BP plc · LSE:BP.
BP — Investor Day (2018)
8 slides from BP's investor day presentation, 2018
Slide 1: Base and transformation
Track record Base and transformation Gordon Birrell Upstream COO Production, Transformation and Carbon Leigh-Ann Russell Head of Upstream Procurement and Supply Chain Management Ian Cavanagh Head of Upstream Transformation BP UPSTREAM INVESTOR DAY AND FIELDTRIP 1
Slide 2: Maximising the value of the base
Track record Maximising the value of the base Alaska Russia Canada North Sea Optimising base decline BPX Energy L48 AGT Rigorously North Africa India managing cash costs Trinidad GoM Enabled by our Asia Pacific transformation agenda Middle East Angola Latin America Cumulative production Remain
Slide 3: Optimising base decline
Track record Optimising base decline Managed base decline1 % 5 Managed base decline performance achieved through: Guidance 3 – 5% Improving operating efficiency Strong reservoir management System modelling and optimisation Improving wedge delivery Base decline guidance now 3-5% excluding
Slide 4: Optimising base decline – improving operating efficiency
Track record Optimising base decline – improving operating efficiency Operating efficiency TARs1 – days and deferrals Improving trend in mature region and plant reliability North Sea performance % Annual % Plant reliability Operating efficiency TAR deferrals mboed TAR days Plant reliability Operatin
Slide 5: Rigorously managing cash costs
Track record Rigorously managing cash costs Production costs1 2017 cash costs summary $/boe BP (excl Rosneft) Competitor range Other BP costs (including labour, BPX Energy L48, gas trading) Third-party spend Operated by others (OBO) 2013 '14 '15 '16 '17 2018 est (1) Includes fuel gas; Competitor Ran
Slide 6: Management of cash costs
Track record Management of cash costs Alaska Gulf of Mexico Trinidad Field wide Aggregation of Supplier collaboration standardisation of regional demand for on new technology and instrumentation data acquisition. new commercial models systems with a new Collaboration with for project commercia
Slide 7: Rapid scale up of transformation in 2018
Track record Rapid scale up of transformation in 2018 ~1,000 Over 1,300 continuous transformation projects Alaska improvement projects Plant Operations Advisor deployed in Gulf of Mexico and Angola Agility Mindset Digital Nearly 3,000 people Over 2,000 senior 7.5 petabytes now in trained leade
Slide 8: Base and transformation – what's next?
Track record Base and transformation – what’s next? Transformation Safety Mindset and agility Automation Transforming how we work Production Costs and toolkit efficiency Optimisation Digitisation and collaboration BP BPUPSTREAM UPSTREAMINVESTOR INVESTORDAY DAYAND ANDFIELD TRIP 8 FIELDTRIP