  1. Slide 1: Western Australia Plumbing Issues Update

    Western Australia Plumbing Issues Update Joint Industry Response 30 August 2024

  2. Slide 2: Summary

    Summary A Joint Industry Response to the Perth plumbing failures has been agreed in-principle ➔ A Joint Industry Response to the WA plumbing failures has been agreed in principle by the Western Australia Government, Iplex Pipelines Australia (“Iplex AU”) and almost all builders of WA homes built wit

  3. Slide 3: Summary (cont.)

    Summary (cont.) A Joint Industry Response to the Perth plumbing failures has been agreed in-principle ➔ Iplex AU has committed to the JIR because it is in all parties’ interests for there to be a pragmatic and homeowner-friendly mitigation of future issues. The JIR also means the Government has chos

  4. Slide 4: Summary (cont.)

    Summary (cont.) A Joint Industry Response to the Perth plumbing failures has been agreed in-principle ➔ The JIR is entered into by the parties on a no liability, no admissions basis. All participants have agreed to a “no sue” provision as to part of the agreement. ➔ Each party is not restricted from

  5. Slide 5: Summary (cont.)

    Summary (cont.) A Joint Industry Response to the Perth plumbing failures has been agreed in-principle Current Litigation ➔ As previously notified, a class action has been served on Iplex AU on behalf of all homeowners, Australia wide, alleging that the Pro-Fit product was not of acceptable quality a

  6. Slide 6: Background

    Background The plumbing failures continue to be concentrated in Perth ESTIMATED HOMES BUILT WITH TYPLEX PRO-FIT Data as of 21st August 2024 ➔ Pro-Fit with Typlex resin was first produced by Iplex AU in mid-2017 and was the bulk of the supply across Australia from then onwards c.15k homes c.15k homes

  7. Slide 7: Iplex's approach to the plumbing failures

    Iplex’s approach to the plumbing failures We have had a consistent focus on three workstreams ❶ ❷ ❸ SUPPORT FOR ESTABLISHING INDUSTRY CUSTOMERS & CAUSATION RESPONSE HOMEOWNERS A$15m interim investigation fund: Independent expert reports into causation confirm that: Iplex has been working with the In

  8. Slide 8: Trends in first time leak rates

    Trends in first time leak rates Information to Iplex shows homes in Perth with first-time leaks are reducing, measured period-on-period AVERAGE MONTHLY NUMBER OF PERTH HOMES EXPERIENCING A LEAK FOR THE FIRST TIME 124 43% Other Builders BGC 101 34% 89 21% 49 37 67 70 70 30 24 25 25 75 64 59 43 45 45

  9. Slide 9: Trends in leak rates

    Trends in leak rates Different leak rates between plumbers / builders – and therefore between homes BGC and three plumbing PLUMBING FAILURE RATES1 groups account for ~95% (% of plumbing failures / Perth homes built with Typlex Pro-Fit pipe) of WA leaks 23% 21% 21% (2) Average of 18% smaller builders

  10. Slide 10: How the Joint Industry Response will work

    How the Joint Industry Response will work Leak detector units & a stepped approach to leak repairs offers a pragmatic response to plumbing failures ➔ Iplex AU will offer all eligible WA homeowners, free of charge, the installation of a leak detector LEAK DETECTOR unit (LDU). LDUs funded 100% by Iple

  11. Slide 11: Why Iplex is committed to the Joint Industry Response

    Why Iplex is committed to the Joint Industry Response The JIR is in all parties’ interests Avoids a product recall, which would have involved massive & needless disruption and cost at a time where there was no capacity The Joint Industry Response: in the industry to deliver it. The JIR with Governme

  12. Slide 12: Financial considerations

    Financial considerations Provision of ~A$155m based on ~35% of homes being impacted & allows for BGC homes to be included under JIR. Costs & cash flows will be affected by actual level and will be lower if BGC does not join. Provision is Significant Item; cash flows are pre-tax ➔ Assuming the JIR is

  13. Slide 13: Next Steps

    Next Steps ➔ Formally document the Joint Industry Response among agreed participants ▪ Support under Iplex’s Interim Fund remains in place to the end of September to allow the JIR to get up and running ➔ Stand up the operational and administrative support for the Joint Industry Response ▪ Inclusive

  14. Slide 14: Questions?

    Questions? ; Fletcher ~ Building

  15. Slide 15: Important Information

    Important Information This presentation has been prepared by Fletcher Building Limited and its group of companies (“Fletcher Building”) for informational purposes. This disclaimer applies to this document and the verbal or written comments of any person presenting it. The information in this present

Fletcher Building — Corporate Update (August 2024) on 6ix