  1. Slide 1: EPNG / Mojave 2019-20 Winter Preparedness

    KINDERJMORGAN EPNG / Mojave 2019-20 Winter Preparedness Kinder Morgan Western Region Pipelines October 31, 2019

  2. Slide 2: Agenda

    Operations Overview Emergency Communication Winter Preparedness Planning Maintenance Planning Process Remaining 2019 Planning Maintenance Gas Control Contacts 2

  3. Slide 3: Operations Overview

    KINDERJMORGAN Operations Overview

  4. Slide 4: EPNG system map and supply areas

    Rockies Supply Access San Juan Basin Midcontinent Supply Supply Access Rockies Supply ARIZONA Access California NEW MEXICO Albuquerque TEXAS Southern Arizona & CALIFORNIA Southwestern New Mexico Phoenix Permian Basin Supply Washington Tucson Ranch Storage El Paso Mexico Mexico Waha Production Areas

  5. Slide 5: EPNG system map with flow directions

    ARIZONA NEW MEXICO Albuquerque TEXAS CALIFORNIA Phoenix Washington Tucson Ranch Storage El Paso Waha Transport Flow Directions Compressor Stations Pipelines 5

  6. Slide 6: EPNG Total System

    EPNG Total System 2012-2019 Throughput Trends (MMcf/d) EPNG Total Throughput 6,000 5,500 ss Af SA V f a $ 6 Daily Average MMcf ES 8 iS) 3,500 3,000 2,500 2,000 dan 1feb 1. Mar 1Apr1-May aun ul 1-Aug 1Sep 1-0ct 1Nov — 1-Dec Mm 2012-2018 —=—=2017 =—=—=2018 ==—m=2019

  7. Slide 7: San Juan Basin

    San Juan Basin 2012-2019 Throughput Trends (MMcf/d) EPNG San Juan Basin Receipts 2,500 2,000 e & Ss Ss Daily Average MMcf 1,000 500 mmm 2012-2018 <=—=2017 ———=2018 mmm2019

  8. Slide 8: North Mainline

    North Mainline 2012-2019 Throughput Trends (MMcf/d) Daily Average MMcf North Mainline 2,500 2,000 1,500 1,000 500 1Jan 1Feb 1-Mar 1-Apr 1-May 1Jun A4ul 1-Aug 1-Sep 1-Oct 1-Nov 1-Dec Mm 2012-2018 —=—=2017 =—=—=2018 ==—m=2019

  9. Slide 9: Permian Basin

    Permian Basin 2012-2019 Throughput Trends (MMcf/d) Daily Average MMcf 4,500 4,000 3,500 3,000 + 2,500 2,000 1,500 1,000 500 EPNG Permian Basin Receipts mmm 2012-2018 =—=2017 ———=2018 —mmm2019

  10. Slide 10: South Mainline

    South Mainline 2012-2019 Throughput Trends (MIMIcf/d) Daily Average MMcf 3,000 2,500 2,000 1,500 1,000 South Mainline 1Jan 1feb 1-Mar 1-Apr 1-May 1Jun Atul 1-Aug 1-Sep 1-Oct 1-Nov 1-Dec Mm 2012-2018 —=—=2017 =—=—=2018 ==—m=2019 10

  11. Slide 11: Shipper and Stakeholder Mass Communication

    Shipper and Stakeholder Mass Communication EBB Notices Emails to shipper-maintained group email addresses Telephone message sent by EPNG to emergency contacts System Status Hotline (1-855-762-0100) parties can call for a recorded status of the system (updated as needed throughout an event) Standard

  12. Slide 12: Staffing and Local Facility preparation

    Staffing Gas Control is 24 x 7 x 365. Field technicians are on-site or on-call. Local Facility preparation (Begin about November 1st) Vehicle inspections – prepare vehicles for cold weather. Two-Way Radio functional tests Facility inspections with focus on weatherproofing. Heat tracing, heat lamps,

  13. Slide 13: Communication and Coordination; Operational Response

    Communication and Coordination Customer-specific winter preparedness meetings or communications. Monitor Weather Forecast. Conference Calls between Gas Control and Operations to discuss preparations. Shipper and Stakeholder Mass Communication via EBB notices and text messages. Shipper-Specific Commu

  14. Slide 14: Maintenance Planning Process and Communication

    Maintenance Planning Process and Communication

  15. Slide 15: Annual Maintenance Planning Process

    Annual Maintenance Planning Process July/August – Process Begins Review of annually recurring maintenance Development of Pipeline Integrity project list for the next year. Development of additional O&M and project related maintenance outages for the next year. October Gas Control preliminary review.

  16. Slide 16: Communication to Customers (continued)

    Communication to Customers (continued) Monthly Maintenance Monthly schedule posted 9 business days before the following month. Updated as required prior to and during the month. EBB EPNG - http://pipeportal.kindermorgan.com/PortalUI/DefaultB.aspx?TSP=EPNG Mojave - http://pipeportal.kindermorgan.com/

  17. Slide 17: Planned Maintenance Nov 2019 – Dec 2019

    Planned Maintenance Nov 2019 – Dec 2019

  18. Slide 18: Planned maintenance schedule Nov-Dec 2019

    San Juan Basin 7 3 1 6 2,5 4 Washington Permian Basin Ranch Reduction Waha Item Start Date End Date Location Unit Description (MMcf/d) 1 11/1/2019 11/4/2019 TOPOCK-MOJAVE 1204-1113 Line 1204 smart pig Hackberry to Franconia 713 2 11/5/2019 11/6/2019 MOJAVE STA Unit Mojave Unit(s) maintenance 117 3 1

  19. Slide 19: Gas Control Contacts

    KINDERJMORGAN Gas Control Contacts

  20. Slide 20: Gas Control Contacts

    Russ Pyeatt - Manager (719) 520-3729 (office) (505) 320-4556 (cell) russ_pyeatt@kindermorgan.com Dan English - Lead Controller (719) 520-4722 (office) (719) 659-3210 (cell) dan_english@kindermorgan.com Vic Villalva - Maintenance Planner (719) 520-4251 (office) (719) 482-6914 (cell) vic_villalva@kind