Oracle Power Plc · LSE:ORCP

Oracle Power — Investor Presentation (October 2023)

32 slides from Oracle Power's investor presentation, October 2023

  1. Slide 1: Unlocking major project return through focused development strategies & international partnerships

    Unlocking major project return through focused development strategies & international partnerships Corporate Presentation October 2023 Oracle Power

  2. Slide 2: Disclaimer

    DISCLAIMER THE INFORMATION CONTAINED IN THIS CONFIDENTIAL DOCUMENT (“PRESENTATION”) HAS BEEN PREPARED BY ORACLE POWER PLC (THE “COMPANY”). IT HAS NOT BEEN FULLY VERIFIED AND IS SUBJECT TO MATERIAL UPDATING, REVISION AND FURTHER AMENDMENT. THIS PRESENTATION HAS NOT BEEN APPROVED BY AN AUTHORISED PERS

  3. Slide 3: Company Overview

    COMPANY OVERVIEW RECOGNISING & REALISING VALUE An international natural resources & energy project developer listed Currently active in Pakistan & Australia on London's AIM market (L.ORCP) Led by an experienced team with extensive experience in major Robust relationships with industry giants, which

  4. Slide 4: Team to Deliver

    TEAM TO DELIVER THE RIGHT COMPOSITION OF INDIVIDUALS TO DELIVER ON OUR LONG-TERM STRATEGY & SHORT-TERM OBJECTIVES Mark Steed Involved in major projects both in the UK & in emerging markets. With +35 years' experience in the Securities industry, he is a Non-Executive Chairman member of the Institute

  5. Slide 5: Our Portfolio

    OUR PORTFOLIO DELIVERING GROWTH FROM EXCEPTIONAL PROJECTS & STRONG PARTNERSHIPS NORTHERN ZONE GREEN HYDROGEN THAR BLOCK VI COAL THAR SOLAR GOLD PROJECT PROJECT PROJECT PROJECT WESTERN AUSTRALIA PAKISTAN PAKISTAN PAKISTAN Strategic MoU with State Grid 25km east of major gold mining Corporation of Chi

  6. Slide 6: Clear Strategy

    CLEAR STRATEGY OUR VISION IS TO BE A LARGE INTERNATIONAL PROJECT DEVELOPER IN THE NATURAL RESOURCES & ENERGY SECTORS, THROUGH A GROWING PORTFOLIO OF HIGH RETURN PROJECTS 1. 2. 3. 4. Develop selected early-stage Deliver bankability, by de-risking Be jurisdiction agnostic and invest Diversify to mitig

  7. Slide 7: Northern Zone Gold Project

    NORTHERN ZONE GOLD PROJECT WESTERN AUSTRALIA Oracle Power 7

  8. Slide 8: Snapshot

    SNAPSHOT WORLD CLASS OREBODY ASX Code: RGL Acquired highly prospective gold project license located in Western Australia in Q4 2020 25km east of the major gold mining centre of Kalgoorlie, the home of the ‘Super Pit’ mine, which is the second largest gold mine in Australia Exploration targeting 2.5M

  9. Slide 9: Development Timeline

    DEVELOPMENT TIMELINE NEAR-TERM TIMELINE TO PRODUCTION Q4 2020 Q4 2021 Q1 2022 Q2 2022 Q2 2023 Q3 2023 + Project acquisition Reverse Circulation Positive results Tests return very high Farm in HoT Riversgold Diamond Commercial drilling concluded =>IRGS with target gold recovery rates agreement with A

  10. Slide 10: Green Hydrogen Project

    GREEN HYDROGEN PROJECT PAKISTAN Oracle Power 10

  11. Slide 11: Snapshot

    SNAPSHOT ORACLE ENERGY IS THE SPV FOR THE GREEN HYDROGEN PROJECT & IS FUNDED ON A 70:30 BASIS BY KAHEEL ENERGY (100% OWNED BY HIS HIGHNESS SHAIKH AHMED DALMOOK AL MAKTOUM THROUGH HIS PRIVATE OFFICE) & ORACLE POWER RESPECTIVELY Strategy to be Pakistan’s first hydrogen facility, establishing the count

  12. Slide 12: Location

    LOCATION 7,000-ACRE AREA, CLOSE TO N5 HIGHWAY, WHICH CUTS THROUGH THE CENTRE OF PAKISTAN FROM THE COASTAL KARACHI TO THE NORTHERN REGIONS • N5 highway connects the project to the two largest ports in Pakistan: 35km to Port Qasim & 70km to Karachi Port • Within a radius of 20km, +350MW of renewable p

  13. Slide 13: The Market

    THE MARKET GREEN HYDROGEN & GREEN AMMONIA MOLECULES HAVE GAINED BUSINESS & GOVERNMENT INTEREST WORLDWIDE GREEN HYDROGEN GREEN AMMONIA Demand for clean hydrogen could reach 660 million metric tons in 2050, making up Expected that the country-to-country traded ammonia market would grow from 18- 22% of

  14. Slide 14: Globally Announced Green Hydrogen Projects

    GLOBALLY ANNOUNCED GREEN HYDROGEN PROJECTS ORACLE ENERGY’S GREEN HYDROGEN PROJECT IS THE FIRST ANNOUNCED PROJECT OF MEGA SCALE WITHIN THE INDO-PAK REGION • +1,000 project proposals have been announced globally as of the end of January 2023 • 795 aim to be fully or partially commissioned through 2030

  15. Slide 15: Planned Production Facility

    PLANNED PRODUCTION FACILITY HYDROGEN SUPPLY CHAIN • Project is in Pakistan’s Sindh province, a region abundant with larger solar and wind renewable resource and good infrastructure. Company plans to develop project as follows: 2 3 4 • Hybrid Renewable Energy Production & Storage - solar & wind power

  16. Slide 16: Feasibility Studies

    FEASIBILITY STUDIES GREEN H2 & GREEN NH3 STUDY HYBRID RENEWABLE POWER & TRANSMISSION STUDY Undertaken by Thyssenkrupp Uhde, a global leader in chemical Study undertaken by Shanghai Survey, Design & Research Institute plant engineering, study confirmed project development viability: (SIDRI) • Assesse

  17. Slide 17: Potential Offtakers

    POTENTIAL OFFTAKERS STRONG RELATIONSHIPS WITH INTERNATIONAL CONGLOMERATES • Agreement for cooperation & commercialisation signed with MOU with Emirates Global Aluminium, a leading global aluminium PetroChina International (Middle East) (PCME) producer, for the potential supply of 50,000 tonnes of gr

  18. Slide 18: Planned Development Timeline

    PLANNED DEVELOPMENT TIMELINE FOCUSED ON PROJECT OPTIMISATION 2021 – Q1 2023 Q2 2023 Q3 2023 Q4 2023 2024 2025 2026 2022 Pre-feasibility Emirates global PetroChina offtake Hydrogen / ESIA/ geotechnical Negotiation with Financial close Plant operational study completed aluminum offtake MOU ammonia fea

  19. Slide 19: Progress Highlights

    PROGRESS HIGHLIGHTS • Pre-Feasibility Study completed by Power China International for 400MW GH production & 1.2 GW hybrid power generation • LOI issued by GoS for 1.2 GW renewable power generation consisting of 700 MW solar and 500 MW of wind power ONGOING • • 7,000 acres landPROGRESS acquired in t

  20. Slide 20: The Thar Solar Project

    THE THAR SOLAR PROJECT PAKISTAN Oracle Power 20

  21. Slide 21: Snapshot

    SNAPSHOT A STRATEGIC PROJECT TO UTILISE BLOCK VI IN THAR COVERING 66.3 SQ. KM, IN LINE WITH FOCUS ON SUSTAINABILITY & NATIONAL GOALS Conditional permission obtained from the Pakistani Government to established a 1GW solar farm on the Thar Block VI mine site Positioned to meet Pakistan’s ambitious so

  22. Slide 22: Prospects & Markets

    PROSPECTS & MARKETS SIGNIFICANT OPPORTUNITIES • Energy produced anticipated to be integrated into the national power grid or sold to K Electric operating within the grid framework • Power could also be used for development of Thar Block VI itself, especially for the coal-to-gas & coal-to-liquid conv

  23. Slide 23: Planned Development Timeline

    PLANNED DEVELOPMENT TIMELINE RAPID DEVELOPMENT WITH FULL SUPPORT OF THE GOVERNMENT Q2 2022 Q4 2022 Q2 2023 + Pre-feasibility for 1GW completed Conditional permission obtained from MOU with PowerChina signed (project 1GW power COD Government for project announced) Oracle Power 23

  24. Slide 24: Thar Block VI Coal Project

    THAR BLOCK VI COAL PROJECT PAKISTAN Oracle Power 24

  25. Slide 25: Snapshot

    SNAPSHOT 30-YEAR MINING LEASE FOR BLOCK VI, WHICH HAS +1.4 BILLION TONNES OF LIGNITE COAL (JORC) Located in one of the largest coalfields in the world, Thar, 380km to the east of Karachi, 20km northeast of Islamkot town & airport 30-year mining lease for Block VI - 100% owned by Oracle Power's subsi

  26. Slide 26: Prospects

    PROSPECTS EXTENSIVELY DIVERSIFIED & ENHANCED INITIAL COAL TO POWER DEVELOPMENT AT BLOCK VI 73% proposed equity under 15% proposed equity under 12% proposed equity under Consortium Agreement Consortium Agreement Consortium Agreement DEVELOPMENT PATHS 1. 2. 3. 1,320MW power plant Gasification for urea

  27. Slide 27: Coal Mine

    COAL MINE A WORLD-CLASS ASSET February 2012, feasibility study (JORC) by SRK Consulting: • 529 million wet tonnes of coal with a gross calorific value of 3,182 kcal/kg, making it ideal for power generation • 23-year mine life, using an open-pit mining technique, with mining operations to extend down

  28. Slide 28: Coal Power Plant

    COAL POWER PLANT PREPARING A PATHWAY FOR THE DEVELOPMENT OF THIS IMPORTANT PROJECT • MOU signed in May 2023 for the development of the 1.32GW Thar coal-fired power plant • Two units of 660MW each • K-Electric as the off-taker • Government of Sindh as a facilitator • Potential investor & PowerChina I

  29. Slide 29: Coal Gasification (Urea/Fertiliser) & Coal-to-Liquids

    COAL GASIFICATION (UREA/FERTILISER) & COAL-TO-LIQUIDS ONGOING SUPPORT FROM THE GOVERNMENT OF PAKISTAN FOR MOBILISATION OF CTG/L DEVELOPMENT GIVEN PAKISTAN'S CRITICAL GAS CRISIS • Coal Gasification Thar Block VI has the potential to provide urea for Pakistan’s fertiliser production & assist in increa

  30. Slide 30: Investment Case

    INVESTMENT CASE COMMITTED TO GENERATING SHAREHOLDER RETURNS KEY PROJECTS BUILDING VALUE SUPPORT Four diverse, world-class projects Maximising value through developing Strong government & stakeholder specifically targeted to generate strategies to fast-track pathways to support significant value & mi

  31. Slide 31: Glossary of terms

    Glossary of terms Dictionary of terminology and acronyms JV Joint Venture PCME PetroChina International (Middle East Company) CPEC China-Pakistan Economic Corridor MOU Memorandum of Understanding FEED Front-End Engineering Design EGA Emirates Global Aluminium JDA Joint Development Agreement ESIA Env

  32. Slide 32: Oracle Power

    Oracle Power www.oraclepower.co.uk info@oraclepower.co.uk PR & IR Contact St Brides Partners Ltd oracle@stbridespartners.co.uk 32

Oracle Power — Investor Presentation (October 2023) on 6ix