Slide 1: Only Mine to Mill in New Brunswick
CSE : CCI PRESENTATION DECK SEPTEMBER 2025 ONLY M INE TO MILL IN NEW BRUNSWICK P O S I T I O N I N G F O R N E A R -T E R M C O P P E R A N D Z I N C P R O D U C T I O N I N B AT H U R S T, N E W B R U N S W I C K , C A N A D A www.canadiancopper.com
Slide 2: Disclaimer
DISCLAIMER Forward-Looking Informa tion and Statements This presentation contains “forward-looking information” for purposes of applicable Canadian securities laws. Forward-looking The Caribou Mine historical mineral resource es timates were derived from the technical report titled “Technical Report
Slide 3: Ownership, Financing & Capitalization
CEO Equity Cost is $0.11/share +$500K Gross Invested to Date | 3.2X Yearly Salary CEO Ocean Partners OWNERSHIP, 5% 5% Nexa Resources FINANCING & 2% CAPITALIZATION 12% 12% Puma Exploration C A P I TA L ST R U C T U R E Retail 47% Share Price (C$) $0.18 Current S/O 102M Closely Held Average Volume 150
Slide 4: Combined Strategy: Complementary Assets
15 SE P TE MBE R 2025 COMBINED STRATEGY: COMPLEMENTARY ASSETS PROVEN LARGE DEPOSIT EXISTING PROCESS FACILITY N MURRAY BROOK DEPOSIT CARIBOU PLANT COMPLEX • 100% ownership; • 3,000 tpd C&M mill • Advanced 2019 Caribou • Admin building, lab, development Production power, water. • +21Mt @ 1.42% CuEq; 7
Slide 5: Combined Strategy: June 2025 PEA Results
15 SE P TE MBE R 2025 COMBINED STRATEGY: JUNE 2025 PEA RESULTS HIGH LIGHTS 13.2 year BASE CASE ASSUMPTIONS US$4.25/lb Cu | US$1.30/lb Zn US$27/oz Ag | US$1.10/lb Pb Mine Life PRE-TAX AFTER-TAX C$64 M C$265 M C$169 M Initial Capex NPV (7%) NPV (7%) 30 M lbs CuEq Or 41% 36% 98 M lbs ZnEq IRR IRR Avg.
Slide 6: Estimate of Value: PEA and Trading Comparables
15 SE P TE MBE R 2025 Estimate of Value: PEA and Trading Comparable’s Current Value: $0.16/Share ASSUMPTIONS P/NAV Average Scotia Mining: 0.56x C$169M P/NAV EV/EBITDA Average Scotia Mining: 4.8x (2027 E) P/NAV Range EV/EBITDA Range $0.27/share $1.16/share Low Low $0.93/share $1.63/share C$35M/A EV/E
Slide 7: PEA Production Metrics
15 SE P TE MBE R 2025 PEA PRODUCTION METRICS Costs Production Mine Life 13.2 years INITIAL CAPEX SUSTAINING CAPEX 30 M lbs CuEq Average Annual Production 98 M lbs ZnEq C$64M C$49M Avg. Annual Copper Production 8 M lbs Cu Avg. Annual Zinc Production 47 M lbs Zn Avg. Annual Silver Production 783 K oz
Slide 8: Path to Development
PATH TO DEVELOPMENT Activity Q4 2026 2027 2028 Complete Financing Close Caribou Transaction Metallurgical Drilling Metallurgical Program Complete Baseline Permitting Identify Design Gaps: PFS or FS Review Submit EIA Commence Engineering and Site Works EIA Approval Submit Construction Permits Approva
Slide 9: Proposed Access Roads
15 SE P TE MBE R 2025 PROPOSED ACCESS ROADS Provincial Highway Route #180 • Both previously disturbed sites • Sites connected by Crown Land • Town of Bathurst ~ 31 minutes by Car • Development site entirely connected by Provincial Highway Route #180 9
Slide 10: Combined Strategy Flowsheet
15 SE P TE MBE R 2025 COMBINED HAUL TRUCK PRIMARY VIBRATING SCREEN SECONDARY CYCLONE CLUSTER STRATEGY BATTERY BULK LIMIT ROUGHER CRUSHER FEED HOPPER BULK BULK AND VIBRATING FEEDER CRUSHED ORE SCAVENGER CONDITIONING CONVEYOR 3 SAG MILL TANK FLOWSHEET CRUSHED ORE BALL MILL 1 BALL MILL 2 PORTABLE JAW C
Slide 11: Murray Brook Is Key to Caribou Increasing Throughput
MURRAY BROOK IS KEY TO CARIBOU INCREASING THROUGHPUT Caribou Operation 2018-2019 Murray Brook Proposed Design 2,5001 tpd 3,300 tpd @ @ $35/t1 processed $31/t 1 processed MURRAY BROOK DEPOSIT – Only 10km away • UG ore delivery challenges increased costs • OP ore delivery reliable and reduces FX costs
Slide 12: Caribou Horizon Trend Consolidation
CARIBOU HORIZON TREND CON SOLIDATION Canadian Copper Property is 18km Connects two Former Producing Operations Underexplored with +30 Years Historical Production 5 km from Highway #180 Caribou Mine Murray Brook West Produced +700Mlbs of Zinc, Lead, and Silver Project • 2,790 hectares We are • Highly
Slide 13: Murray Brook Deposit Defining Further Extensions
MURRAY BROOK DEPOSIT DEFINING FURTHER EXTENSIONS MB2019-02 MB2018-03 MB2012-65 0.82%Cu ov er 34.0m 0.79%Cu, 2.95% Pb-Zn, 0.81%Cu, 2.20% Pb-Zn, 33 g/t Incl. 1.42%Cu, 0.15g/t 29 g/t Ag ove r 99.6m Ag, 0.55 g/t Au over 81.8m Au over 16.3m Incl. 3.04% over 19.0m Incl. 4.07% over 11.0m • 3000m drill prog
Slide 14: MOU with Pabineau First Nation
15 SE P TE MBE R 2025 MOU WITH PABINEAU FIRST NATION October 8th , 2024: Canadian Copper signed a non-binding Memorandum of Understanding with Pabineau First Nation The MOU aims to foster Creates mutual benefits, Pabineau First Nation open communication and including job creation, provides local lan
Slide 15: Management Team / Board of Directors
CSE: CCI MANAGEMENT TEAM BOARD OF DIRECTORS SIM ON QUICK | CEO & DIREC TOR ANDREW ELINESKY | DIRECTOR Mr. Quick has more than 14 years as a well-regarded mining As a finance professional, Mr. Elinesky brings over 20 years of experience as a CFO and leader, spanning the USA, Mexico, Argentina, and Ca
Slide 16: Thank You
THANK YOU Simon Quick Chief Executive Officer simon@canadiancopper.com 905.220.6661 16
Slide 17: Appendix A: 2023 Mineral Resource
APPENDIX A: 2023 MINERAL RESOURCE 1 1 US metal prices $4.00/lb Cu, $1.25/lb Zn, $0.95/lb Pb, and $23/oz Ag at $0.76 USD/CAD. 17 1 Process recoveries used were 80% Cu, 87% Zn, 75% Pb, and 90% Ag.
Slide 18: Appendix B: Capital Cost
15 SE P TE MBE R 2025 APPENDIX B: CAPITAL COST 1 SUSTAINING CAPEX CAPEX CARIBOU MILL PURCHASE $6 C$ 49M MINING - OTHER 29 WATER TREATMENT 0.2 PROCESS PLANT 7 Mining & Plan Equipment ON SITE 1 C$ 64M INFRASTRUCTURE Tailings Storage Facility INDIRECTS 6 Water Treatment plant PROJECT DELIVERY 4 OWNERS
Slide 19: Appendix C: Site Layout
15 SE P TE MBE R 2025 APPENDIX C: SITE LAYOUT 19
Slide 20: Initial Capex (C$M) & After-Tax IRR (%)
15 SE P TE MBE R 2025 INITIAL CAPEX (C$M) & AFTER-TAX IRR (%) $1,968 $1,347 $1,144 $1,082 67% 46% 46% 31% 38% 36% 29% 23% 25% 29% 22% 25% 25% 23% 20% 14% 13% 20% $653 $568 $493 $383 $220 $186 $181 $145 $142 $142 $81 $67 $64 $46 Berg Yellowhead North McIlvenna Pine Point Kwanika Kutcho Kudz Ze Carmac