TransAtlantic Petroleum Ltd

TransAtlantic Petroleum — Corporate Update (February 2014)

28 slides from TransAtlantic Petroleum's corporate update, Feb 5, 2014

  1. Slide 1: Company Update February 2014

    Company Update February 2014

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS Outlooks, projections, estimates, targets and business plans in this presentation or any related subsequent discussions are forward - looking statements . Actual future results, including TransAtlantic Petroleum Ltd . ’s own production growth and mix ; financial results ;

  3. Slide 3: Molla Area – Dadaş Shale

    MOLLA AREA – DADAŞ SHALE 3 Ş elmo Field Idil Prospects Bakuk Field Arpatepe Field TPAO Discovery Bahar Field Ambarcık Well Göksu Field Molla Field Perenco’s Kastel Field (EUR 15 MMbo) Batı Raman Field Largest oil field in Turkey Shell Oil Dadaş Test

  4. Slide 4: Molla 3D Seismic Program

    MOLLA 3D SEISMIC PROGRAM 4 Seismic data shot as of January 13, 2014. Molla 3D seismic program encompasses approximately 800 km 2 (300 square miles). TransAtlantic’s Molla Field TransAtlantic’s Göksu Field Perenco’s Kastel Field TransAtlantic’s Bahar Field TPAO Discovery Bostanpinar Shell Oil Dadaş T

  5. Slide 5: Molla Area: Five Geological Targets

    Demonstrated horizontal success with Göksu - 3H at 200 Bbl/d after 14 months of production Vertical discovery Bahar - 1 IP ~600 Bbl/d post frac; Current ~200 Bbl/d Bahar - 2 tested 170 Bbl/d Potential resource play MOLLA AREA: FIVE GEOLOGICAL TARGETS 5 Target Zones Şelmo producing zone Göksu: 5,500

  6. Slide 6: Economics of Molla Horizontals

    ECONOMICS OF MOLLA HORIZONTALS 6 At $3.5 Million Per Well, It’s Prudent to Wait for 3D Seismic Göksu - 3H (Horizontal, 1,600’ lateral) • Cost: $3.5 million; Cum. production > 140,000 bbls • Net Present Value: $13.7 million Göksu - 4H (Horizontal, 1,600’ lateral) • Cost: $3.5 million; Current cum. pr

  7. Slide 7: Molla Hazro and Bedinan Formations Overview

    Overview • Conventional Permian and Ordovician sandstone targets immediately above and below Dadaş (Silurian – Woodford) • Arpatepe discovery in 2008 • Arpatepe - 1 vertical well has produced > 300 Mbo in five years • Drilled Bahar discovery in 2012 from 2D seismic • Bahar - 1 vertical well has prod

  8. Slide 8: Bahar Field: 2D Seismic

    BAHAR FIELD: 2D SEISMIC 8 Bahar - 1 Mardin Hazro Bedinan 1990s Vintage 2D Utilized to Pick Bahar - 1 and Bahar - 2 Locations

  9. Slide 9: Bahar Field: 2D Seismic

    BAHAR FIELD: 2D SEISMIC 9 P ı nar - 1 Çatak - 1 Bahar - 1 Mardin Hazro Bedinan 2,167 m / 7,110 ft 3,976 m / 13,045 ft 2012 2D Utilized to Pick Çatak - 1 Location and Identify P ı nar Structure

  10. Slide 10: Bahar Field: Improved Mapping with 3D Seismic

    BAHAR FIELD: IMPROVED MAPPING WITH 3D SEISMIC 10

  11. Slide 11: More Opportunity!

    MORE OPPORTUNITY! TRANSATLANTIC at

  12. Slide 12: Even More Opportunity!

    EVEN MORE OPPORTUNITY! 12 Each structure must be mapped in detail over the next few months. Some or many structures may fail, but the clarity with which we can map is greatly improved.

  13. Slide 13: Bahar Field: Bedinan Timeslice Through Seismic

    BAHAR FIELD: BEDINAN TIMESLICE HORIZONTALLY THROUGH SEISMIC @ 1.534 SECONDS 13

  14. Slide 14: Bahar Field: Bedinan Zone Delineation

    Bedinan Formation Looks Radically Different With New 3D Seismic Data BAHAR FIELD: BEDINAN ZONE DELINEATION 14 Bahar - 1 Bahar - 2 Bahar - 1 Bahar - 2 Bahar Structure Map from 2012 2D Seismic Bahar Structure Map from 2013 3D Seismic Assumes 71 - acre spacing Ç atak - 1

  15. Slide 15: Bahar - Bedinan Targets

    BAHAR - 1 BEDINAN TARGETS 15 Dadaş 1 Oil & gas shows Bedinan H1 Sand 600 Bbl/d – Bahar - 1 Cored – Ç atak - 1 Gamma Ray Porosity Resistivity Pay Indicator Hydrocarbon Type Lithology Limestone Shale Sandstone

  16. Slide 16: Bahar - Hazro Targets

    BAHAR - 1 HAZRO TARGETS 16 150 Bbl/d – Bahar - 1 170 Bbl/d – Bahar - 2 Cored – Çatak - 1 Gamma Ray Porosity Resistivity Pay Indicator Hydrocarbon Type Lithology Limestone Shale Sandstone

  17. Slide 17: Şelmo Field Horizontal Program

    ŞELMO FIELD HORIZONTAL PROGRAM 17 13 13H1 36H 64H 58 39H Denotes LSD target Denotes MSD target 92 2H N30 W54 E 54 35H1 35H2 W35 87H 22H1 22H2 Horizontal Wells Designed Through January 2014

  18. Slide 18: Şelmo Field Production

    ŞELMO FIELD PRODUCTION 18 0 1000 2000 3000 4000 5000 6000 1/1/13 4/11/13 7/20/13 10/28/13 2/5/14 5/16/14 BOPD Şelmo Field Daily Production 13H 22H2 phase 1 22H1 22H2 2H1 36H1 84H 86H 92H 85H 64H 39H Expected New Wells New wells assume initial production rate of 200 BOPD each.

  19. Slide 19: Bulgaria Update

    BULGARIA UPDATE 19 Current Plans Achieved Target Depth on Decentci - R2 in January 2014 • Good gas shows through 16 + # mud • Currently moving rig and preparing to test well • Expect to test open hole section in next 2 weeks, followed by cased hole zones; total test time 30 - 90 days • If successful

  20. Slide 20: Bulgaria Composite Log

    BULGARIA COMPOSITE LOG TRANSATLANTIC

  21. Slide 21: Summary

    SUMMARY • Three - part strategy in Turkey to monetize asset • Delivered 24% production growth in 2H 2013; guided 20 - 25% production growth in 2014 • Expert team in place to execute capital plan • Capital deployed on projects with highest yields 21

  22. Slide 22: Contact Information

    CONTACT INFORMATION Taylor B. Miele Director of Investor Relations (214) 265 - 4746 taylor.miele@tapcor.com Wil F. Saqueton VP - Chief Financial Officer (214) 265 - 4743 wil.saqueton@tapcor.com Ian J. Delahunty President (214) 265 - 4780 i an.delahunty@tapcor.com 22

  23. Slide 23: TransAtlantic Board of Directors

    TRANSATLANTIC BOARD OF DIRECTORS 23 Name Select Experience Malone Mitchell 3 rd Chairman & CEO of TransAtlantic Petroleum, Founder and former President & COO of Riata Energy (SandRidge Energy), Founder, Partner and Managing Member of Riata Corporate Group (Longfellow Energy, Dalea Partners, Viking I

  24. Slide 24: TransAtlantic Technical Team

    TRANSATLANTIC TECHNICAL TEAM 24 Name Position Select Experience Darcy Dorscher Vice President, Production International E&P experience in the Former Soviet Union , Kazakhstan, Qatar, India, Turkey and Madagascar Mitch Whatley Vice President, Drilling Pioneer Natural Resources: Eagle Ford shale drill

  25. Slide 25: Operating and Financial Highlights

    OPERATING AND FINANCIAL HIGHLIGHTS 25 Results for three months ended: 9/30/2013 6/30/2013 9/30/2012 Net p roduction Oil (BBLD) Natural Gas (MCFD) BOED % Oil 2,500 9,435 4,076 61% 2,527 8,967 4,022 63% 2,489 10,087 4,174 60% Prices, unhedged Oil (BBL) Natural Gas (MCF) $103.04 9.16 $94.13 9.57 $105.8

  26. Slide 26: Reserves Potential

    Reserves Volumes as of 12/31/2012 (MMBoe) Field Proved (1P) 1P + Probable ( 2P) 1P + 2P + Possible ( 3P) Selmo 7.2 10.8 24.4 Thrace 1.9 4.0 21.4 Molla 1.8 5.5 6.8 Other 0.7 1.3 1.6 Total 11.6 21.6 54.2 PV - 10 ($MM) $564 $1,040 $2,198 Standardized Measure ($MM) $479 RESERVES POTENTIAL 26 Drilling ri

  27. Slide 27: EBITDAX Reconciliation

    EBITDAX RECONCILIATION 27 $US millions For the three months ended: 9/30/2013 6/30/2013 9/30/2012 Net income from continuing operations $(4.8) $2.9 $0.5 Less : Interest and other, net 0.7 0.7 0.1 Income tax expense 0.1 0.2 1.7 Exploration, abandonment, and impairment 2.2 11.9 2.1 Seismic 5.0 1.0 1.8

  28. Slide 28: PV-10 Reconciliation

    PV - 10 RECONCILIATION 28 The PV - 10 value of the estimated future net revenue are not intended to represent the current market value of the estimated oil and natural gas reserves we own. Management believes that the presentation of PV - 10, while not a financial measure in accordance with U.S. GAA

TransAtlantic Petroleum — Corporate Update (February 2014) on 6ix