum

    Support for Nuclear Continues to Gain Momentum Majority of states either already have nuclear facilities or are supportive of adopting SMR development Montana – Passed Washington – Enacted Indiana – Passed state legislation to ease state Nebraska – State bill West Virginia – Governor Justice Clean E

  35. Slide 35: Progress on U.S. Regulatory Process

    Progress on U.S. Regulatory Process Key NRC Milestones We are a frontrunner in the deployment of advanced reactors; current scope of work under the Dow joint development Q2 2022: X-energy submitted first ever Category II Fuel Fabrication facility license agreement includes the preparation and submis

  36. Slide 36: Financial Summary

    Financial Summary © 2023 X-Energy Reactor Company, LLC, all rights reserved 36

  37. Slide 37: Capex light, Services-Driven Business Model

    Capex light, Services-Driven Business Model Drives Attractive Financial Metrics Project Services Description • Licensing fees for use of proprietary Xe-100 technology Licensing Fee • X-energy to coordinate assembly & construction support Reactors Assembly & rd with customers and 3 party vendors Cons

  38. Slide 38: Illustrative Unit Economics: Xe-100 4-Pack (320MWe)

    Illustrative Unit Economics: Xe-100 4-Pack (320MWe) Cash Revenue Timing Estimated Category Gross (1) Margin FOAK NOAK T-6 T-5 T-4 T-3 T-2 T-1 COD T+1Æ LT Xe-100 Licensing Fees 100% $75mm $250mm 20% 20% 60% (2) Assembly & Construction 0-10% $700-750mm $550-600mm 25% 25% 25% 25% Fuel Initial Load 5-10

  39. Slide 39: Illustrative Unit Economics: Xe-100 4-Pack (320MWe) (Cont'd)

    Illustrative Unit Economics: Xe-100 4-Pack (320MWe) (Cont’d) ILLUSTRATIVE 4-PACK REACTOR (320MWe) ECONOMICS 60-Year Life ($USD in millions) T-6 T-5 T-4 T-3 T-2 T-1 COD T+1 LT of Plant Licensing Fee - $50 $50 - - - - $150 - $250 Assembly and Construction - - 144 144 144 144 - - - 575 Fuel - - - - - -

  40. Slide 40: Delivery Schedule & Other Key Assumptions

    Delivery Schedule & Other Key Assumptions (1) COD Schedule Range Other Key Assumptions 20 • Cash from ARDP cost share program is treated as revenue, with the Company expecting to recognize ~$2bn of revenue (80-85% of direct costs) from 2023 through 2027, split ~$1.2bn of government funding and the (

  41. Slide 41: Transaction Overview

    Transaction Overview © 2023 X-Energy Reactor Company, LLC, all rights reserved 41

  42. Slide 42: Transaction Overview

    Transaction Overview Illustrative Pro-forma Valuation Summary (1) § Pre-money equity value of $2.0+ billion in the SPAC merger Transaction Share Price $10.00 (3) § $103 million secured from investors in private round of financing (“Series 266 Pro-forma Shares Outstanding C-2 Financing”), including $

  43. Slide 43: Selected Publicly Traded Companies

    Selected Publicly Traded Companies Small Modular Reactors Nuclear Services / Equipment Energy Transition Note: Selected Publicly Traded Companies information provided for illustrative purposes only. The Selected Publicly Traded Companies included in this presentation operate in different segments an

  44. Slide 44: Selected Publicly Traded Companies – Operational Statistics

    Selected Publicly Traded Companies – Operational Statistics SMR Nuclear Services / Equipment Energy Transition ’24E-’26E ’22E-’24E Median: 7% ’22E-’24E Median: 33% 129% 52% 37% 33% 26% 11% 7% 6% 7% SMR Nuclear Services / Equipment Energy Transition 2026E 2024E Median: 20% 2024E Median: 20% 36% 32% 2

  45. Slide 45: Selected Publicly Traded Companies – TEV / Revenue

    Selected Publicly Traded Companies SMR Nuclear Services / Equipment Energy Transition 2025E 2023E Median: 3.0x 2023E Median: 6.2x 10.4x 9.5x 6.2x 4.6x 5.5x 3.6x 3.4x 3.0x 2.1x SMR Nuclear Services / Equipment Energy Transition 2026E 2024E Median: 2.8x 2024E Median: 5.6x 8.2x 7.4x 5.6x 3.8x 3.6x 3.4x

  46. Slide 46: Selected Publicly Traded Companies (Cont'd) – TEV / EBITDA

    Selected Publicly Traded Companies (Cont’d) SMR Nuclear Services / Equipment Energy Transition 2025E 2023E Median: 14.9x 2023E Median: 31.4x 33.0x 31.4x 23.8x 15.5x 14.9x 13.4x N.M N.M. N.M. SMR Nuclear Services / Equipment Energy Transition 2026E 2024E Median: 13.8x 2024E Median: 22.9x 27.2x 23.0x

  47. Slide 47: Appendix

    Appendix © 2023 X-Energy Reactor Company, LLC, all rights reserved 47

  48. Slide 48: Glossary

    Glossary Term/Abbreviation Meaning Baseload Power The minimum amount of electric power delivered or required over a given period of time at a steady rate. Baseload Power Source Base load power sources are the plants that operate continuously to meet the minimum level of power demand 24/7. Brownfield

  49. Slide 49: Risk Factors

    Risk Factors 1) Our business requires substantial investment. At the time of proposed business combination announcement, the aggregate capital raised from the Series C-2 Financing and PIPE Financing will be sufficient to satisfy the minimum cash condition for the transaction; however, the commitment

  50. Slide 50: Endnotes

    Endnotes Infrastructure Investing Accolades Note: There may be other award categories for which Ares, its funds or its portfolio companies were considered but did not receive awards. The awards noted herein relate only to selected funds/strategies and may not be representative of any given client’s