Turquoise Hill Resources Ltd.

Turquoise Hill Resources — Non-Deal Roadshow (September 2013)

11 slides from Turquoise Hill Resources's roadshow presentation, September 2013

  1. Slide 1: An emerging world-class copper and gold producer

    An emerging world-class copper and gold producer September 2013

  2. Slide 2: Forward-looking statements

    Forward-looking statements This presentation includes certain “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of the “safe harbour” provisions of the United States Private Securities Litigation Reform

  3. Slide 3: Long-term growth opportunity

    Long-term growth opportunity 1 Unique pure copper and gold exposure with attractive industry fundamentals 2 World class asset, strategically located next to the key growth market 3 Flexible growth profile with further expansion options 4 Commenced production, expected cash flow generation from 2013

  4. Slide 4: Unique North America-listed pure copper exposure

    Unique North America-listed pure copper and gold exposure Top 15 producing copper mines (2020)(1) $3.00 $2.50 $2.00 2020E C1 Cash Cost ($/lb) $1.50 $1.00 Turquoise Hill Resources/ Oyu Tolgoi(2) $0.50 Bubble size reflects contained copper resources (kt) Independent copper producer and publicly traded

  5. Slide 5: Oyu Tolgoi - expected major gold producer

    Oyu Tolgoi - expected major gold producer Top 10 deposits by contained gold reserves and resources (moz)  Oyu Tolgoi ranks as top four gold Free State deposit globally by contained reserves and resources Round Mountain  First ten years average annual Tropicana East production of 495koz of gold #4:

  6. Slide 6: World-class asset, experienced operator

    World-class asset, experienced operator  Strategic location: o At the doorstep of the major growth market, 80km from Chinese border  Near-term and large scale: o Open pit operating at near full capacity o Multi decade mine life o 2.2bt Measured & Indicated and 4.4bt Inferred resource o Ranks in to

  7. Slide 7: Oyu Tolgoi ramping up to full capacity

    Oyu Tolgoi ramping up to full capacity  Commenced production in January 2013  Concentrator currently running at full capacity of approximately 100,000 tonnes of ore processed per day  First copper concentrate shipped July 9, 2013  Copper concentrate production between 75,000 and 85,000 tonnes in

  8. Slide 8: Expansion options and execution flexibility

    Expansion options and execution flexibility Southern Oyu Open Pit  100 ktpd concentrator  Operating cash flows will contribute to future growth  Secondary ore source once underground operations start Hugo South and Heruga  Evaluating development options Hugo North Underground  Block cave mine w

  9. Slide 9: Multiple development options available

    Multiple development options available  All options to be evaluated to ensure optimum development pathway  Actual operating performance to be evaluated prior to committing to expansions  A decision to expand the concentrator not required before 2015 OYU TOLGOI DEVELOPMENT OPTIONS Plant Expansion

  10. Slide 10: Securing long-term funding a priority

    Securing long-term funding a priority  Fund ongoing development of the project  Diversify sources of project funding through involvement of International Financial Main Objectives Institutions, Export Credit Agencies and international commercial banks  Repay New Bridge Facility and Interim Fundin

  11. Slide 11: Turquoise Hill – a long term growth opportunity

    Turquoise Hill – a long term growth opportunity  Unique pure copper and gold exposure with attractive industry fundamentals  World-class asset, located 80 km from the world’s largest copper market  Attractive growth profile with further expansion options and execution flexibility  Funding in pla

Turquoise Hill Resources — Non-Deal Roadshow (September 2013) on 6ix