Ferrexpo plc · LSE:FXPO

Ferrexpo — Fact Sheet (2019)

3 slides from Ferrexpo's fact sheet, 2019

  1. Slide 1: Management of Tailings Storage Facility

    2019 MANAGEMENT OF TAILINGS STORAGE FACILITY

  2. Slide 2: About Ferrexpo's Tailings Facility

    A B O U T F E R R E X P O ’ S TA I L I N G S FA C I L I T Y Ferrexpo operates one tailings dam covering an area of 1,500 hectares. The dam is constructed on flat topography and the method of construction is the upstream methodology. The dam is split into three sections with each section subdivided i

  3. Slide 3: Tailings Dam Management Q&A per Church of England Disclosure Request

    TA I L I N G S D A M M A N A G E M E N T Q & A P E R C H U R C H OF ENGLAND DISCLOSURE REQUEST Question Notes Answer 1. "Tailings Facility" Name/Identifier Please identify every tailings storage facility and identify if there are multiple The tailings storage facility is made of two compartments: da

Ferrexpo — Fact Sheet (2019) on 6ix