Miller Energy Resources — Investor Presentation (December 2014)
23 slides from Miller Energy Resources's investor presentation, Dec 16, 2014
Slide 1: Miller Energy December, 2014
Miller December, 2014 Energy
Slide 2: Miller Energy at a glance
om Miller Energy ~11.7 MMBOE Ryder Scott Proved Reserves Oe: ~$447 million” Proved Reserves % Oi ~62% Company Operated % of Net Production 200% AK Lease and Exploratory ~620K gross North Slope - Badami Acre Position acres”) Cook Inlet — North Fork. (2) Source: Ryder Scott reserve report dated 7/31/1
Slide 3: Value Proposition — Enabling Investment In Alaska
Value Proposition — “Enabling Investment In Alaska” Substantial Hydrocarbon State-of-the-Art Resources Infrastructure Alaska D&C Funding and Balance Sheet Commodity Price Simplification/Cost of Environment Capital Efficiencies Increased Governance, Independence and Internal Checks-and-Balances / Boa
Slide 4: Working Strategy - Alaska Pure-Play
Working Strategy - “Alaska Pure-Play” CLARIFY ASSET VALUE REDUCE DISTRACTIONS Define high-quality, under-valued assets Upstream - Midstream Educate AK-location benefits Continue to build strong ops team Continue to build track-record Improve liquidity - Capex discipline WI sell-downs, Reduce BS comp
Slide 5: Asset overview
Pel i approximately 710 BOE/D® = WI = 100%, NRI = 83.6% = PL: .8 MMBoe / ~24%°) = P3: 4.0 MMBoe /~ 13%") = Redoubt 3P total reserves do ore’ approximately 1,400 BOE/D!?) = WI= 100%, NRI = 82.7% - 85.8% (Sword) = P1: 4.9 MMBoe / ~42%0) = P3: 8.5 MMBoe / ~26%) and other step out wells, = 12MB of stora
Slide 6: Favorable Alaskan Drilling Support and Pricing
Favorable Alaskan Drilling Support and Pricing Miller State Drilling Support Cash Tax Credit Receipts* + Through “tax credits,” the state reimburses MILL in cash $35.0 ga12 for 20%-40% of its D&C costs and 25% of its carried- forward annual loss credits. $28.0 $21.8 + Regardless of well success $21.
Slide 7: Total Reserves
Total Reserves Additional / Contingent Resources * RU-12 * Sabre . rd * Badami 5 Reserve PV-10 Value ($mm) 3P Reserve PV- Reserve PV-10 Value ($mm) 1P, 2P & 3P per 7/31 Ryder Scott Report; excludes Badami. 1P Reserve PV-10: $447mm 00 2s Proved Developed _® PUD $830mm 198.0 407.6 mip 2p 3p Miller Ene
Slide 8: Capitalization
Capitalization fin $00c Pro Forma| 10/31/2014") Revolving Credit Facility (L#300-L+400) -—--36,000.0 Second lien Termloan (11.75%) 175,000.0 Rig 36 Capital Lease 2,951.0 2,363.0 [Total Debt 216,314.0| Series C Preferred Stock 69,154.0 Series 0 Preferred Stock 49,791.0 ‘Common Equity! 80,858.0 [ 416,
Slide 9: Redoubt Unit Field (Osprey)
Redoubt Unit Field (Osprey) | ) Miller rf nergy * Proved, producing field with existing state of the art infrastructure, near new 2,000 HP drill rig + Large four-way structure located approximately 2.5 miles Southwest of the Osprey platform + Recent 3" party OOIP report shows over 150 MMBO, only pro
Slide 10: West McArthur River Unit
West McArthur River Unit Highlights + Proved, producing field with existing infrastructure * ~13.3 MMBBO recovered from WMRU to date, OOIP estimated over 45 MMBBO (excluding Sword & Sabre), 100% WI, 82.7% NRI (WMRU) * On trend with adjacent McArthur River Field (produced over 643 MMBO) * Initial Pro
Slide 11: North Fork Unit highlights
Om Miller Energy Highlights + Proved, producing field with existing infrastructure, 15,464 acres * Over 24 BCF in proved reserves, currently producing ~9.0 MMCFG/D * Fixed multi-year natural gas contract @ ~$7.0/MCF 100% WI, 80.2% NRI + Average Initial Production: > 3,500 MCFD * Additional infield t
Slide 12: Recent North Slope, Savant Acquisition — Badami Field
Recent North Slope, Savant Acquisition — Badami Field nergy + Proved, producing field (Badami) with existing state of art infrastructure, facility rated @ 38,500 BOPD, ~50 miles of pipeline, ~18,500 acres + Most easterly located active production facility near significant 3" party exploration acreag
Slide 13: Drilling Rigs
Drilling Rigs Miller Energy Location Status Future Plans Rig-34 Company ~750Hp, land Nikiski Stacked Being moved to L48 for sale $5 milion Owned based, ~6,000" depth Rig-35 Company ~2,000Hp, Osprey Redoubt “horse” $25 million Owned platform based, ~21,000' depth Rig-36 ‘Company ,400Hp, Nikiski Under
Slide 14: Path Forward
Path Forward Miller Energy Operational + Spent significant capital on four recent wells + —Lower-risk well focus with de minimis results Increased technical resources Focused on reserve growth > production / * “Structural tension” in well-vetting cash flow * Emphasis on production / cash flow > rese
Slide 15: Path Forward (Cont.)
Path Forward (Cont.) Miller Energy Liqui Growth Shareholder Base Downward risk to borrowing base in Jan. ~ Production, drilling results, oil prices Capital markets uncertainty Potential delays in receipt of state cash tax credits Perceived limited NT growth Unclear LT growt! Largely retail Increases
Slide 16: LT Growth Avenues
Miller Energy LT Growth Avenues Jara | Options Redoubt * Hydraulic fracturing Work North fault blocks Sword + JV/ develop on-own Sabre + JV/develop on-own Badami + Sell-down Iniskin + JV / develop on-own Susitna + JV/develop on-own AKM&A + “Bolt-ons” Midstream * Create own MLP Create a “JV AK” MLP S
Slide 17: Every $100MM value = ~$2+ / share
Every $100MM value = ~$2+ / share $1,600 $1,400 $1,200 $1,000 $800 $600 $400 $200 $0 1P, 2° & 3P per 7/31 Value Proposition Mc Preferred Debt “1,100 ~NOL Cash AK AR, Drill Cash AK AR 3P PV10 2P PVIO. Midstream Est. Liquidation Value 4P PVIO. Midstream MLP options
Slide 18: APPENDIX
APPENDIX
Slide 19: North Cook Inlet and Susitna
North Cook Inlet and Susitna Legend (cook inlet) Il veveloped acreage 25,548 Net Acres Exploratory Acreage hss Netaces Total acreage 589,203 Net Acres ‘Willow North Alexander rer O186n Creek 3 Mile Creek | ExenMobil _ West McArthur River Nikiski
Slide 20: South Cook Inlet
South Cook Inlet Legend (cook inet) I veveloped acreage 1) Exploratory Acreage 563,655 Net Acres Total Acreage '589,203 Net Acres Anchor Point | Worth Fork Unit ai
Slide 21: North Slope
North Slope Legend (worth siope) North Slope BE deveopes acreage 91027 Neta Exploratory acreage 16,391 NetAcr Total Acreage 25,418 NetAcres Badami Unit and Pipeline aa Ll ; [PE Thomson Unit “To Prudhoe B:
Slide 22: » Miller
» Miller Energy
Slide 23: Hedging Summary
Hedging WA Miller He Energy jedging Summary Over 76% of current net oil production hedged Contract price currently $7.06/mef 1.8 BCF remaining as of December 2014 Current Hedge Summary 2500 104 Crude 102 Contract Volumes 2000 100 = (mbbis) gy ie = SNovt4-April'15_ Swap 389.6 $98.71 3 1000 co A Swap