Slide 1: Secondary Listing on ASX and Capital Raising
Southern Hemisphere Mining Limited Secondary Listing on ASX and Capital Raising Trevor Tennant – Chairman and Managing Director

Slide 2: Disclaimer Notice and Competent Person Statement
Disclaimer Notice This Presentation contains certain forward –looking information and forecasts. Such forecasts , projections and information are not a guarantee of the Company’s future performance and include unknown risks and uncertainties. Accordingly, the actual results and developments may diff

Slide 3: Overview
Overview Los Pumas Project location ¾ TSX‐V listed exploration company focused on early development of Los Pumas Manganese Project in Chile ¾ Undertaking a secondary listing on the ASX and raising A$8m to fund: – acquisition of additional tenements for Los Pumas – Definitive Feasibility Study for Lo

Slide 4: Southern Hemisphere capital structure and major shareholders
Southern Hemisphere ¾ Proposed ASX Code: SUH Capital Structure Post Offer Major Shareholders Existing Shares 67,685,687 Trevor Tennant (Executive Director) 15.61% Offer Shares 32,000,000 Wang Xifu 13.04% Total Shares on Issue post Offer 99,685,687 James Pearson (Executive Director) 9.07% Post Offer

Slide 5: Board of Directors
Board of Directors Chairman and Managing Director Non Executive Director Non‐Executive ¾ mining engineer with over 37 ¾ over 25 years experience in mine Trevor Tennant years experience Eduardo Valenzuela operations, technical services and ¾ previous executive director of project financing Portman, O

Slide 6: Mining in Chile
Mining in Chile ¾ The largest copper producer in the world ¾ Strong mining history with westernised regulations ¾ Robust growing economy and stable government Robust, ¾ Australia, Canada, USA, EU, China and Japan have free trade agreements ¾ Los Pumas Project located in a region that is largely unde

Slide 7: Los Pumas Manganese Project
Los Pumas Manganese Project Los Pumas Regional Location Map ¾ Large, easy to mine JORC Inferred Resource ¾ Low capital and operating costs expected ¾ Excellent logistics and near mine infrastructure ¾ Shallow ore body with low strip ratio ¾ Beneficiates easily ¾ High manganese to iron ratio with low

Slide 8: Potential Development Scenario
Potential Development Scenario ¾ Initial 15Mt Inferred Ore Resource targeting annual production of 500kt ¾ Targeting initial shipment June 2011 ¾ Low capital cost with intended open pit, mine and beneficiation plant ¾ Road transport to bulk loading facility at existing port ¾ Shipping to China expec

Slide 9: Project Infrastructure
Project Infrastructure Arica Port Undercover stockpile warehouse Ship loading conveyor system Port Infrastructure ¾ Arica Port 170km by road from Los Pumas with bulk loading capabilities for Handymax ships ¾ Undercover stockpile facilities available (used for zinc concentrates from Bolivia) ¾ Additi

Slide 10: Project Infrastructure
Project Infrastructure Arica – La Paz Rail Line Arica – La Paz Highway Project Access Road Transport p logistics g ¾ Major arterial highway from Arica to La Paz 40kms from Los Pumas ¾ Rail line between Arica to La Paz less than 11km from Los Pumas – considered for re‐commissioning by Chilean Governm

Slide 11: Project Infrastructure
Project Infrastructure Proposed Mine Camp/Hotel at Putre Regional Capital of Arica Arica Chacalutta Airport Mine Camp p ¾ Mine camp/hotel available at Putre – established by Shell to service a large mine workforce at mothballed gold mine ¾ Regional capital Arica serviced by daily domestic flights fr

Slide 12: Geology
Geology Los Pumas Project Area DDH drilling at Los Pumas ¾ Tabular flat mantle near surface ¾ Ore Resource at 0‐30m depth making mining easy ¾ Past artisan mining activity prevalent

Slide 13: Geology
Geology Ore body flat, shallow and easy to mine outcropping to a maximum depth of 30m Los Pumas Cross Section of the North Sector Los Pumas Major Geological Features Taapaca Volcano Los Pumas Project Area Taapaca Volcanic l Complex l ((TVC)) Lauca Ignimbrite (PII) Huaylas Formation (Msh) Los Pumas S

Slide 14: Ore Resource
Ore Resource Los Pumas Regional Map ¾ JORC Inferred Resource of 15Mt @ 10%M 1 10%Mn ¾ Infill drill program to upgrade to indicated and measured categories g ¾ Opportunities for increasing tonnages at Los Pumas and other sites are high Notes: 1. Using a 6% Mn cut‐off

Slide 15: Metallurgy
Metallurgy Los Pumas Drill Core Regional Artisanal Workings ¾ Test work from surface ggrab samples p at an S.G. of 3.0 – average of 37.4% Mn, 1.4% Fe, 22.3% SiO2 and 0.07% P ¾ Mn to Fe ratio of 26 makes product very attractive ¾ Awaiting definitive results from test work on diamond drill core

Slide 16: Regional Exploration
Regional Exploration Regional map of exploration potential ¾ Mineralisation known since i World W ld War W II but b t potential not assessed previously ¾ Other regional targets identified

Slide 17: Project Status
Project Status ¾ Identified the Los Pumas Project in 2008 ¾ Key tasks completed: 9 150 RC drill holes 9 25 Diamond Drill holes 9 Inferred Ore Resource estimated 9 Independent Expert Report 9 Concept design of process plant completed and initial pricing received 9 Key staff appointments made 9 Develo

Slide 18: Targeted Milestones
Targeted Milestones J January 2010 M t ll Metallurgy results lt due d January 2010 Revised resource estimate late March 2010 Completion of Definitive Feasibility Study A il 2010 April D i i tto proceed Decision d June 2011 First shipment Early 2010 revised resource estimate due followed by d i i to

Slide 19: Exploration Projects
Exploration Projects Historical open cut at La Cuyana in the Central Cluster Historical mining activity at Tres Cruces in the Central Cluster ¾ Large portfolio of exploration projects throughout Chile over 800km2 ¾ H ld in Held i four f clusters: l – Calama – Salamanca – Southern – Central

Slide 20: Exploration Projects
Exploration Projects Calama Cluster Chitigua Project ¾ porphry copper on controlling structure to some of world’s largest copper mines Salamanca Cluster Las Santas Project ¾ porphry copper. Past exploration work by Southern Hemisphere showed drill ready porphry Cunlagua Project ¾ porphry copper. His

Slide 21: Use of Funds
Use of Funds Source of funds A$ Current cash and liquid assets 1,800,000 Offer ff proceeds d 8,000,000 Uses of funds A$ Definitive Feasibility Study for Los Pumas 3,000,000 Acquisition of additional tenements for Los Pumas 800,000 Assessment and exploration of Exploration Projects 2,000,000 Two year

Slide 22: Summary
Summary ¾ Los Pumas Manganese Project – large easy to mine JORC Inferred Resource – low capital and operating costs expected – excellent logistics and near mine infrastructure – shallow ore body with low strip ratio – beneficiates easily – high manganese to iron ratio and low phosphorous – low State
Source: Internet Archive copy of shmining.com.au
More decks from Southern Hemisphere Mining Limited
Investor Presentation (November 2026)20 slides · November 2026
2026 Latin Rocks Conference24 slides · October 2026
Investor Presentation (September 2026)21 slides · September 2026
Investor Presentation (August 2026)19 slides · August 2026
Investor Presentation (July 2026)19 slides · July 2026
Investor Presentation (July 2026)18 slides · July 2026