Hastings Technology Metals Limited · ASX:HAS

Hastings Technology Metals — 121 Hong Kong Conference 2017

38 slides from Hastings Technology Metals's conference presentation, March 2017

  1. Slide 1: Hastings Technology Metals - Future Supplier of Rare Earths to Permanent Magnet Industry

    HASTINGS TECHNOLOGY METALS LTD (ASX Listed Stock Code: HAS) Future Supplier of Rare Earths to Permanent Magnet Industry 121 Hong Kong - Investor Presentation March 2017 Brockman Yangibana

  2. Slide 2: Disclaimer

    Disclaimer All currency amounts are in A$ unless stated otherwise. Disclaimer This presentation has been prepared by Hastings Technology Metals Limited (“Company”). It does not purport to contain all the information that a prospective investor may require in connection with any potential investment

  3. Slide 3: Overview of Hastings Technology Metals

    Overview of Hastings Technology Metals • Hastings Technology Metals – from its Yangibana tenement located in the Gascoyne, WA, is developing a mine to produce Neodymium (Nd) , Praseodymium (Pr) and other Rare Earth Oxides. • Nd and Pr are the critical elements in next-generation technologies e.g. wi

  4. Slide 4: The Hastings Team

    The Hastings Team 4

  5. Slide 5: Experienced Board & Management

    Experienced Board & Management Charles Lew Tony Ho Jean Claude Steinmetz Executive Chairman Non Executive Director & Chair of Audit Non Executive Director • Private investor and entrepreneur Committee • Previously Chief Operating Officer for Lynas • MD of ABN Amro Investment Bank Singapore • Directo

  6. Slide 6: Management Team

    Management Team Charles Tan Guy Robertson Chief Operating Officer Chief Financial Officer & Company Secretary • 20+ years in Commercial, • 25+ years CFO experience Procurement, Outsourcing & Supply Chain Management with MNCs • Former senior finance executive with Jardine Lloyd Thompson, Colliers, Fr

  7. Slide 7: Specialised Technical Team

    Specialised Technical Team Dr Kwan Wong Narelle Marriott KYSPYmet Mineral Processing Consultants Principal Engineer – Beneficiation Flotation Specialist • 14+ years experience in the minerals processing • 50+ years practicing metallurgist and mining industry • Possesses extensive flotation treatment

  8. Slide 8: Yangibana

    Yangibana 8

  9. Slide 9: Yangibana: Located in Central Western Australia

    Yangibana : Located in Central Western Australia • Situated 280 km north-east of Carnarvon • Yangibana site covers total area of ~650 km2 BROCKMAN Yangibana 9

  10. Slide 10: Yangibana: Mining Leases Granted

    Yangibana : Mining Leases Granted Mining Leases Granted (shaded in red & blue) with tenure of 20 years and no Native Title claims covering 90% of JORC Resource area measuring only ~50sqkm out of 650sqkm Miscellaneous and General Purpose Leases granted Application to authorities for permit to commenc

  11. Slide 11: Yangibana: JORC resource update 2017

    Yangibana : JORC resource update 2017 Total Yangibana JORC Resources Category Tonnes Nd2O3+Pr2O3 TREO Nd2O3 Pr2O3 • Jan 2017 updated Resource estimate Measured 2,155,000 % 0.42 % 1.01 ppm 3,410 Ppm 770 which includes first Measured Resource Indicated Inferred 5,446,000 5,807,000 0.41 0.36 1.30 1.12

  12. Slide 12: Recent Airborne Surveys and Drilling Results – ASX Releases

    Recent Airborne Surveys and Drilling Results – ASX Releases* • Infill drilling at Fraser’s return very encouraging intersections (6 Oct) • Airborne survey identified additional 22 priority areas of significant exploration interest (18 Oct) • Fraser’s Southwest Deposit drill results with grades as hi

  13. Slide 13: Yangibana: Open Pit Mining on Flat Terrain

    Yangibana : Open Pit Mining on Flat Terrain • 4 key rare earths: (1) Neodymium – Nd; (2) Praseodymium – Pr; (3) Dysprosium - Dy and (4) Terbium - Tb • Nd & Pr account for approx. 83% of in-ground value • Two significant aquifers in mineralised ground 13

  14. Slide 14: The Market for Rare Earths and Permanent Magnets

    The Market for Rare Earths and Permanent Magnets 14

  15. Slide 15: Some End Uses for Magnets' Rare Earth

    Some End Uses for Magnets’ Rare Earth Focus on production of rare earths for permanent magnet industry; i.e.. Nd, Pr and Dy due to strong future demand for Electric Vehicles, wind turbines, domestic appliances, industrial robotics, digital devices, etc. 15

  16. Slide 16: Rare Earth Used in a Mobile Phone

    Rare Earth Used in a Mobile Phone 16 Source: Apple, Venturebeat.com

  17. Slide 17: Facts in Perspective

    Facts in Perspective • World wide sales of mobile phones by 2014 ~7.3B sales • Approx. 0.1g of Nd/Pr per phone => 730 tonnes per annum • Renewable Energy - wind turbine adds to demand for NdFeB magnets (permanent magnets) • Each 2MW wind turbine contains 340-420kg REE • Each HEV contains about 2.7kg

  18. Slide 18: Rare Earth Metals in an Electric Vehicle

    Rare Earth Metals in an Electric Vehicle 18

  19. Slide 19: NdFeB Permanent Magnets in comparison

    NdFeB Permanent Magnets in comparison § NdFeB (Neodymium, Iron, Boron Magnet) - strongest permanent magnet commercially available § ~10 times more powerful, and 3 times lighter than traditional ferrite magnet è Superior performance, miniaturisation, compact, lightweight and more efficient § Synchron

  20. Slide 20: New Technologies using Permanent Magnets

    New Technologies using Permanent Magnets • PVC stabilizers – Protect PVC from thermal degradation and exposure to heat and UV rays (Mostly La & Ce). Additional demand 14,000 tonnes by 2025. • Magneto caloric Refrigeration – 30% to 50% more energy efficient, zero CFC usage. (Mostly Nd-Pr & Gd). Addit

  21. Slide 21: RE market outlook – green technology driving Nd/Pr demand growth

    RE market outlook – green technology driving Nd/Pr demand growth Roskills Intel 21

  22. Slide 22: Recovery in Rare Earths Prices in 2017

    Recovery in Rare Earths Prices in 2017 • Rare Earths prices have improved in 2017, both onshore China and in international markets • China F.o.B. prices for Nd +16.8% YTD • China F.o.B. prices for Pr +13.4% YTD • Even La and Ce prices recovered, +8.6% & +11.7% respectively • Stringent crackdown in C

  23. Slide 23: The Yangibana Advantage

    The Yangibana Advantage 23

  24. Slide 24: Exceptional High Content Nd and Pr

    Exceptional High Content Nd and Pr Comparison of REO Distribution & Basket Value Between Hastings and Major Light RE Producers China Outside of China RE Oxide/TREO Unit Hastings Ø Yangibana’s Rare Earths Producer 1 Producer 2 Producer 1 Producer 2 distribution is the best light Lanthanum % 9.99 25.9

  25. Slide 25: Estimated OPEX – work in progress

    Estimated OPEX – work in progress Assumes 2nd year of production and 8,500 tonnes TREO • OPEX refinement underway AUD m as part of DFS* Mining Costs – based on 1m tons p.a. mined 31.5 • Mining costs from Reagents - Beneficiation 16.8 Snowdens estimates Reagents - Hydromet 21.7 • Reagent costs from c

  26. Slide 26: CAPEX (WIP) – Procurement/Sourcing Strategy

    CAPEX (WIP) – Procurement/Sourcing Strategy Direct CAPEX: estimate ~A$246m 1. Global sourcing of major capital equipment results in average savings of 25% to 30% compared to PFS. • Mills/Crushers/Screens • Sulphuric Acid Plant • Rotary Kilns • Lime Slaking 2. Utilising foreign equipment manufacturer

  27. Slide 27: Rationale for Yangibana's competitive advantage

    Rationale for Yangibana’s competitive advantage Yangibana’s profitability is due to: • Highest basket price due to high Nd-Pr content in ore body • High recovery rates of RE Oxides: +70% relative to TREO in the ground • Experienced Management Team – ex-Lynas with good experience and know how in RE p

  28. Slide 28: Process Flow: Beneficiation and Hydrometallurgy

    Process Flow Beneficiation Hydrometallurgy 28

  29. Slide 29: Yangibana: Toll Treatment Route

    Yangibana : Toll Treatment Route Toll Treat 29

  30. Slide 30: Yangibana: Mine and Production Development Plan

    Yangibana : Mine and Production Development Plan The path to production in 2019: FY15 FY16 FY17 FY18 FY19 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Pre- Feasibility Study Completed Definitive Feasibility Study In Progress Production Plan Evaluation In Progress Pilot Plant - Benefic

  31. Slide 31: Completed Beneficiation Piloting – March 2017

    Completed Beneficiation Piloting – March 2017 • Successful completion of pilot plant testing validating simple and effective Yangibana flotation process. • Piloting confirmed 70% TREO recovery and concentrate grade of 23% TREO. • Ongoing improvement to optimize floatation circuit chemistry with expe

  32. Slide 32: Milestones to Completion of DFS

    Milestones to Completion of DFS • Beneficiation Pilot Plant Test Completed Feb 2017 • HydroMet Pilot Plant Test Work Mar/Apr • Mining Proposal/Mine Rehab Plan Submission March • Production Process Optimization April • Prelim Plant Engineering Specification May/June • DFS Document Release to Public 3

  33. Slide 33: DFS – Production Concept – reducing size of plant

    DFS – Production Concept – reducing size of plant • Initial plan to mine 1m tons p.a, Capex is AUD350m and Opex is AUD175m. However;….. • DFS optimization process – analyze smaller production plant of 700,000 tons p.a mined = TREO 5,500 tons; • Capex reduced to ~AUD250m & Opex to ~AUD120m • Current

  34. Slide 34: Hastings Technology Metals Equity Statistics

    Hastings Technology Metals Equity Statistics 34

  35. Slide 35: Equity Funds Raised and Share Price Performance

    Equity Funds Raised (NO DEBT) HAS:AU - Share Price Performance 0.12 May 2014: Underwritten Rights Issue at 3.8c A$2.8m (Fund drilling program at Yangibana) 0.1 Jan 2015: Underwritten Share Placement @ 7c per share A$6.5m 0.08 Jan 2015: Underwritten Share Purchase Plan @ 7c per share A$2.0m Apr 2016:

  36. Slide 36: HAS – Current Shareholding Distribution

    HAS – Current Shareholding Distribution • YTD Performance +35.6% Hastings Price in AUD • 2017 increase in Total Shareholders by 29% 0.11 • Top 100 shareholders control 94% of shares with top 10 controlling 73%. 0.1 • Future Equity capital raise to partially fund 0.09 CAPEX will help increase daily t

  37. Slide 37: Summary

    Summary § Strong growth in demand for Permanent Magnets § Yangibana’s high basket price compared to most § Management’s ability to execute its business plan and control costs from start § Granted Mining Leases free of Native title claims over 90% of JORC resource § Non-China sustainable source of su

  38. Slide 38: Thank You Q&A

    THANK YOU Q&A 38

Hastings Technology Metals — 121 Hong Kong Conference 2017 on 6ix