Agl Energy Limited · ASX:AGL

Agl Energy — Corporate Update (July 2018)

21 slides from Agl Energy's corporate update, Jul 30, 2018

  1. Slide 1: Newcastle Gas Storage Facility Community Dialogue Group Meeting 7

    Newcastle Gas Storage Facility Community Dialogue Group Meeting 7 30 July 2018

  2. Slide 2: Open and welcome / Agenda

    Open and welcome 1 Previous minutes Business arising 4 NGSF Environment Update Local Community Investment 2 Program 5 NSW Generation Plan and 250 MW Gas-Fired Power Station 3 6 Next meeting Modification 3 Close

  3. Slide 3: Previous minutes and business arising

    Previous minutes and business arising

  4. Slide 4: Local Community Investment Program

    Local Community Investment Program

  5. Slide 5: Local Community Investment Program

    Newcastle Gas Storage Facility Community Dialogue Group | 30 July 2018 5

  6. Slide 6: Modification Update and next steps

    Modification 3 Update and next steps

  7. Slide 7: NGSF Gas Pipeline Route & Jemena Gas Network

    Modification 3 *, Existing JGN ‘Secondary Man Sie NGSF Gas Pipeline Route & Jemena Gas Network °

  8. Slide 8: Pipeline construction progress: AGL pipe easement and Pacific Highway

    AGL Pipe Easement • All pipe strung out and welded with about 1.34 km in ground • HP crossing expected to start around the second week of August • Tie in to NGSF targeted for around the second week of September • Hydrostatic testing date to be confirmed. Water disposal after hydro test to be trucked

  9. Slide 9: Environment update

    Environment update

  10. Slide 10: Environmental activities and monitoring

    • Annual Nest Box monitoring and reporting • Medowie Offset Property weed management • Annual air emissions monitoring on three boilers • Environmental Management Plan reviewed and updated • Preparation of Annual Returns for EPA (in progress) • Preparation of National Pollutant Inventory Report for

  11. Slide 11: NGSF Environmental Assessment and offset requirements

    • NGSF Environmental Assessment Ecological Assessment completed in May 2011: • 19.3ha of vegetation to be cleared • Five native vegetation communities, including 0.64ha of Swamp Mahogany-Paperbark Swamp Forest (endangered) • Four Earps Gum (threatened species) • Nine threatened Fauna species recorde

  12. Slide 12: Medowie Offset Property

    • Two adjoining lots purchased by AGL around 2012 • Off Old Swan Bay Road and Medowie Road, Medowie • Combined offset area of approximately 113ha • Two Exclusion areas, 2ha each • Internal fire trails • Unoccupied, heavily vegetated, minimal weeds • Adjoin other land under conservation (State Forest

  13. Slide 13: Biodiversity offset agreement and works completed

    • Signed by AGL and OEH in 2016 • Attached to the title of the land, no expiry date • Residential dwelling permitted in each of the Exclusion Areas • Restricted land use in conservation areas (e.g. no grazing, land clearing, limited vehicle use) • Ongoing maintenance, monitoring and reporting obliga

  14. Slide 14: NSW Generation Plan

    NSW Generation Plan

  15. Slide 15: Liddell replacement is AGL's preferred option

    Liddell replacement is AGL’s preferred option compared to the proposal to extend the life of Liddell Newcastle Gas Storage Facility Community Dialogue Group | 30 July 2018 15

  16. Slide 16: Stage 1 feasibility during 2019 or earlier

    Stage 1 (feasibility during 2019 or earlier) Newcastle Gas Storage Facility Community Dialogue Group | 28 May 2018 16

  17. Slide 17: Benefits to NSW and the region

    Benefits to NSW and the region Energy Emissions Investment Security Reduction in NSW • Improves security of electricity • Modernisation of NSW generation fleet • Represents a substantial capital supply to NSW will lower carbon intensity investment of up to $400m in NSW • Facilitates transition from

  18. Slide 18: Generation Overview

    Generation Overview • ~250MW new-build power station • Reciprocating engines or gas turbines • Fast start ‘peaker’ with primary role of providing firming capacity • Dual fuel – natural gas + diesel • Gas pipeline connection & diesel storage • Targeting construction completion in 2022 Location • Nort

  19. Slide 19: Community & stakeholder engagement

    Community & Environmental Gas & grid Concept design stakeholder Site selection approval connection / engineering engagement process design Newcastle Gas Storage Facility Community Dialogue Group | 30 July 2018 19

  20. Slide 20: Next meeting and close

    General Business Next meeting and close

  21. Slide 21: Lisa Andrews and Marina Draper contacts

    Lisa Andrews Marina Draper Independent Chairperson Newcastle Gas Storage Facility 0401 609 693 Community Relations Manager lisaandrews.ic@gmail.com 0498 020 244 MDraper@agl.com.au