Fluence Energy, Inc. · NASDAQ:FLNC

Fluence Energy — IEA, May 2025

8 slides from Fluence Energy's conference presentation, May 2025

  1. Slide 1: Energy Storage as an opportunity for securing resource adequacy

    I E A , M AY 2 0 2 5 , L A R S S T E P H A N Energy Storage as an opportunity for securing resource adequacy

  2. Slide 2: Transform the way we power our world

    OUR MISSION ENERGY STORAGE SOLUTIONS (1) 38 260 Transform the TOTAL GWh PROJECTS way we power SERVICES (2) our world to 9 create a more TOTAL GW sustainable OPTIMIZATION SOFTWARE (2) future. MOSAIC NISPERA 14+ 18+ GW OF AI-OPTIMIZED GW OF RENEWABLE AND BIDDING OF RENEWABLES STORAGE ASSETS UNDER PURP

  3. Slide 3: The Global Energy Storage Opportunity

    The Global Energy Storage Opportunity GLOBAL STORAGE DEPLOYMENT ROLL OF ENERGY STORAGE TO GROW BY FACTOR 18 BY 2030 GERMANY POWER SYSTEM IN 2030 Hellbrise Dunkelflaute !!! Only 10-15 % of battery cells produced go ? into stationary energy storage!!! Source: IEA © Fluence Energy, LLC. All rights rese

  4. Slide 4: The Role of Energy Storage During a "Dunkelflaute"

    The Role of Energy Storage During a “Dunkelflaute” GERMANY POWER SYSTEM DURING DUNKELFLAUTE IN 2030 Limited Energy Resources Unlimited Energy Residual load Resources ? Source: Agora Energiewende Source: Aurora © Fluence Energy, LLC. All rights reserved. | 4

  5. Slide 5: Capacity Market Design Considerations for Energy Storage

    Capacity Market Design Considerations for Energy Storage DURATION OF CAPACITY SHORTAGE CONTRIBUTION OF STORAGE DURING EVENTS CAPACITY SHORTAGE EVENTS National Grid ESO Resource Adequacy Study GB CM market in practice Since 2016 UK ISO published 15 Capacity Market Notices - all for 30 min window - an

  6. Slide 6: Energy Storage in European Capacity Markets - a Matter of Market Design?

    Energy Storage in European Capacity Markets - a Matter of Market Design? ENERGY STORAGE IS DELIVERY RESOURCE BUT CAPACITY MARKET DESIGN MATTERS ADEQUACY ACROSS EUROPE VIA CMS – GERMAN EXAMPLE In 2024 German government consulted four Openness to innovation potential market designs: 1) Resource Adequa

  7. Slide 7: Key Takeaways

    Key Takeaways Let’s leverage flexibility assets for resource adequacy Flexibility options will grow exponentially going forward BESS acts as price taker in CM auctions, lowering cost of resource adequacy Market design for energy-limited resources in Capacity Markets is key Bad CM market design can h

  8. Slide 8: Thank You

    LARS STEPHAN DIRECTOR MARKETING, POLICY AND PUBLIC AFFAIRS (EMEA) MOBILE: +49 152 28802296 E - M A I L : L A R S . S T E P H A N @ F L U E N C E E N E R G Y.C O M Thank You © Fluence Energy, LLC. All rights reserved. |8 PT-001-04-EN

Fluence Energy — IEA, May 2025 on 6ix