Granite Construction Incorporated · NYSE:GVA

Granite Construction — Investor Day (2005)

22 slides from Granite Construction's investor day presentation, 2005

  1. Slide 1: 2005 Analyst Day: A look at Risk from the Field

    Granite Construction Incorporated 2005 ANALYST DAY A look at Risk from the Field - Why we do what we do Mike Donnino Sr. Vice President & Heavy Construction Division Manager

  2. Slide 2: Forward-Looking Disclaimer

    Forward-Looking Disclaimer The following presentation contains forward-looking statements regarding the outlook for our business. Forward-looking statements may be identified by the use of words like "plan," "expect," "aim", "believe," "project," "anticipate," "intend," "estimate," "will," "should,"

  3. Slide 3: Project Risk vs. Opportunity

    Project Risk vs. Opportunity Hathaway Bridge, Panama City, FL

  4. Slide 4: Finding Jobs to Bid

    Opportunity ƒ Finding Jobs to Bid – Agency Letting Schedules – Services (Amtech, CMD, Dodge Report) – Business Development – Invitations – Engineering Firms

  5. Slide 5: Choosing the right opportunity to bid

    Choosing the right opportunity to bid depends on many factors. ƒ Current backlog ƒ Owner & history with Owner ƒ Mix of current backlog ƒ Expected number of ƒ Size of project bidders ƒ Type of project ƒ Type of contract (I.e. unit price, lump sum, ƒ History on similar etc) work ƒ Expected Cash Flow

  6. Slide 6: Ideal Bid Opportunity

    Ideal Bid Opportunity ƒ > $50,000,000 ƒ 2 – 4 Bidders ƒ Complex ƒ Large schedule implications ƒ Lots of upside potential ƒ Distinct advantages ƒ Familiar Owner SH190/IH35E, Carrolton, TX

  7. Slide 7: Projects we try to avoid

    Projects we try to avoid ƒ More than 6 Bidders ƒ < $25,000,000 ƒ Straight forward ƒ New or Private Owner ƒ Unfamiliar with type of work ƒ Unacceptable contract language

  8. Slide 8: How does Risk affect our choice?

    How does Risk affect our choice ? We price it like everything else !

  9. Slide 9: Preparing Bids

    Preparing Bids Waters Ridge, Lewisville, TX

  10. Slide 10: Project Bid Timeline

    Project Bid Timeline ƒ Order plans and ƒ Methods meeting specs ƒ Site Investigation ƒ Bid item assignments – Site visits ƒ Preliminary take-off – Test digs ƒ Preliminary Design – Material Testing (DB only)

  11. Slide 11: Project Bid Timeline

    Project Bid Timeline ƒ RFQ (if required) ƒ Prepare Estimate ƒ Prepare project schedule ƒ Methods meeting ƒ Bid review ƒ Final adjustments & Bid closing

  12. Slide 12: Project Bid Timeline

    Project Bid Timeline ƒ Final adjustments & Bid closing – Equipment – Rentals, Fuel, Ownership – Insurance – WC, GL, BR – Escalations – Labor, Equipment – Subcontractor & supplier quotes – Risk SH 130 (proposal), Austin, TX

  13. Slide 13: Sub's & supplier Comparisons

    Sub’s & supplier Comparisons ƒ Price – More competitive – Less risk – Less control ƒ Schedule ƒ Bonding ƒ Past performance

  14. Slide 14: Risk

    Risk ƒ Schedule – Weather, Liquidated Damages, number of crews, etc. ƒ Mix of work – Labor & Equipment versus Material & subcontractors) ƒ Type of work ƒ Other Table Rock Dam, Branson, MO

  15. Slide 15: Managing Risk

    Managing Risk Ft Smith Dam, Ft Smith Arkansas

  16. Slide 16: Post Award Risk Management

    Post Award Risk Management ƒ Partnering ƒ Pre-construction meetings – Owner – Project Team ƒ Annual Project Safety Plans ƒ Job Hazard Analysis (JHA’s) ƒ Take 5 for Safety ƒ Daily game plans ƒ Weekly meetings ƒ Weekly & monthly reports Big Brown RR, Fairfield, TX

  17. Slide 17: Sr. Management Review

    Sr. Management Review US 75 –S1, Dallas, TX ƒ Bid lists ƒ Bid Reviews ƒ Monthly Impact Analysis ƒ Quarterly Cost/Revenue Forecasts ƒ Division Results Review

  18. Slide 18: Looking Ahead...

    Looking Ahead... e@@ GRANITE 2005

  19. Slide 19: HCD's Strategic Plan

    HCD’s Strategic Plan Mission Statement Expand HCD’s position as a Nationally Recognized Quality Builder Delivering Quality Projects while Maintaining a Commitment to Employee Development and Our Core Values Imperatives 1. Regional Diversification Dictated by Market 2. Attract, Develop, Reward & Reta

  20. Slide 20: HCD Business Outlook

    HCD Business Outlook ƒ Increased Federal Funding – More Bread & Butter DOT projects – More Mass Transit & Light Rail Projects ƒ Projects of Interest $100 mil - $500 mil range – IH35/IH694 (NPR) $120 mil – LA Exposition LRT (NPR) - $430 mil – St Francisville Bridge (NPR) - $200 mil – RT 52, New Jerse

  21. Slide 21: HCD Business Outlook

    HCD Business Outlook ƒ Projects of Interest $100 mil - $500 mil range: – Washington Bypass, NC (SE) –$170 mil – DART LRT (TX) –$300 mil – I-64, St Louis (NPR) - $400 mil – NYDOT Tappen Zee Bridge Deck Replacement $150mil – NJT Tonnelly Ave to Meadowlands LRT $175mil ƒ Several Mega-projects in the pi

  22. Slide 22: Questions?

    Questions ? US 75 – S2, Dallas TX

Granite Construction — Investor Day (2005) on 6ix