  1. Slide 1: HPA First Project – Stage 2 Update

    rsonal use only HPA FIRST PROJECT – STAGE 2 UPDATE CRITICAL MINERALS FOR SEMICONDUCTOR INFRASTRUCTURE ASX: A4N

  2. Slide 2: Cautionary Statement Forward Looking Statements

    CAUTIONARY STATEMENT FORWARD LOOKING STATEMENTS The Definitive Feasibility Study (DFS) referred to in this This presentation contains certain forward-looking In particular, those forward-looking Presentation was undertaken in 2023 and 2024 to assess the statements with respect to the 2024 DFS, the 2

  3. Slide 3: Project Layout Gladstone, Queensland

    PROJECT LAYOUT GLADSTONE, QUEENSLAND ONE rsonal use only STAGE ONE: IN PRODUCTION ~ 350 TPA STAGE TWO: IN CONSTRUCTION. COMMENCING 2027 ~10,000 TPA

  4. Slide 4: Strong Manufacturing Facilities, Government Backing and Support

    STRONG MANUFACTURING FACILITIES GOVERNMENT GLADSTONE, QUEENSLAND BACKING AND SUPPORT A$75M EQUITY rsonal use only GLADSTONE, to 6.9% holding QUEENSLAND A$320M PROJECT LOAN A$80M COST OVERRUN1 A$30M ROYALTY INVESTMENT2 A$45M GRANT3 STAGE ONE: IN PRODUCTION ~350 TPA A$22M GRANT4 1 Drawdown subject to

  5. Slide 5: Stage 2 Highlights

    STAGE 2 HIGHLIGHTS HPA First Project Stage 2 on trac k to deliver compelling returns rsonal use only ANNUAL, STEADY STATE FUNDED WORLD LEADING PRODUCTION PROFILE OF 10,430TPA 1 PROJECT EBITDA OF CapEx Funding Stack A$ 2 88 M2 Largest, single -site production of high A$699M 3 A$ 820 M Margins driven

  6. Slide 6: Stage 2 Facility: 55% Complete, Commissioning Late 2027

    rsonal use only STAGE 2 FACILITY: +55 % COMPLETE , COMMENCING LATE 2027

  7. Slide 7: Stage 2: Project Metrics & Funding Stack

    STAGE 2 : PROJECT METRICS & FUNDING STACK Strong margins (~73%) with pricing upside as markets mature • Government debt proceeds to fund Project expenditure from November 2026 rsonal use only PROJECT METRICS FUNDING STACK $US (M)2 $A (M)1 $A (M)1 Steady State Steady State Stage 2 CapEx, Jan 2026 (in

  8. Slide 8: Stage 2 1.3x Oversubscribed, Dominated by Semiconductor Demand

    STAGE 2 +1.3x OVERSUBSCRIBED DOMINATED BY SEMICONDUCTOR DEMAND • Product Test samples (which include sales) >800 since Jan 2024 and >1,000 total • Ongoing qualification with >100 end-users • Velocity of test sample number and total volume still building rsonal use only • Test sampling activity has p

  9. Slide 9: Marketing Focus on Alpha's Technical Advantages

    MARKETING FOCUS ON ALPHA'S TECHNICAL ADVANTAGES LITHIUM-ION SECTOR SEMICONDUCTOR DLE BATTERY rsonal use only USE THERMAL INTERFACE CMP SEMI - CERAMICS DLE SORBENTS COATINGS High sintering, ‘low Alumina and ATH materials as Alumina abrasives for High purity Al-Nitrate as coating alpha” HPA for alumin

  10. Slide 10: Semiconductor Supply Chain Position

    SEMICONDUCTOR SUPPLY CHAIN POSITION Semiconductor packaging Spherical alumina manufacturers manufacturers Global Semiconductor Ultra high-purity rsonal use only IDMs* & aluminium based Foundries materials CMP Slurry Makers Thermal spray coating manufacturers Semiconductor Fabrication Equipment Manuf

  11. Slide 11: Thank You

    THANK YOU Rob Williamson Managing Director rwilliamson@alphahpa.com.au rsonal use only +61 407 125 176 Rimas Kairaitis Executive Director and Chief Commercial Officer rkairaitis@alphahpa.com.au +61 408 414 474 Robert Lord Investor Relations rlord@alphahpa.com.au +61 400 008 553 alphahpa.com.au