Troubadour Resources, Inc. · TSXV:TR

Troubadour Resources — Investor Presentation (July 2018)

15 slides from Troubadour Resources's investor presentation, July 2018

  1. Slide 1: Amarillo Copper Project

    Amarillo Copper Project Southwestern BC

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements Investors are cautioned that, except for statements of historical fact certain information contained in this document includes “forward- looking information”, with respect to performance expectation for Troubadour. Such forward-looking statements or information, including

  3. Slide 3: Who We Are

    Who We Are Troubadour Resources Inc. is a private copper/gold explorer centered in one of Canada's The Company is managed by an most prolific copper belts. aggressive team consisting of youthful and seasoned professionals with proven track records as mine finders. Listed TSX Venture Stock Exchange i

  4. Slide 4: Why Invest?

    Amarillo Project – Heart of Positive Copper Market Outlook Copper Mine Country • Troubadour's Amarillo Property is  Copper is rebounding after hitting a 5 year strategically located in close low proximity to major low cost copper  The Chinese economy has a significant effect producers which gives

  5. Slide 5: Management and Directors

    Management and Directors Experienced and Seasoned Management Teamed with Youthful Entrepreneurs and Professionals Mike Sieb Alastair Brownlow, Director CPA, CA CFO Geoff Schellenberg President and Director Paul Chung Gary Schellenberg CEO, Chairman and Director Director

  6. Slide 6: Amarillo Project Location

    Amarillo Project Location • Consists of 7 mineral claims covering 4,178 hectares. • Located 30 kilometres west of Peachland • Access is along the Peachland FSR logging road from Highway 97

  7. Slide 7: Neighbour to World-Class Current and Past Producing Mining Operations

    Neighbour to World- Class Current and Past Producing Mining Operations Prolific Mining Camp

  8. Slide 8: Field Work Completed to Date

    Field Work Completed to Date • 38.9KM of Induced Polarization (IP) survey (results pending) •848 soil samples covering high priority exploration areas • 39.5KM Ground Magnetometer Survey was completed to confirm the large 6km x 2km regional magnetic low identified on a high altitude government aerom

  9. Slide 9: Extensive Soil Geochemical Anomalies

    Extensive Soil Geochemical Anomalies • The multi-element signature of the Amarillo Project area is consistent with a large multi-phase mineralizing system • Acutely similar to some of the neighbouring Three Major world-class mining Exploration operations Targets *Trench Data Source: Philip, R.H.D. 1

  10. Slide 10: Primary Target

    Primary Target Porphyry Copper Deposit • Troubadour Geological Team believes they have rediscovered historic ‘lost’ trench • Soil geochemistry anomaly is coincident with magnetic and structural trend • 4 km long copper soil anomaly consistent with a large porphyry target *Trench Data Source: Philip,

  11. Slide 11: Second Target

    Second Target Copper Rich Skarn Deposit • Increased the tungsten soil anomaly to 4km long by 3km wide through new sampling • Tunsten anomaly is closely coincident with magnetic high • Large or multiple Skarn targets 11

  12. Slide 12: Third Target

    Third Target High-Grade Gold & Silver Veins  Pb-Zn-Ag soil anomaly parallel to Cu anomaly trend, which is coincident with magnetic low vein target  Troubadour Geological Team samples 1.55 g/t Au and 31.9 g/t Ag from grab sample* taken from subcrop *The surface rock grab sample reported above was s

  13. Slide 13: 2018 Proposed Work Programs

    2018 Proposed Work Programs • Further drill target generation and definition including geochemical sampling, geological mapping and prospecting • Follow-Up Induced Polarization Survey to Expand on Targets Identified in Initial IP Program – Results Pending • Minimum 2,000m diamond drill program plann

  14. Slide 14: Share Capital

    Share Capital Issued and Outstanding : 16,670,100 Warrants: Expiry December 30, 2018 1,325,000 @ $0.12 Expiry September 30, 2019 782,600 @ $0.15 Expiry December 19, 2019 7,447,020 @ $0.15 Expiry January 23, 2020 1,123,500 @ $0.15 Expiry February 6, 2020 329,800 @ $0.15 Full Diluted: 27,678,020 www.t

  15. Slide 15: Amarillo Copper Project Early Investment Opportunity

    Amarillo Copper Project Early Investment Opportunity To contact us for more information: Suite 488- 625 Howe Street Vancouver, B.C. V6C 2T6 T:604.681.0221 TF: 1.800.667.4470 info@troubadourresources.com

Troubadour Resources — Investor Presentation (July 2018) on 6ix