Atalaya Mining Copper Sa · LSE:ATYM

Atalaya Mining Copper Sa — EMED Mining Public — Investor Presentation (September 2015)

34 slides from Atalaya Mining Copper Sa's investor presentation, September 2015

  1. Slide 1: Riotinto Copper Project

    Riotinto Copper Project Proyecto Riotinto A new European-based copper company September 2015

  2. Slide 2: Disclaimer

    Disclaimer The information contained in this document invitation to subscribe for or purchase any securities and of economic evaluations; changes in project parameters as (“Presentation”) has been prepared by EMED Mining Public neither this Presentation nor anything contained herein shall plans cont

  3. Slide 3: Why EMED Mining?

    Why EMED Mining? ASSETS MANAGEMENT CAPITAL • Low capital intensity • Experienced new team • June 2015 financing brownfields project in with proven US$95m fully safe political development and subscribed jurisdiction operating track record • Fully financed to • New copper producer • Important in-count

  4. Slide 4: Project Overview

    Project Overview  Existing infrastructure refurbished ahead of schedule Commissioning currently under way  Ramping to 7.5Mtpa ROM for 37,500tpa Cu in concentrate (Phase 1 Expansion)  Potential increase to 9.0-10.0Mtpa for 45,000tpa Cu in concentrate (Phase 2)  LOM C3 costs US$1.90/lb  Proven &

  5. Slide 5: What's Changed?

    What’s Changed? NEW EXPERIENCED MANAGEMENT TEAM HAS DELIVERED A producing copper mine Significant reduction in ahead of schedule during total Capex and increased difficult market conditions production profile ahead of FS plans US$95m equity financing covering Capex for Phase1 Environmental and Socia

  6. Slide 6: Strong Technical & Financial Expertise

    Strong Technical & Financial Expertise Over 36 years’ experience operating and developing mining projects. Former President, CEO and COO of Rio Narcea Alberto Lavandeira Gold Mines (1995-2007), which built three mines including Chief Executive Officer Aguablanca. Director of Samref Overseas S.A (200

  7. Slide 7: US$95m equity financing completed; Capital costs revised

    US$95m equity financing completed Capital costs revised Reconciliation of Current Capital Cost Estimate to Behre Dolbear NI 43-101 Report Revised estimate from US$50m targeted capital expenditure reductions announced in Sept 2014 Note: Numbers may not add due to rounding 1. Behre Dolbear NI 43-101 R

  8. Slide 8: Phase 1 Progress: Under budget and ahead of schedule

    Phase 1 Progress Under budget and ahead of schedule Timeline to Completion 8

  9. Slide 9: Current Operating Plan Overview

    Current Operating Plan Overview Q2 2015 milestones Blasting Studying First recommenced expansion and concentrate Started wet optimization of produced commissioning existing tailings storage within August 2015 Ore delivered to current footprint crusher and pre- to minimize stripping started costs 9

  10. Slide 10: Infrastructure and Site Layout

    Infrastructure and Site Layout Power BADAJOZ HUELVA SEVILLA  Initial connection to the grid at 24MW HV – expanding to 31MW in September Water  5 million m³ of clean water available. Water in pits to be treated and re-used, minimizing use of external water and discharge Tailings  Capacity of ~4 ye

  11. Slide 11: Phase 1 Low Capital Intensity infrastructure

    Phase 1 Low Capital Intensity Phase 1 infrastructure Existing CRUSHING AND SCREENING SECONDARY & TERTIARY PRIMARY CRUSHER AREAS CRUSHER BELT FEEDER NO.4 TESTING CONCENTRATE FLOTATION TESTS TAILINGS FACILITIES THICKENER 11

  12. Slide 12: Phase 1 US$62m Capex Savings Through refurbishment program

    Phase 1 US$62m Capex Savings Through refurbishment program FINE STORAGE FEEDERS FLOTATION AREA FLOTATION – FIRST AGITATORS CLEANER DISTRIBUTOR FINE ORE STOCKPILE SECONDARY AND GRINDING AREA BUILDING TERTIARY CRUSHING AREA 12

  13. Slide 13: Phase 1

    Phase 1 Phase 1 SUBSTATION REAGENTS PLANT CONTROL ROOM CONCENTRATE PRESS FILTER LABORATORY NEW THICKENERS 13

  14. Slide 14: Phase 1 Expansion and Phase 2

    Phase 1 Expansion and Phase 2 PHASE 1 EXPANSION – 7.5MTPA PHASE 2 – 9.5MTPA Phase 1 Expansion construction work well advanced Phase 2 modelling under way to expand production to 9.5Mtpa with new milling and flotation capacity 14

  15. Slide 15: Expansion to 9.5Mtpa

    Expansion to 9.5Mtpa Timeline to Completion 15

  16. Slide 16: Exploration

    Exploration Riotinto Copper Project sits in world’s largest VMS system  Prior to 2014, no exploration drilling for 25 years  Since 2014 >17,000 metres of RC drilling within the pit to increase reserves  Priority exploration targets include existing mineralisation at Cerro Colorado and neighbourin

  17. Slide 17: Organic Growth Potential

    Organic Growth Potential  Minimal exploration conducted at depth  where high grade potential exists around historical underground workings CERRO COLORADO SALOMÓN PLANES SAN DIONISIO SAN ANTONIO  Compilation of all existing FILÓN SUR drilling data  based on detailed geological reinterpretation 

  18. Slide 18: Organic Growth Potential (cont'd)

    Organic Growth Potential (cont’d)  Work in progress by QP to classify historical estimates as mineral reserves and resources  On completion, an independent consultant will evaluate the results in order to produce an NI 43-101 compliant resource estimate  Conceptual studies on treatment of mixed P

  19. Slide 19: District Potential

    District Potential  Licences are located at eastern end of the highly prospective Iberian pyrite belt, which extends ~230km between Seville in the east and Atlantic coast near Lisbon in the west  140mt copper ore have been produced from Project Riotinto since Roman times  Within the pyrite belt,

  20. Slide 20: Corporate Snapshot

    Corporate Snapshot Overview² Major Shareholders² EMED Mining Public Limited Holder # shares % ISC Exchanges AIM (AIM:EMED) / TSX (TSE:EMD) Share price (GB pence) 3.75p 770,530,339 Urion Mining International (Trafigura) 22.0 Share price C$ 0.075 Shares Outstanding 3,500,386,633 Hong Kong Xiangguang I

  21. Slide 21: Market Positioning

    Market Positioning P/NAV (x) Producers Pre-production/Feasibility Reserves development/Exploration Source: Thomson Reuters as at COB 04/09/2015 21

  22. Slide 22: Share Price Comparison

    Share Price Comparison Compared with other producers, EMED’s share price has held up well at a time of depressed copper prices 22

  23. Slide 23: Copper Market Outlook

    Copper Market Outlook  Short term - supply expected to Copper Supply / Demand Outlook1 exceed demand. Market expected 250 170 188 4.5 200 4.0 to shift to deficit in 2016 150 3.81 3.76 3.5 3.72 Surplus/Deficit (kt) 100 74 3.0 Price (US$/lb) 3.33 3.35 50 3.1 2.91 2.5 - 2.0 (50)  Decrease in refined

  24. Slide 24: Investment Case

    Investment Case Project de-risked Well positioned to survive low copper price environment Production commencement Fully financed ahead of through Phase schedule and 1 Expansion under budget (7.5Mtpa) A NEW COPPER COMPANY THAT DELIVERS Infrastructure refurbished – Supportive low capital strategic int

  25. Slide 25: Contact

    Contact Alberto Lavandeira Adán CEO Telephone: +34 959 59 28 50 Email: info@emed-mining.com Investor Relations North America Michelle Roth Roth Investor Relations Telephone: +1 732 792 2200 Email: michelleroth@rothir.com Investor Relations UK and Europe Carina Corbett 4C Communications Ltd Telephone

  26. Slide 26: Strong Technical & Financial Expertise

    Strong Technical & Financial Expertise Roger Davey Over 40 years’ experience in the mining industry. Former Senior Mining Engineer at NM Rothschild & Sons; former Director, VP and GM, AngloGold (Argentina). Currently a Chairman director of Orosur Mining Inc. and Condor Gold Plc. Non-Executive Over 3

  27. Slide 27: Strong Technical & Financial Expertise

    Strong Technical & Financial Expertise Damon Barber Senior Managing Director of Liberty Metals & Mining Holdings, LLC. Formerly held positions with mining companies and served as the Head of Deutsche Bank's Metals Non-Executive Director Mining investment banking practice in Asia-Pacific. Spent more

  28. Slide 28: Cost Breakdown from NI 43-101

    Cost Breakdown from NI 43-101 (*) Possible savings identified by Behre Dolbear from possible reductions in mining and maintenance contractor charges, lower lime costs and a steepening of pit wall angles to reduce waste mining none of which are assured at this time. (**) Excludes Non operating costs

  29. Slide 29: Reserves and Resources

    Reserves and Resources Open Pit Mineral Reserves and Resources¹ Ore (Mt) Copper (%) Copper (kt) Reserves Proven 39 0.38 148 Probable 84 0.54 458 Total Reserves 123 0.49 606 Resources Measured 48 0.38 180 Indicated 155 0.49 760 Total Measured & 203 0.46 930 Indicated Inferred 2 0.50 10 1. Behre Dolbe

  30. Slide 30: Transaction Impact

    Transaction Impact Shareholder Structure (Post Transaction) Trafigura 100% Liberty Orion Mine Urion Other XGC Minerals Finance Holdings 27.52% 13.98% 21.93% 14.56% 22.01% EMED 4% KEFI Investor Description % ISC Mining Minerals Public Ltd Plc One of the world’s leading independent commodity 22.01% 10

  31. Slide 31: Transaction Impact (cont'd)

    Transaction Impact (cont’d) Key Investor Rights (post transaction) Company Agreement Terms • Subscription  Pre-emptive right over further issues of equity shares1 XGC Agreement  One board seat2 • Offtake Agreement  Offtake granted over 49.12% of life of mine reserves in the Technical Report Orion

  32. Slide 32: Transaction Impact (cont'd)

    Transaction Impact (cont’d) Key Investor Rights (post transaction) Company Agreement Terms  Exclusive agreement to provide agency services to Company on all concentrate sold Agency Agreement  For the first 932,000 dmt concentrate sales a base marketing fee of EUR11.25/dmt of concentrate sold is pa

  33. Slide 33: Mining Industry in Spain

    Mining Industry in Spain 1 2 6 Significant Mining Rio Tinto Copper Project Aguas Teñidas Infrastructure Copper Copper, zinc Substation located 3 4 Power 1km from mine site 5 10 7 Supplied from Las Cruces 9 SPAIN Aguablanca Copper Nickel, copper Campofrio reservoir 3km away Water 5 6 and Aguas Limpia

  34. Slide 34: Riotinto Copper Project

    Riotinto Copper Project Proyecto Riotinto A new European-based copper company September 2015