Cue Energy Resources Limited · ASX:CUE

Cue Energy Resources — Investor Presentation (May 2007)

30 slides from Cue Energy Resources's investor presentation, May 24, 2007

  1. Slide 1: Cue Energy Resources Limited - May Presentation

    Cue Energy Resources Limited A.B.N. 45 066 385 971 Level 21 114 William Street Melbourne Victoria 3000 Australia Telephone: {03} 9670 8668 Facsimile: (03) 9670 8661 Email: mail@cuenrg.com.au Website: www.cuenrg.com.au TO : Company Announcements Office 10th Floor 20 Bond Street Sydney NSW 2000 DATE :

  2. Slide 2: Slide 2

  3. Slide 3: Slide 3

  4. Slide 4: Slide 4

  5. Slide 5: Slide 5

  6. Slide 6: Slide 6

  7. Slide 7: Slide 7

  8. Slide 8: Gobe, Oyong, Maari timeline

    “OSE Gobe*mOyong"0 Maari#--: 2007-2008 » 2009. 2010-2011 2012 2013-2014

  9. Slide 9: Slide 9

  10. Slide 10: Slide 10

  11. Slide 11: Slide 11

  12. Slide 12: Sampang PSC

    Sampang PSC BY ar Cue 15% | ACIRL7 Gascorp 50% | TI37P, TI38P * Cue Exoil 50% 50% 40.149650% Oil Search 36.35974% ‘Santos 15.929718% Cue 5.568892%| {SE Gobe Unit —3.285651%} PRG 2.8% | PRLO 4 * Santos 42.553% N PRL 8 PPL 190 “Oil Search 62.556% Murray 26.48T% Cue 10.947% OilSearch 42.553% cue 14.894

  13. Slide 13: Slide 13

  14. Slide 14: tial

    sl S - “ tial Poten! i i lopment well He Devel Cue share 4.6 mmbbis 5 20 KILOMETRES

  15. Slide 15: Slide 15

  16. Slide 16: Slide 16

  17. Slide 17: Sb GOOD 16F

    Sb GOOD 16F

  18. Slide 18: Slide 18

  19. Slide 19: Oyong 3D seismic

    of Oyong 3D seismic (Ce Gas above oil oil Prospect Limit of Wortel reservoir Proposed well Contour interval 20 m

  20. Slide 20: Slide 20

  21. Slide 21: Slide 21

  22. Slide 22: OMY (Operator)

    OMY (Operator) Todd Ko

  23. Slide 23: Wellhead Platform and FPSO

    Wellhead Platform Floating Production Storage Offloading (FPSO)

  24. Slide 24: Slide 24

  25. Slide 25: ‘ie OF Field

    ‘ie OF Field $A Gas Condensate Fieid) |, EA CUE Permit O. BBKm WAAL EA Eleweoes. Lamberg Angel ; “Tartisrrnsy > we a Z Maries, 1B RR

  26. Slide 26: Troubadour

    g Troubadour AC/RL7 japle Field a Gas Field ™~ Pipeline o ACIRL7 Scale 200km

  27. Slide 27: Rawson Resources

    Rawson Resources || 200km?3D, 2 wells t . Tap JV a 0 Foote ta A 5i1km 2D, 506km? 3D. : 2 wells + 30 Koorkah1 Ess ech Origin JV 275km 2D, 235km? 3D

  28. Slide 28: Slide 28

  29. Slide 29: Slide 29

  30. Slide 30: Slide 30

Cue Energy Resources — Investor Presentation (May 2007) on 6ix