Net Power Inc. · NYSE:NPWR

Net Power — Q2 2024 Earnings Presentation

13 slides from Net Power's earnings presentation, Aug 13, 2024

  1. Slide 1: Second Quarter 2024 Results

    Second Quarter 2024 Results August 12, 2024 1

  2. Slide 2: Important Notice

    Important Notice Cautionary Note Regarding Forward-Looking Statements and Projections. Certain statements in this presentation may constitute “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, Section 21E of the Securities Exchange Act of 1934 and the Priva

  3. Slide 3: Overview

    Overview Danny Rice, Chief Executive Officer

  4. Slide 4: NET Power delivers the Energy Trifecta

    NET Power delivers the Energy Trifecta CLEAN RELIABLE AFFORDABLE High carbon capture capacity 24 hours/day, 7 days/week Competitive power production 97%+ inherent carbon capture Baseload, dispatchable, and peaking State-of-the-art modularized standard generating pipeline-ready CO2 capabilities compl

  5. Slide 5: Three-Pillar Strategy to Create Shareholder Value

    1 Develop and Prove the Technology at the Utility Scale  Progress equipment development program with Baker Hughes  Complete Front-End Engineering and Design (FEED)  Secure equipment partnerships, supply and offtake agreements, and necessary capital  Construct and operate with focus on clean, rel

  6. Slide 6: 2024 Milestones

    Commence Baker Hughes Equipment Validation at La Porte Complete Project Permian Front-End Engineering and Design (FEED) 2024 Milestones Finalize Long-Term Air Separation Unit Partnership Advance NPWR Origination Projects

  7. Slide 7: North America Origination – Setting the Stage for Valuable Future Deployments

    North America Origination – Setting the Stage for Valuable Future Deployments North American TAM (1) = 800-1,000 NPWR Plants between 2028-2040 Midcontinent (MISO) Load growth, carbon storage projects Alberta, Canada (AESO) across states, datacenter demand Supportive carbon capture policy NPWR (OP1):

  8. Slide 8: Operational Updates

    Operational Updates Brian Allen, President and Chief Operating Officer

  9. Slide 9: La Porte validation will de-risk and optimize the first utility-scale plant

    On Track for Phase 1 Baker Hughes Testing in Q4 2024 La Porte validation will de-risk and optimize the first utility-scale plant Validation Phases Expected Phase Timing Phase 1: Oxy-Fuel Burner Configurations • Test multiple burners configurations in a dedicated test rig • Result: ignite and detect

  10. Slide 10: First Phase of Baker Hughes Equipment Validation Expected to Start in Q4 2024

    First Phase of Baker Hughes Equipment Validation Expected to Start in Q4 2024 Finalizing La Porte Preparations • Ongoing activities related to inspections, motor runs and preventative maintenance on all major components • Installation of piping and instrumentation continues per schedule • Ongoing wo

  11. Slide 11: Progressing Project Permian

    Progressing Project Permian Recent Updates Upcoming: Q3 – Q4 2024 Signed Limited Notice to Proceed (LNTP) with Baker  Completion of FEED Hughes to release all long-lead materials required to meet schedule for utility-scale turboexpander  Standard inside battery limits (ISBL) / site-specific outsid

  12. Slide 12: Financial Updates

    Financial Updates Akash Patel, Chief Financial Officer

  13. Slide 13: Q2 2024 Financial Updates

    Q2 2024 Financial Updates Continued Prudent Deployment of Capital Cash and Investments Breakdown Q2 Q1 Change  Total cash and investments of ~$609mm as of (in $mm) 2024 2024 (Q2 vs. Q1) 6/30/2024 (1)(2) Cash and cash equivalents $405 $429  Total quarter-over-quarter change in cash & investments of