Turquoise Hill Resources — Bank of America Merrill Lynch conference 2014
13 slides from Turquoise Hill Resources's conference presentation, May 14, 2014
Slide 1: Oyu Tolgoi – a world-class copper and gold mine
Bank of America – Merrill Lynch MAY 14, 2014 Oyu Tolgoi – a world-class copper and gold mine KAY PRIESTLY, CEO
Slide 2: Forward-looking statements
Forward-looking statements This presentation includes certain “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of the “safe harbour” provisions of the United States Private Securities Litigation Reform
Slide 3: Updates from the Gobi
Updates from the Gobi March 2014 was Oyu Tolgoi’s first operating cash flow positive month Project finance bank commitment extension letters requested Continued strong safety performance 94% of 2014 expected production already under contract Concentrate sales continue to accelerate New rai
Slide 4: The Oyu Tolgoi mine
The Oyu Tolgoi mine Strategically located ~80km from Chinese border 4
Slide 5: Concentrate sales progressing well
Concentrate sales progressing well Oyu Tolgoi’s copper concentrate is loaded into bags, each weighing about two tonnes. 5
Slide 6: Production: 2013 vs. 2014
Production: 2013 vs. 2014 2013 Production 2014 Guidance 76,700 tonnes of copper 135,000 to 160,000 tonnes of copper in concentrates in concentrates (Q1: 25.3k tonnes) 157,000 ounces of gold 600,000 to 700,000 ounces of gold in concentrates in concentrates (Q1: 66k ounces) 26,400 tonnes of
Slide 7: A 40-plus year asset
A 40-plus year asset Near-term and large scale Long-life mine 2.2bt measured & indicated and 4.4bt inferred resource 1.5bt mineral reserve, 26.5Blb. of copper and 12.9Moz. of gold 10 year averages of: 332,000t of copper in concentrate 495,000oz. of gold 2.3Moz. of silver Source: 2013 O
Slide 8: First quartile costs
First quartile costs Copper mine cost curve in 2020 (c/lb, 2013$) 400 Oyu Tolgoi is in the first quartile of the industry Oyu Tolgoi cost curve Other Mines 300 Third largest copper mine after planned expansion1 Top 10 copper deposit by 200 contained reserves and resource2 One of the largest
Slide 9: Copper and gold market strength
Copper and gold market strength Copper mine supply/demand outlook (Mt) Copper market likely to see small surplus in coming years Base Highly Probable Primary Demand 30 Ongoing attrition at existing Forecast mines driven by structural 25 decline in grade; continued demand growth means the 20 indu
Slide 10: Made in Mongolia
Made in Mongolia Mongolians now occupy more than 90% of Oyu Tolgoi roles Over $1 billion in taxes, pre-payments and fees paid to the Government since 2010 Partnered with more than 1,300 local suppliers over the last two years $126 million investment in education and training across Mongolia
Slide 11: Multiple development options
Multiple development options All options being evaluated to ensure optimum development pathway Actual operating performance will inform choice of expansion path A decision to expand the concentrator is not be required for a couple years 11
Slide 12: Proven mineralized trend of ~26km
Proven mineralized trend of ~26km 12
Slide 13: Turquoise Hill – a long-term growth opportunity
Turquoise Hill – a long-term growth opportunity Pure copper and gold exposure Positive operating cash flow generation began in March 2014 Progressing project financing for funding of high-grade underground development Significant growth, development and expansion opportunities Strategicall
Turquoise Hill Resources — Bank of America Merrill Lynch conference 2014 on 6ix