Rex Energy — IPAA OGIS New York April 2011
24 slides from Rex Energy's conference presentation, Apr 8, 2011
Slide 1: Rex Energy Corporate Presentation
Exhibit 99.1 Rex Energy Corporate Presentation April, 2011 IPAA OGIS New York Together We Can Make A Difference Rex Energy Corporation | 476 Rolling Ridge Drive | State College, PA 16801 P: (814) 278-7267 | F: (814) 278-7286 E: InvestorRelations@RexEnergyCorp.com www.rexenergy.com
Slide 2: Forward Looking Statements
ForwardLookingStatements Forward Looking Statements Exceptforhistorical information, statements madein thisrelease,includingthoserelatingto significantpotential,futureearnings, cashflow,capitalexpenditures, productiongrowthandplannednumberof wells(aswellas the timingof rig operations,naturalgasproce
Slide 3: Hydrocarbon Volume Estimates
Hydrocarbon Value Estimates Hydrocarbon Volume Estimates This presentation includes management’s estimates of Marcellus Shale potential recoverable resources, per well EUR (estimated ultimate recovery of resources) and upside potential of recoverable resources. Except as noted, these have been estim
Slide 4: Rex Energy Overview
RexEnergyOverview Significant upside in two high growth shale plays and tertiary oil recovery • 1.2– 1.9Tcfeinnon-proven Marcellus Shaleresourcepotential(1) • 9.5– 22.8Mmboeinnon-proven Niobrara Shaleresourcepotential(1) • 24.9–62.2Mmblsinnon-provenTertiaryRecoveryoilresourcepotential(1) Liquids Ric
Slide 5: Areas of Operation
Areas of Operation Appalachian Region • 56,000 net acres in Marcellus Shale fairway o 61% of acreage in liquids rich portion of the play o Totalnon-proven resource potential of1.2 –1.9Tcfe(1) o $11.6 million in drilling carries (2) Rockies Region • 39,000netacresinNiobrara Shalefairway(3) o 100% of
Slide 6: Key Investment Highlights for 2011
Key Investment Highlights for 2011 • Rex Energy is positioned for growth o Strong position in oil and liquids-rich areas o Company expects 2011 production growth of 71%-95% over 2010 • Strong core position in the Appalachian Basin o Solid core position in Butler County with 385 potential drill sites
Slide 7: Positioned For Growth
Positioned For Growth • Poised to achieve 71% 95%- production growth in 2011 • Expect to see 22% 40%- growth in oil and NGL production in 2011 • A mid case December exit rate of 45.6 Mmcfe/day in 2011 represents an 83% increase compared to the 2010 exit rate 7
Slide 8: Reserve Growth
Reserve Growth (1) Proved Reserve & Compound Annual Growth Rate Year-End 2010 • 33.6 Mmboe (201.7Bcfe) • Drill Bit F&D cost of $0.68/ Mcfe • $269.4 million PV-10 o 42% proved developed o 37% oil & NGLs o 85% liquids rich capture (2) Year-End 2009 • 20.9 Mmboe (125.2 Bcfe) • $190.5 million PV-10 o 54
Slide 9: 2011 Capital Budget
2011 Capital Budget Capital Budget (Net of Drilling Carries) ($ in millions) AppalachiaIllinois Rockies Total Drilling & Exploitation $81.4 $3.0 $21.0 $105.4 Tertiary Recovery Projects - $0.7 - $0.7 Facilities, Equipment & HSE $0.9 $7.5 $1.0 $9.4 Leasing& Land $10.0 - $5.0 $15.0 Midstream $18.0 - -
Slide 10: 2011 Capital Budget
2011 Capital Budget Capital Allocation by Commodity Capital Allocation by Region Capital Allocation by Activity Type Capital Allocation by Operatorship 10
Slide 11: Current Hedging Summary
Current Hedging Summary Current Production Hedged Crude Oil % of Current % of Current Avg. Floor Avg. Ceiling with Floor with Ceiling Price Price 2011 87% 87% $68.54 $104.69 2012 87% 87% $67.10 $112.03 2013 41% 41% $70.50 $120.00 NaturalGas % of Current % of Current Avg. Floor Avg. Ceiling with Floo
Slide 12: Marcellus Overview
Marcellus Overview Butler County (Operated) • 47,500 gross (34,000 net) acres • Joint Venture with Sumitomo in Butler County o 70% Rex / 30% Sumitomo o $2.4 million in Sumitomo drilling carries remaining • Butler Midstream Joint Venture o 60% Stonehenge / 28% Rex / 10% Sumitomo o Operationof40Mmcf/d
Slide 13: Marcellus Operated Overview
Marcellus Operated Overview Butler County, PA • 2011 Operational Assumptions Marcellus Operated Area in PA o Drilling the full year with one rig, and second rig by mid year o Plan to drill 25 gross (16 net) wells o Fracture and complete at least 24 gross (15 net) wells o Construction of the second c
Slide 14: Why Rex Values its Presence in Butler County
WhyRexValuesits Presence in in ButlerCounty Prospective Butler Units • Core acreage position of 30,500 gross (21,400 net) acres o Allows for minimal rig movement o Decreases in drilling time o Maximizes unitized acreage • Approximately 385 drilling locations • Favorable commodity price differentials
Slide 15: Butler Operated Drilling & Completion Schedule
Butler Operated Drilling & Completion Schedule Gross Well Net Well Rig Pad Count Count Status UDI 54 Drushel(1) 5.0 3.5 Fractured and placed in service four of the five wells UDI 54 Talarico 3.0 2.1 All wells drilled, awaiting fracture and completion in 2Q11 UDI 54 Grosick 7.0 3.0 Pilot holes drille
Slide 16: Marcellus Non-Operated Overview
Marcellus Non-Operated Overview Westmoreland, Clearfield and Centre Counties, PA Sizeable acreage position with 47,000 gross (19,000 net) acres 2011 Operational Assumptions Two rig program for the full year Plan to drill 20 gross (8 net) wells Fracture and complete at least 19 gross (8 net) wells Tr
Slide 17: Westmoreland & Clearfield Non Operated Drilling & Completion Schedule
Westmoreland & Clearfield Non Operated Drilling & Completion Schedule Gross Well Net Well County Rig Pad Status Count Count Awaiting fracture and Westmoreland H&P 287 Uschak #2 5.0 2.0 stimulation Drilled, awaiting fracture and Westmoreland H&P 287 Androstic 3.0 1.2 stimulation National Westmoreland
Slide 18: Conceptual Marcellus Economics
Conceptual Marcellus Economics (1) Butler County (Wet Gas) Assumptions Before Tax IRR • 2.5 MMcf/d IP Rate • 4.4 Bcfe gross EUR • $4.7 million drilling and completion costs • 15% royalties • Gas Price Basis Adjustment: $0.26/Mcf • NGL&condensate volumes:1.64gallonsperMcf (~39Bbls per MMcf) • NGL pri
Slide 19: Marcellus Well Cost Comparison
Marcellus Well Cost Comparison Reserve Well Economics •Average Well Cost of $4.7 million •AverageDrillingandCompletion cost- $1.9million •Average Frac Cost $ - 2.2 million •Average Equipment cost $0.6- million 1. Results from the 2010 Drilling Program 19
Slide 20: Niobrara Overview
Niobrara Overview ~56,000 gross (39,000 net) acres • 3 horizontal wells drilled (infill and Matrix Porosity DJ Basin results) Silo DJ Basin Niobrara Summary Field Rex Energy BJB #1H • Thick “Source Rock” – 300+ ft. Appears Non- Commercial • High total organic content (TOC’s) of 2-10% Rex Energy • St
Slide 21: Conceptual Niobrara Economics
Conceptual Niobrara Economics Niobrara Horizontal Well Assumptions Before Tax IRR • 300 Bbls/d IP • Gas sales start 18 months after oil sales • $4.2 million drilling and completion costs • 18% royalties • Oil price basis adjustment: -$9.00/Bbls • Gathering transportation & operating expenses: $13.05
Slide 22: Lawrence Field ASP Overview
Lawrence Field ASP Overview Illinois Basin ~13,100 gross (13,000 net) acres in Lawrence Field • 1 billion barrels of original-oil-in-place (OOIP) • Field has produced 400 MMBbls since 1906 • Water flooded in the 1950’s • Two successful surfactant-polymer flood pilots completed by Marathon with 15-20
Slide 23: ASP Conceptual Economics
ASP Conceptual Economics • Capital for the ASP plant has already been spent • 90% of future capital will be chemical costs • North & Central areas of the field have been analyzed to date (~75% of the field) o Identified 18targetcontinuous sandbodiesandbrokethesedowninto27separatefloodunits(15Bridgep
Slide 24: Why Invest in Rex Energy?
Why Invest in Rex Energy? • Operationally o Estimated annual production growth 95% of 71% in 2011 - o 74% of 2011 capital budget allocated to oil and liquids rich operating areas o Strong growth with a historical reserve CAGR of 75% o Preliminary Niobrara results o Additional potential in the Utica