St. George Mining Ltd. · ASX:SGQ

St. George Mining — Merger or Acquisition (August 2024)

31 slides from St. George Mining's merger presentation, Aug 6, 2024

  1. Slide 1: Niobium. World class.

    Presentation for the acquisition of the Araxa Project, Brazil 6 August 2024 Niobium. World class.

  2. Slide 2: Disclaimer

    Disclaimer Forward-Looking Statements: This Presentation may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning St George’s planned exploration program and other statements that are not historical facts. Although St George believes t

  3. Slide 3: Investment Highlights

    Investment Highlights Acquisition of world-class niobium-REE opportunity • St George has secured the Araxa Project in Minas Gerais, Brazil Tier 1 location for niobium- • Located in the world’s leading district for niobium production and adjacent to the flagship REE projects operation of the world’s

  4. Slide 4: The Araxa opportunity

    The Araxa opportunity Deal propels St George onto global niobium stage ASX: SGQ | St George Mining Limited 4

  5. Slide 5: Araxa, Brazil

    Araxa, Brazil Established mining district in the state of Minas Gerais TIER 1 MINING JURISDICTION • Minas Gerais, “General Mines” in English, has a stable mining jurisdiction with thousands of mines focused on a range of metals including iron ore, lithium, precious gems, rare earths and niobium Arax

  6. Slide 6: Araxa Project

    Araxa Project Uncovering another jewel in the Barreiro Carbonatite MOSAIC ARAXA TIER 1 NIOBIUM LOCATION Facilities Project • St George’s Araxa Project is located within the Barreiro Carbonatite complex – a 5 km wide carbonatite hosting hard-rock niobium, REE and phosphate mineralisation • World-clas

  7. Slide 7: High-grade niobium from surface

    High-grade niobium from surface More than 500 intercepts of significant >1% Nb2O5 mineralisation* High-grade niobium in a selection of historical intersections (cut-off grade 1% Nb2O5): Hole ID From (m) To (m) Interval Nb2O5 % Resources of the world’s only 3 primary niobium operating (m) mines1: AAX

  8. Slide 8: World-class REE mineralisation

    World-class REE mineralisation Thick intercepts of high-grade REE from surface* High-grade REE in a selection of historical intersections (cut-off grade 2% TREO): Hole ID From (m) To (m) Interval TREO % World-class carbonatite-hosted REE deposit at Mt Weld in (m) Australia1: IXVK7 surface 60 60 11.1

  9. Slide 9: Abundant phosphate mineralisation

    Abundant phosphate mineralisation High-grade phosphate from surface* High-grade phosphate in a selection of historical intersections (cut-off grade 10% P2O5): Interval Hole ID From (m) To (m) P2O5 % (m) 0XVIL0 4 17 13 21.7 including 4 15 11 23 5.5XVIK1.5 47.5 57.5 10 22 including 50 57.5 7.5 25.7 1X

  10. Slide 10: Mineralisation open in all directions

    Mineralisation open in all directions Only 10% of project areas drilled1 Inset: Map of the total project area with shaded area indicating the zone with close- spaced drilling. Main map: zone with close spaced drilling. Section A1 to A2 is shown on slide 11. Section B1 to B2 is shown on slide 12. ASX

  11. Slide 11: Widespread niobium from surface

    Widespread niobium from surface (cut-off grade 1% Nb2O5 )1: * Historical drilling has not been reported under JORC Code 2012. Drill results have been previously reported under th Canadian NI43-101 standards. St George is not to be seen as reporting or adopting those results. ASX: SGQ | St George Min

  12. Slide 12: Widespread TREO from surface

    Widespread TREO from surface (cut-off grade 2% TREO)1: * Historical drilling has not been reported under JORC Code 2012. Drill results have been previously reported under the Canadian NI43-101 standards. St George is not to be seen as reporting or adopting those results. ASX: SGQ | St George Mining

  13. Slide 13: CBMM: Blue ribbon neighbour

    CBMM Blue ribbon neighbour CBMM • St George’s Araxa Project shares tenement boundaries with CBMM’s niobium mine – the largest in the world • CBMM’s mine has operated for more than 50 years • St George’s Araxa Project and CBMM’s niobium mine are both situated within the Barreiro Carbonatite – a carbo

  14. Slide 14: St George Mining Limited

    St George Mining Limited The new global player in niobium ASX: SGQ | St George Mining Limited 14

  15. Slide 15: Niobium – Future Facing Mineral

    Niobium – Future Facing Mineral Essential for modern high-tech applications Niobium is produced into Ferroniobium (88% of demand) and Niobium oxide (12%) with demand for Niobium oxide accelerating due to increasing use in battery technologies1 Ferroniobium Niobium Oxide Battery Technologies • Widely

  16. Slide 16: Niobium supply concentration

    Niobium Supply concentration with only 3 producers Niobec 9% Primary niobium producers: CMOC CBMM: 11% Araxa mine, Minas Gerais, Brazil CMOC: Boa Vista mine, Goias, Brazil Niobec: Niobec mine, Quebec, Canada CBMM 80% 2024 Global supply of niobium by primary producers1 Refer to Appendix A for full li

  17. Slide 17: Niobium: Critical mineral with very high priority

    Niobium Critical mineral with very high-priority EU Critical Mineral Rankings US Critical Mineral List Asian buyers invest significant sums to secure supply1: Supply Risk Ranking 1 HREE 1 Gallium March 2011: US$1.8b paid by Japanese/Korean consortium to 2 Niobium 2 Niobium buy 15% equity in CBMM 3 M

  18. Slide 18: Unique Opportunity for St George

    Unique Opportunity for St George Positioned to be the world’s next niobium producer Well-established • Two mining concession applications and one exploration permit. Permitting Process • Environmental permit applications underway to finalise grant of mining concessions. Extensive historical drilling

  19. Slide 19: The Araxa acquisition

    The Araxa acquisition Deal highlights/capital raising ASX: SGQ | St George Mining Limited 19

  20. Slide 20: The Acquisition: Key Terms

    The Acquisition Key Terms Niobium Dragon Pty Ltd, wholly owned subsidiary of St George, has entered into a binding Share Sale Agreement The Acquisition with Itafos Inc to acquire all the issued capital of Itafos Araxa Mineracao E Fertilizantes S.A which owns 100% of the Araxa Project US$21,000,000 p

  21. Slide 21: The Capital Raising: Key Terms

    The Capital Raising Key Terms Fund Raising A$21,250,000 in new funds to be raised A$2,500,000 share placement under Listing Rule 7.1 (no shareholder approval required) Tranche 1 • 100,000,000 ordinary shares at A$0.025 per share A$18,750,000 share placement subject to shareholder approval at a Gener

  22. Slide 22: Timetable to Completion

    Timetable to Completion Event Date Trading halt 2 August 2024 Commitments for fundraising finalised 5 August 2024 SGQ commences trading 6 August 2024 Settlement of shares – Tranche 1 placement 12 August 2024 Allotment of shares – Tranche 1 placement 12 August 2024 Notice of EGM issued 16 August 2024

  23. Slide 23: Pro forma capital structure

    Pro forma capital structure Pro forma – Ordinary Shares Pro forma – Capital Structure Post Completion Shares outstanding 6 August 2024 988,540,432 Shares on issue 2,212,267,147 Shares to be issued Listed options 39,188,238 • Tranche 1 100,000,000 Unlisted options 149,224,199 • Tranche 2 750,000,000

  24. Slide 24: Company Overview

    Company Overview Experienced leadership to deliver re-rating Board of Directors Management Executive Chairman: John Prineas Exploration Manager – Brazil: Wanderly Basso Founding director and chairman with more than 30 years Brazilian trained geologist with technical qualifications in Brazil experien

  25. Slide 25: Timeline and Key Milestones

    Timeline and Key Milestones High growth strategy 2024 2025 MILESTONE JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN Purcahse completion Drilling 5,000m Diamond drilling Maiden JORC resource Independent resource estimate Metallurgical study Met testwork Drilling – Resource Growth 3.000m diamond dril

  26. Slide 26: Building a globally significant niobium-REE mining company

    ST GEORGE MINING LIMITED Building a globally significant niobium-REE mining company ASX: SGQ | St George Mining Limited 26

  27. Slide 27: Appendix A - References

    Appendix A - References Slide 5 Slide 9 1. Niobium mine of CBMM (Companhia Brasileira de Metalurgia e Mineração) and 1. See Note 1 for Slide 6 phosphate mine of Mosaic (The Mosaic Company (NYSE:MOS)) Slides 10, 11 and 12 2. Itafos Inc – TSX-V: IFOS 1. Based on historical drilling. See Table 3 for fu

  28. Slide 28: Appendix B – Key Risks (continued)

    Appendix B – Key Risks (continued) The future performance of the Company and the value of its shares may be influenced by a range of factors, many of which are largely beyond the control of the Company and its directors. Key risks associated with the Company’s business and the industry in which it o

  29. Slide 29: Appendix B – Key Risks (continued)

    Appendix B – Key Risks (continued) The future performance of the Company and the value of its shares may be influenced by a range of factors, many of which are largely beyond the control of the Company and its directors. Key risks associated with the Company’s business and the industry in which it o

  30. Slide 30: Appendix B – Key Risks (continued)

    Appendix B – Key Risks (continued) The future performance of the Company and the value of its shares may be influenced by a range of factors, many of which are largely beyond the control of the Company and its directors. Key risks associated with the Company’s business and the industry in which it o

  31. Slide 31: Competent Person Statement

    Competent Person Statement The information in this Presentation that relates to historical results is based upon, and fairly represents, information and supporting documentation reviewed by Mr. Carlos Silva, Senior Geologist employed by GE21 Consultotia7 Mineral and a Competent Person Person who is

St. George Mining — Merger or Acquisition (August 2024) on 6ix