Cobalt Blue Holdings Ltd. · ASX:COB

Cobalt Blue — Austmine CEO Leadership Luncheon 2026

19 slides from Cobalt Blue's conference presentation, Apr 16, 2026

  1. Slide 1: ASX Announcement: Corporate presentation – Austmine CEO leadership luncheon

    16 April 2026 ASX Announcement ASX: COB | OTC: CBBHF Corporate presentation – Austmine CEO leadership luncheon Cobalt Blue Holdings Limited (ASX: COB | OTC: CBBHF) CEO, Dr Andrew Tong will present at the Austmine CEO Leadership Luncheon in Sydney today, 16 April 2026. We are pleased to publish the p

  2. Slide 2: An Integrated Minerals Processing Platform

    ASX: COB | OTC: CBBHF An Integrated Minerals Processing Platform April 2026

  3. Slide 3: Cobalt Blue Integrated Platform

    Cobalt Blue Integrated Platform ▪ Become Leading Australian Refined Cobalt Supplier ▪ Growth Plan for USA Cobalt and Manganese plant ▪ Commodity Diversification with Copper and Silver The Cobalt Blue Difference: ▪ Market leading, patented, minerals processing technology ▪ Broken Hill Technology Cent

  4. Slide 4: Cobalt Strategic Concentration Risk

    Cobalt Strategic Concentration Risk Supply chain vulnerability for advanced manufacturing sectors China controls ~70% mine production, ~80% processing China & FEOC Indonesia DRC US & Allies Global Reserves Mine Production Controlled Mine Production Mineral Processing 0% 10% 20% 30% 40% 50% 60% 70% 8

  5. Slide 5: Cobalt from Australia for Global Markets

    Cobalt from Australia for Global Markets Kwinana Cobalt Refinery is the strategic mid-stream anchor for Australia ▪ Market access & product qualification: Establishes credibility in battery and defence supply chains Global cobalt sulphate refineries ▪ De-risks Broken Hill investment: Lowering projec

  6. Slide 6: Kwinana Cobalt Refinery Overview

    Kwinana Cobalt Refinery Overview Investment ready ✓ Project partner: Iwatani 30% / 70% COB* ✓ Offtake LOI’s (Japan, France) ✓ Flowsheet fully piloted, samples available ✓ Glencore feedstock contract executed ✓ Permits granted from WA State Government ✓ Detailed final engineering design ~90% complete

  7. Slide 7: Kwinana Cobalt Refinery Feed Strategy

    Kwinana Cobalt Refinery Feed Strategy ONLY ESG approved & Traceable, in conformance with RMI Standards Cobalt Sulphate Hydroxide Stage 1 Glencore DRC contract 3,000 tpa By-products Ni + Cu industry Secondaries Battery black mass Cobalt Metal Rounds Stage 2 Hydroxide 6,000 tpa BHCP Source: Cobalt Blu

  8. Slide 8: Broken Hill Cobalt Project

    2023-24 Mine Portal for Sample Ore Broken Hill Cobalt Project Ancillary infrastructure Largest undeveloped primary cobalt resource in ▪ Power, water, rail and road connections to existing networks Australia, capable of providing enough cobalt for (onsite renewable power generation also being conside

  9. Slide 9: Large-scale system supporting staged development

    Large-scale system supporting staged development Favourable geometry underpins a staged, capital-efficient development pathway Pyrite Hill Deposit Railway Deposit The Pyrite Hill deposit extends over 1.2 Railway deposit extends ~2.5 km along strike, with km along strike, ~ 400 m down dip & mineralis

  10. Slide 10: Cobalt & Sulphur Markets Tighten

    Cobalt & Sulphur Markets Tighten Dual exposure to improving commodity cycles enhances revenue resilience, with sulphur providing an increasingly meaningful and underappreciated value stream Cobalt rebalancing Sulphur strengthening DRC supply controls tightening market, with Structural demand growth

  11. Slide 11: Growth Plan for USA Refinery

    Growth Plan for USA Refinery Partnership with Glomar Minerals US Domestic supplier of battery grade MnSO4 and cobalt metal / sulphate • Unlocking mid-stream for polymetallic nodules • Target 200,000 tpa plant in USA, by end 2028 • Manganese and cobalt refinery for US supply chain resilience • Based

  12. Slide 12: Commodity Diversification

    Commodity Diversification ▪ Stable long-term commodity markets ▪ Projects requiring metallurgical innovation Copper: Silver: Electrification & Energy transition & Advanced Manufacturing Safe Haven Source: Cobalt Blue Holdings Limited 11

  13. Slide 13: Halls Creek Project

    Halls Creek Project Exciting small-scale copper-silver-zinc project Status ▪ 2025 Scoping Study: 10.5-year LOM, attractive C1 costs, ▪ Estimated pre-tax NPV ~A$172m & IRR ~28%.* ▪ 250 km² tenement in WA’s Kimberley region ▪ Two major deposits**: Indicated Inferred Cu Zn Ag Onedin 3.7 Mt 0.4 Mt 1.40%

  14. Slide 14: Cobalt Blue Integrated Platform

    Cobalt Blue Integrated Platform Integrated testwork and flowsheet validation reduces development timelines and improves investment confidence Metallurgical testwork → Flowsheet optimisation → Validated flowsheet → FS confidence Demonstration & Piloting Broken Hill Cobalt Project Kwinana Cobalt Refin

  15. Slide 15: Cobalt Blue Q2 2026 Investment Summary

    Cobalt Blue Q2 2026 Investment Summary Key catalyst Significance As at market close 15 April 2026 Kwinana Cobalt Offtake Unlocks funding and FID Refinery agreements Ordinary Shares 583.9m Performance Rights 6.9m Options (expiry 23/4/2027 Ex. Price $0.20) 41.8m Broken Hill PFS completion & Revised pr

  16. Slide 16: Compliance Statements

    Compliance Statements Information included in this presentation is, in part, extracted from reports available via Assumption Input https://www.cobaltblueholdings.com and referenced in the following Compliance Statements. Cobalt Price US$60,186/t (AU$85,980) The Company confirms that it is not aware

  17. Slide 17: Compliance Statements

    Compliance Statements Classification Tonnes (Mt) CoEq (ppm) Co (ppm) S (%) Ni (ppm) Contained Co (kt) Contained S (kt) Contained Ni (kt) Pyrite Hill Measured 18.0 1,273 1,020 10.8 189 18.3 1,935 3.4 Indicated 8.7 889 703 8.0 137 6.1 693 1.2 Inferred 7.2 1,188 946 10.3 181 6.8 742 1.3 Total 33.9 1,15

  18. Slide 18: Compliance Statements

    Compliance Statements Mineral Resource estimate for the Onedin deposit detailed Slide 12: The information related to the Halls Creek Earn-In Agreement is extracted from classification ASX Announcement released on 18 February 2025 titled ‘COB Diversifies – Major Copper Project Earn in. The informatio

  19. Slide 19: Important Notice & Disclaimer

    Important Notice & Disclaimer The following notice and disclaimer apply to this investor presentation (Presentation). Forward-looking statements and forecasts You are, therefore advised to read this carefully before reading or making any other use This Presentation contains certain “forward-looking

Cobalt Blue Holdings — Austmine CEO Leadership Luncheon 2026 on 6ix