Red Hill Minerals Ltd · ASX:RHI

Red Hill Minerals — Red Hill Iron — Corporate Update (November 2011)

18 slides from Red Hill Minerals's corporate update, Nov 7, 2011

  1. Slide 1: ASX cover letter: Company Update

    Exploration Office: Ground Floor, 43 Ventnor Ave, West Perth WA 6005 Registered Office: Level 2, 9 Havelock Street, West Perth WA 6005 ABN: 44 114 553 392 Postal Address: PO Box 1160, West Perth WA 6872 Telephone: (61 8) 9481 8628 Facsimile: (61 8) 9481 8445 E-mail: redhillinfo@redhilliron.com.au We

  2. Slide 2: Red Hill Iron Update November 2011

    RED HILL IRON Limited RED HILL IRON Update N November b 2011 1

  3. Slide 3: Disclaimer and Warning

    RED HILL IRON DISCLAIMER Limited Di l i Disclaimer and d Warning W i No representation or liability: No representation or warranty is made as to the fairness, currency, accuracy, completeness, reliability or reasonableness of this presentation, or any opinions, conclusions and forward‐looking statem

  4. Slide 4: About Red Hill Iron

    RED HILL IRON ABOUT RED HILL IRON Limited ABN: 44 114 553 392 ● The WPIO Project size is substantial – RHI has ~5 mtpa of the ~30mtpa project ● Product is direct‐ship haematite haematite, – Tested and in demand, ● Infrastructure is well‐founded – Part P off a new 350 mtpa port, ● Red Hill Iron is Fr

  5. Slide 5: Corporate

    RED HILL IRON CORPORATE Limited ABN: 44 114 553 392 Structure RHI SHAREHOLDING 30 Sep 11 PUBLIC 41.6% PITT & ASSOCS 20.1% Listed Ordinary shares on issue: 43,915,686 AQUILA AND ASSOCS 19.9% ASX Code: RHI FRC AUSTRALIAN 9.2% Options: Nil BRISBANE INVESTMENTS I 4.6% Share Price 03‐Nov‐11 2.15 BRISBANE

  6. Slide 6: Share Price

    SHARE PRICE ASX: RHI $8.00 9,000. High $7.00 May 08 $7.00 8 000 8,000. $6.00 7,000. 6,000. , ds Australian All Ord $ $5.00 ed Hill Iron 5,000. $4.00 4,000. Re $3 00 $3.00 3,000. $2.00 $2.15 on 02 Nov 11 2,000. $1 00 $1.00 1,000. All ORD $0.00 0. Jull ‘06 Jull ‘09 Jull ‘10 Jull ‘11 Jull ‘07 Jull ‘08

  7. Slide 7: The West Pilbara Opportunity

    THE WEST PILBARA OPPORTUNITY Anketell Port will unlock several very significant iron ore projects in the West Pilbara. ‰ +350 Mtpa potential iron ore export ‰ As well as the RHIOJV, projects held by Proposed FMG, IOH, API and others stand to benefit PORT AND RAIL ‐ UNLOCKING STRANDED DEPOSITS 6

  8. Slide 8: CID – Simple, Low Risk

    CID – SIMPLE,, LOW RISK 100m 4m@58.7% 18m@57.2% 8m@58.5% m@56.1% 57.7% 16m@58..0% 100m 20m@58.0% 18m 28m@5 14m@58.6 16m@58.8% 18m@57.6% 10m@57.7% o Channel Iron Deposits are in Mesas and have a low strip ratio o The Resource is predictable o Dry Mining o Several Sources for blending o C Conventional

  9. Slide 9: Resources and Reserves: Pannawonica

    RESOURCES AND RESERVES PANNAWONICA PANNAWONICA PROJECT INFERRED MINERAL RESOURCES Red R d Hill Iron I has h C t ff Fe% Cut‐off F % Mt F % Al2O3% P% SiO2% Fe% 48 137 51.7 5.5 0.04 10.2 Resources of 71mt of 50 106 53.1 5.1 0.05 9.4 modest grade CID haematite on 52 71 54.1 4.8 0.05 8.5 Source: RHI 29 O

  10. Slide 10: RHIOJV Resources and Reserves

    RHIOJV RESOURCES AND RESERVES RESOURCES RESERVES Stage 1 WPIOP RESOURCE Stage 1 WPIOP RESERVE Mt Fe% Al2O3% SiO2% P% Mt Fe% Al2O3% SiO2% P% 01‐Nov‐10 687 56.6 6.1 3.7 0.07 03‐Dec‐10 445 57.1 5.8 3.4 0.07 Source ASX: Source: ASX AQA 01 Nov 2010 Source AQA:ASX Source: AQA ASX 03 Dec '10 Includes Mt St

  11. Slide 11: Port and Rail Development

    PORT AND RAIL DEVELOPMENT The Port Master Plan has objectives to develop an open access, multi‐user, 350 Mtpa capacity bulk commodity export port, with an industrial area and a corridor for transport and services to accommodate a range of users and different mineral commodities. The Master Plan prov

  12. Slide 12: Project is Well Advanced

    PROJECT IS WELL ADVANCED Approvals Environmental – EPA Recommend Approval 2011 2012 2013 2014 2015 o Primary Approvals expected to be granted by Q4 2011 Design and Engineer o Preparatory work for secondary approvals underway Operational o The EPA has recommended conditional approval for Primary Appr

  13. Slide 13: Demand for Iron Ore Remains Strong

    DEMAND FOR IRON ORE REMAINS STRONG Many Large Chinese provinces are just beginning to climb the steel intensity curve. Chinese Regional Steel Intensity Steel use per capita 2009 (kg) 1400 ‐ Beijing 1200 ‐ 18m 1000 ‐ Shanghai g Sh d Shandong 19m 800 ‐ 95m Henan 100m 600 ‐ 400 ‐ Guangdong Shanghai 96m

  14. Slide 14: Red Hill Iron: Pathway to Re-rating

    RED HILL IRON – Pathwayy to Re-ratingg Red Hill Iron: Possible Incremental value ‐add We anticipate that as the project API Lock up Funding progresses into production there Announce GO may be several incremental value‐ add occasions. xpand Reserves Expand Complete DFS These represent the de‐risking

  15. Slide 15: Implied Value of RHI

    IMPLIED VALUE OF RHI Other Transactions and RHI Implied Value – Transaction Based – $12.00 RHI's 20% of RHIOJV for 118Mt +71Mt at Pan. Incl KBE Val per sharetle $10.00 $8.00 $6.00 $ $5.02 Based on contained Fe units, units Implied RHI V $4.00 recent transactions imply a value $2.00 for Red Hill Iron

  16. Slide 16: Red Hill Iron's Edge

    RED HILL IRON’S EDGE 9 Project Size is substantial: RHI has a stake in the West Pilbara Iron Ore Project which has 445 Mt of ore reserves and will ship >30 mtpa ore. ore In addition, RHI has a 100% owned CID resource nearby. 9 Product is appropriate Ore is direct shipping haematite ,has been rigorou

  17. Slide 17: Competent Person Statement

    COMPETENT PERSON STATEMENT Competent Person Statement The information in this presentation is based on information compiled by Mr Doug Stewart, who is a Fellow of The Australasian Institute of Mining and Metallurgy and is an employee of Red Hill Iron Limited Limited. Mr Stewart has sufficient experi

  18. Slide 18: Red Hill Iron Update November 2011

    RED HILL IRON Limited RED HILL IRON Update November 2011 17

Red Hill Iron — Corporate Update (November 2011) on 6ix