Corning Incorporated · NYSE:GLW

Corning — Technical Presentation (May 2016)

22 slides from Corning's technical presentation, May 11, 2016

  1. Slide 1: Public Meeting: Study Area Characterization Project Update

    Public Meeting NYSDEC Project ID# 851046 Study Area Characterization Project Update Corning Incorporated May 11, 2016 1

  2. Slide 2: Welcome and Introductions

    Welcome and Introductions • Dan Collins – Division Vice President , Corporate Communications, Corning Incorporated • John Sontag, Weston Solutions, Inc. (WESTON) – environmental sampling specialists • Highly experienced on similar projects • Engaged by Corning Incorporated to conduct the sampling wo

  3. Slide 3: Why We Are Here

    Why We Are Here • Provide update and findings from work completed in the Study Area since March 2015 Public Meeting • Results for samples collected to date at 117 of 186 residential properties meet the residential soil cleanup objectives (SCOs) • Residential SCOs are concentrations in soil which wer

  4. Slide 4: Project Status/Update

    Project Status/Update • Residential Area Sampling • Additional soil sampling conducted at 121 properties in 2015 • Sampling conducted at 186 properties to date • Additional sampling completed at: • Houghton Park • City of Corning rights‐of‐way • Corning Christian Academy • City of Corning Memorial S

  5. Slide 5: Overview

    Overview • Sampling conducted at 186 residential properties in the Study Area to date • Additional sampling was conducted in the Study Area to further define the extent of a layer of fill material in the following areas: • City of Corning rights‐of‐way in the Residential Area • Corning Christian Aca

  6. Slide 6: Study Area

    Study Area ae ‘ Sap wey S| Houghton: Park City of Corning | ay Memorial Stadium Corning: led Post High School ry

  7. Slide 7: Methods Used

    Methods Used • Surface soils • Top 2 inches of soil • Hand scoop • Shallow soils • Soil that is 2 inches to 2 feet from the surface • Hand auger or Geoprobe® • Subsurface soils • Down to 15 feet • Rigs using small diameter tube (2 inches) • Test pits • Approximately 7 feet long, 4 feet deep, and 1 f

  8. Slide 8: Sample Results – Properties in the Residential Area

    Sample Results – Properties in the Residential Area • Sampled a total of 186 properties in the Residential Area of the Study Area to date • 117 properties – all samples meet the residential SCOs • 69 properties – one or more samples above residential SCOs for one or more constituent 8

  9. Slide 9: Next Steps at Properties in the Residential Area

    Next Steps at Properties in the Residential Area • NYSDEC requires additional sampling • 70 properties where only surface soil samples were collected and results meet the residential SCOs • Further delineation at some other properties • Property owners will be asked for permission for access to coll

  10. Slide 10: City of Corning Rights-of-Way and Houghton Park

    City of Corning Rights‐of‐Way and Houghton Park • 63 soil borings advanced in City of Corning rights‐of‐way to date • 20 of these soil borings advanced in 2015 10

  11. Slide 11: Test Pits in City of Corning Rights-of-Way and Houghton Park

    Test Pits in City of Corning Rights‐of‐Way and Houghton Park • 7 Test pits excavated in City of Corning rights‐of‐way and Houghton Park 11

  12. Slide 12: Corning Christian Academy Property

    Corning Christian Academy Property • 3 additional soil borings were advanced to investigate soils south of the main entrance • Layer of fill material observed starting deeper than ½ foot below the sod cover 12

  13. Slide 13: Corning-Painted Post School District Property

    Corning‐Painted Post School District Property • Additional samples were collected in 2015 to further characterize the Corning‐Painted Post School District Property • 3 additional surface soil samples • 13 additional soil borings 13

  14. Slide 14: City of Corning Memorial Stadium Property

    City of Corning Memorial Stadium Property • In 2015, 10 additional soil borings were advanced to investigate subsurface conditions under the turf field and further delineate other areas • Layer of fill material observed below the turf field 14

  15. Slide 15: Groundwater Results

    Groundwater Results • 7 groundwater monitoring wells sampled • Sampled irrigation well on school property • Second round of groundwater samples collected in April 2015 • Groundwater has not been found to be impacted 15

  16. Slide 16: Proposed Interim Remedial Measures

    Proposed Interim Remedial Measures • Interim Remedial Measures (IRMs) are remedial actions that can be designed to be part of the final remedy and are conducted prior to completion of investigation work. • Corning Incorporated has proposed IRMs in the following areas: • Corning Christian Academy • C

  17. Slide 17: Corning Christian Academy Property

    Corning Christian Academy Property • An IRM has been proposed in area marked in yellow • If approved, 2 feet of soil would be excavated and a new soil cover would be placed over a demarcation layer 17

  18. Slide 18: Corning-Painted Post School District Property

    Corning‐Painted Post School District Property • An IRM has been proposed areas marked in yellow • If approved, 1 foot of soil would be excavated and a new soil cover would be placed over a demarcation layer 18

  19. Slide 19: City of Corning Memorial Stadium Property

    City of Corning Memorial Stadium Property • An IRM has been proposed in the areas marked in yellow • Sampling has recently been collected to delineate one additional area • If approved, 2 feet of soil would be excavated and a new soil cover would be placed over a demarcation layer 19

  20. Slide 20: Overview

    Overview • Sampled a total of 186 properties in the Residential Area of the Study Area to date • 117 properties – all samples meet residential SCOs • 69 properties – one or more samples above residential SCOs for one or more constituent • Groundwater has not been found to be impacted 20

  21. Slide 21: Next Steps

    Next Steps • Interim Remedial Measure (IRM) activities proposed at: • Corning Christian Academy • Corning‐Painted Post School District property • Corning Memorial Stadium • NYSDEC will address next steps for the Residential Area in their presentation 21

  22. Slide 22: How Can You be Kept Informed

    How Can You be Kept Informed • Document repositories • Southeast Steuben County Library 300 Nasser Civic Center Plaza, Corning, NY 14830 Contact Reference Librarian (607‐936‐3616) for appointment Hours: Mon, Wed, Fri: 9:00 am – 6:00 PM Tue, Thur: 9:00 am – 8:00 PM • NYSDEC Region 8 Office 6274 Avon‐