Canadian Copper, Inc. · CSE:CCI

Canadian Copper — Investor Presentation (September 2025)

20 slides from Canadian Copper's investor presentation, September 2025

  1. Slide 1: Only Mine to Mill in New Brunswick

    CSE : CCI PRESENTATION DECK SEPTEMBER 2025 ONLY M INE TO MILL IN NEW BRUNSWICK P O S I T I O N I N G F O R N E A R -T E R M C O P P E R A N D Z I N C P R O D U C T I O N I N B AT H U R S T, N E W B R U N S W I C K , C A N A D A www.canadiancopper.com

  2. Slide 2: Disclaimer

    DISCLAIMER Forward-Looking Informa tion and Statements This presentation contains “forward-looking information” for purposes of applicable Canadian securities laws. Forward-looking The Caribou Mine historical mineral resource es timates were derived from the technical report titled “Technical Report

  3. Slide 3: Ownership, Financing & Capitalization

    CEO Equity Cost is $0.11/share +$500K Gross Invested to Date | 3.2X Yearly Salary CEO Ocean Partners OWNERSHIP, 5% 5% Nexa Resources FINANCING & 2% CAPITALIZATION 12% 12% Puma Exploration C A P I TA L ST R U C T U R E Retail 47% Share Price (C$) $0.18 Current S/O 102M Closely Held Average Volume 150

  4. Slide 4: Combined Strategy: Complementary Assets

    15 SE P TE MBE R 2025 COMBINED STRATEGY: COMPLEMENTARY ASSETS PROVEN LARGE DEPOSIT EXISTING PROCESS FACILITY N MURRAY BROOK DEPOSIT CARIBOU PLANT COMPLEX • 100% ownership; • 3,000 tpd C&M mill • Advanced 2019 Caribou • Admin building, lab, development Production power, water. • +21Mt @ 1.42% CuEq; 7

  5. Slide 5: Combined Strategy: June 2025 PEA Results

    15 SE P TE MBE R 2025 COMBINED STRATEGY: JUNE 2025 PEA RESULTS HIGH LIGHTS 13.2 year BASE CASE ASSUMPTIONS US$4.25/lb Cu | US$1.30/lb Zn US$27/oz Ag | US$1.10/lb Pb Mine Life PRE-TAX AFTER-TAX C$64 M C$265 M C$169 M Initial Capex NPV (7%) NPV (7%) 30 M lbs CuEq Or 41% 36% 98 M lbs ZnEq IRR IRR Avg.

  6. Slide 6: Estimate of Value: PEA and Trading Comparables

    15 SE P TE MBE R 2025 Estimate of Value: PEA and Trading Comparable’s Current Value: $0.16/Share ASSUMPTIONS P/NAV Average Scotia Mining: 0.56x C$169M P/NAV EV/EBITDA Average Scotia Mining: 4.8x (2027 E) P/NAV Range EV/EBITDA Range $0.27/share $1.16/share Low Low $0.93/share $1.63/share C$35M/A EV/E

  7. Slide 7: PEA Production Metrics

    15 SE P TE MBE R 2025 PEA PRODUCTION METRICS Costs Production Mine Life 13.2 years INITIAL CAPEX SUSTAINING CAPEX 30 M lbs CuEq Average Annual Production 98 M lbs ZnEq C$64M C$49M Avg. Annual Copper Production 8 M lbs Cu Avg. Annual Zinc Production 47 M lbs Zn Avg. Annual Silver Production 783 K oz

  8. Slide 8: Path to Development

    PATH TO DEVELOPMENT Activity Q4 2026 2027 2028 Complete Financing Close Caribou Transaction Metallurgical Drilling Metallurgical Program Complete Baseline Permitting Identify Design Gaps: PFS or FS Review Submit EIA Commence Engineering and Site Works EIA Approval Submit Construction Permits Approva

  9. Slide 9: Proposed Access Roads

    15 SE P TE MBE R 2025 PROPOSED ACCESS ROADS Provincial Highway Route #180 • Both previously disturbed sites • Sites connected by Crown Land • Town of Bathurst ~ 31 minutes by Car • Development site entirely connected by Provincial Highway Route #180 9

  10. Slide 10: Combined Strategy Flowsheet

    15 SE P TE MBE R 2025 COMBINED HAUL TRUCK PRIMARY VIBRATING SCREEN SECONDARY CYCLONE CLUSTER STRATEGY BATTERY BULK LIMIT ROUGHER CRUSHER FEED HOPPER BULK BULK AND VIBRATING FEEDER CRUSHED ORE SCAVENGER CONDITIONING CONVEYOR 3 SAG MILL TANK FLOWSHEET CRUSHED ORE BALL MILL 1 BALL MILL 2 PORTABLE JAW C

  11. Slide 11: Murray Brook Is Key to Caribou Increasing Throughput

    MURRAY BROOK IS KEY TO CARIBOU INCREASING THROUGHPUT Caribou Operation 2018-2019 Murray Brook Proposed Design 2,5001 tpd 3,300 tpd @ @ $35/t1 processed $31/t 1 processed MURRAY BROOK DEPOSIT – Only 10km away • UG ore delivery challenges increased costs • OP ore delivery reliable and reduces FX costs

  12. Slide 12: Caribou Horizon Trend Consolidation

    CARIBOU HORIZON TREND CON SOLIDATION Canadian Copper Property is 18km Connects two Former Producing Operations Underexplored with +30 Years Historical Production 5 km from Highway #180 Caribou Mine Murray Brook West Produced +700Mlbs of Zinc, Lead, and Silver Project • 2,790 hectares We are • Highly

  13. Slide 13: Murray Brook Deposit Defining Further Extensions

    MURRAY BROOK DEPOSIT DEFINING FURTHER EXTENSIONS MB2019-02 MB2018-03 MB2012-65 0.82%Cu ov er 34.0m 0.79%Cu, 2.95% Pb-Zn, 0.81%Cu, 2.20% Pb-Zn, 33 g/t Incl. 1.42%Cu, 0.15g/t 29 g/t Ag ove r 99.6m Ag, 0.55 g/t Au over 81.8m Au over 16.3m Incl. 3.04% over 19.0m Incl. 4.07% over 11.0m • 3000m drill prog

  14. Slide 14: MOU with Pabineau First Nation

    15 SE P TE MBE R 2025 MOU WITH PABINEAU FIRST NATION October 8th , 2024: Canadian Copper signed a non-binding Memorandum of Understanding with Pabineau First Nation The MOU aims to foster Creates mutual benefits, Pabineau First Nation open communication and including job creation, provides local lan

  15. Slide 15: Management Team / Board of Directors

    CSE: CCI MANAGEMENT TEAM BOARD OF DIRECTORS SIM ON QUICK | CEO & DIREC TOR ANDREW ELINESKY | DIRECTOR Mr. Quick has more than 14 years as a well-regarded mining As a finance professional, Mr. Elinesky brings over 20 years of experience as a CFO and leader, spanning the USA, Mexico, Argentina, and Ca

  16. Slide 16: Thank You

    THANK YOU Simon Quick Chief Executive Officer simon@canadiancopper.com 905.220.6661 16

  17. Slide 17: Appendix A: 2023 Mineral Resource

    APPENDIX A: 2023 MINERAL RESOURCE 1 1 US metal prices $4.00/lb Cu, $1.25/lb Zn, $0.95/lb Pb, and $23/oz Ag at $0.76 USD/CAD. 17 1 Process recoveries used were 80% Cu, 87% Zn, 75% Pb, and 90% Ag.

  18. Slide 18: Appendix B: Capital Cost

    15 SE P TE MBE R 2025 APPENDIX B: CAPITAL COST 1 SUSTAINING CAPEX CAPEX CARIBOU MILL PURCHASE $6 C$ 49M MINING - OTHER 29 WATER TREATMENT 0.2 PROCESS PLANT 7 Mining & Plan Equipment ON SITE 1 C$ 64M INFRASTRUCTURE Tailings Storage Facility INDIRECTS 6 Water Treatment plant PROJECT DELIVERY 4 OWNERS

  19. Slide 19: Appendix C: Site Layout

    15 SE P TE MBE R 2025 APPENDIX C: SITE LAYOUT 19

  20. Slide 20: Initial Capex (C$M) & After-Tax IRR (%)

    15 SE P TE MBE R 2025 INITIAL CAPEX (C$M) & AFTER-TAX IRR (%) $1,968 $1,347 $1,144 $1,082 67% 46% 46% 31% 38% 36% 29% 23% 25% 29% 22% 25% 25% 23% 20% 14% 13% 20% $653 $568 $493 $383 $220 $186 $181 $145 $142 $142 $81 $67 $64 $46 Berg Yellowhead North McIlvenna Pine Point Kwanika Kutcho Kudz Ze Carmac

Canadian Copper — Investor Presentation (September 2025) on 6ix