  1. Slide 1: A Strategic Metals Exploration and Development Company

    A STRATEGIC METALS EXPLORATION AND IRON ORE DEVELOPMENT COMPANY COPPER CORPORATE PRESENTATION H1 2023 ZINC 1

  2. Slide 2: Forward-Looking Statements

    FORWARD-LOOKING STATEMENTS Certain information presented, including discussions of SAFE HARBOUR STATEMENT future plans and operations, contains forward-looking statements involving substantial known and unknown risks This report includes forward-looking statements covered by and uncertainties. These

  3. Slide 3: A Strategic Metals Exploration and Development Company

    A STRATEGIC METALS EXPLORATION AND DEVELOPMENT COMPANY • MetalQuest Mining (MQM) is a diversified exploration and development company focused on developing one of North America’s largest Iron Ore Projects located in Quebec’s Labrador Trough. • MQM has a senior exploration and financial management te

  4. Slide 4: Management and Technical Team

    Management and Technical Team Harry Barr, Chairman and CEO Gary Moore, MBA, BCom, Director Gordon Chunnett, Director Robert Guanzon, Chief Financial Officer Charlotte Brown, Corporate Secretary Faraz Rasheed, Business Development EIT Farid Mammadov, Marketing Manager LEADERSHIP INVESTED MANAGEMENT V

  5. Slide 5: Corporate Overview

    Corporate Overview Share Structure Share Price……………………………...….….. $0.135 Shares Outstanding…………………...…… 26,914,783 Warrants………………………………....…..... 0 Options…………………………………………… 3,695,000 Note: Approximate figures on June 6th, 2023 Management (~2000) 36% 64% Retail 5

  6. Slide 6: Two Metals, One Strategic Focus

    TWO METALS, ONE STRATEGIC FOCUS Lac Otelnuk Iron Ore Project, Labrador Trough, Quebec Murray Brook VMS Deposit, Bathurst Mining Camp, New Brunswick 6

  7. Slide 7: Lac Otelnuk Iron Ore Project

    LAC OTELNUK IRON ORE PROJECT Labrador Trough, Quebec, Canada 7

  8. Slide 8: Global Steel and Iron Ore Outlook

    Global Steel and Iron Ore Outlook • China’s annual steel production has surpassed that of the entire rest of the world • This is posing a severe future iron ore supply chain risks owing to geopolitical/economic uncertainty. • Projects in North America and Australia will have to be fast-tracked in or

  9. Slide 9: Iron Ore Demand Outlook

    • Overall demand for iron ore only poised to increase overtime since re-opening of the Chinese economy, accelerated development and industrialization in other Asian and African nations. • China will lead the demand outlook as well by a huge margin, including ramping up imports exponentially since it

  10. Slide 10: Project Outlook and Location

    Project Outlook and Location ➢ 100% owned by ➢ Lac Otelnuk Project is MetalQuest Mining surrounded by world class projects, including major producers Rio ➢ Approximately 165 Tinto, Tata Steel, km by air northwest Arcelor Mittal, and mid- of the village of tier Champion Iron. Schefferville which is l

  11. Slide 11: Lac Otelnuk Iron Ore Project History

    1948 • First recorded work on the property by Noranda/Conwest JV Lac Otelnuk Iron Ore Project History 11

  12. Slide 12: Property Description

    Property Description ➢ The structure is very simple apart from the far northern portion. The iron formation is generally northwest-southeast striking, very flat-lying, monoclinic to gently inclined and rolling, with an average easterly dip of 5°. ➢ The open pit is 11.6 km long and 2.8 km wide, reach

  13. Slide 13: Mineral Resource Estimate

    Mineral Resource Estimate ➢ 30Y composite samples has ➢ Open pit designed for this demonstrated concentrate project has a 30-year mine life grades with >68.5% iron with a only in the central project 27.6% weight recovery. location. Resource Tonnes Tfe Head DTWR Magnetic Fe Classification (in billion

  14. Slide 14: Historical 2015 Feasibility Report Economic Analysis

    Historical 2015 Feasibility Report Economic Analysis Description Units Results Production - Mineralization Mt 4,993 Production - Concentrate @ 68.5% Fe Mt 139,123.40 Revenue USD $B 135.8788 Capital Costs USD $B 14.1864 Operating Costs USD $B 42.3608 Pre Tax Cash Flow USD $B 79.1094 Before Taxes Afte

  15. Slide 15: Go-Forward Plan

    Go-Forward Plan Connect with Complete project First Nations to Establish a Joint due diligence, complete an Venture partner update database, MOU and to fund the and establish a contact Quebec project. technical team. government officials. 15

  16. Slide 16: Murray Brook Polymetallic VMS Project

    MURRAY BROOK POLYMETALLIC VMS PROJECT Bathurst Mining Camp, New Brunswick, Canada 16

  17. Slide 17: Murray Brook Zn-Pb-Cu (Ag) Project

    Murray Brook Zn-Pb-Cu (Ag) Project • Murray Brook polymetallic VMS deposit located in the world-class Bathurst Mining District, province of New Brunswick, Canada • Favourable metallurgy test work results • 2013 Updated Measured + Indicated Mineral Resources = 19 Mt @ 3.8% Zn+Pb+Cu • Positive 2013 Pr

  18. Slide 18: Murray Brook Property & Infrastructure

    Murray Brook Property & Infrastructure Bathurst District • Property consists of Mining Lease 252 and claim number 4925 • Mining Lease 252 has a 20-year term renewal for three 20-year periods • Ownership: ~28.2% MQM and 71.8% Votorantim Metals Canada Inc., subject to NSR • The Property is road access

  19. Slide 19: 2013 Updated Mineral Resource Estimates

    2013 Updated Mineral Resource Estimates MRE Prepared by P&E Mining Consultants Inc and reported at a cut-off of $21/t NSR The Mineral Resource estimation incorporates metal price, foreign exchange and NSR calculation as flows: • 3-year trailing average metal prices (US$) as of January 31, 2013: Zinc

  20. Slide 20: 2013 Preliminary Economic Assessment

    2013 Preliminary Economic Assessment Note: The potentially mineable portion of the Mineral Resource tonnage used in the PEA contains both Indicated and Inferred Mineral Resources. The reader is cautioned that Inferred Mineral Resources are too speculative geologically to have the economic considerat

  21. Slide 21: Next Steps at Murray Brook

    Next Steps at Murray Brook • Update 2013 Preliminary Economic Assessment o Update Mineral Resources for current metal prices and Puma drilling o Update Mineral Processing and Metallurgical Studies o Test remaining exploration targets • Complete Prefeasibility Study o Site Engineering and Hydrogeolog

  22. Slide 22: Go-Forward Plan

    Go-Forward Plan Lac Otelnuk Murraybrook -Complete project due diligence, update database, -Sell project. and complete in-house Project Report. -Connect with First Nations to complete an MOU and Corporate contact Quebec government officials. -Establish a Joint Venture partner to fund the -Continue to

  23. Slide 23: Thank You

    THANK YOU FOR MORE INFORMATION CONTACT US AT : 1-613-659-2773 info@mqmining.com SIGN UP TO RECEIVE COMPANY UPDATES : https://metalquestmining. com 23