Chalice Mining Limited · ASX:CHN
Chalice Mining — Shareholder Meeting (November 2023)
35 slides from Chalice Mining's shareholder meeting presentation, Nov 23, 2023
Slide 1: 2023 Annual General Meeting
2023 Annual General Meeting 23 November 2023 ASX:CHN
Slide 2: Cautionary statements and competent person(s) disclosure
Cautionary statements and competent person(s) disclosure Authorisation Forward-Looking Statement This Presentation has been authorised for release by the Disclosure Committee. This Presentation may contain forward-looking statements and forward information, (collectively, forward-looking Disclaimer
Slide 3: Cautionary statements and competent person(s) disclosure (cont'd.)
Cautionary statements and competent person(s) disclosure (cont’d.) Reliance on Third Party Information The information in this Presentation that relates to Mineral Resources has been extracted from the ASX announcement The views expressed in this Presentation contain information that has been derive
Slide 4: Chalice is a leading ASX200 explorer-developer with a dual focus
Chalice is a leading ASX200 explorer-developer with a dual focus – the world-class Gonneville Project and the new West Yilgarn Province Our purpose – to find the metals needed to Our aspiration – to create a world class, multi-district decarbonise the world (the green metals) green metals province i
Slide 5: 2023 has seen challenging conditions for explorers and developers
2023 has seen challenging conditions for explorers and developers, with financial and geopolitical instability and weak commodity prices 12-month relative performance (A$/share, rebased to CHN) ASX : CHN PGM Producers₁ Palladium Price (LBMA) Nickel Price (LME) Ni/PGM Developers₂ 10.0 9.0 Gonneville
Slide 6: Our Strategy
Our Strategy 11
Slide 7: Our Strategy
Our Strategy 01 02 03 Generate New Discoveries Define New Resources De-Risk Development • Conceptualise, define and prioritise new • Turn new major discoveries into material • Define project scope and advance targets for potential major discoveries. deposits of resources and reserves. approvals, max
Slide 8: Our approach to sustainability
Our approach to sustainability Our Sustainability Vision and Pillars Deliver sustained shared value through responsible sustainability practices Strong Environmental Manage Climate Create Value for Healthy and Safe Stewardship Change Risk Stakeholders Workforce The Gonneville Project is located on 1
Slide 9: Key value drivers and priorities
Key value drivers and priorities Gonneville Project optimisation 01 • Upside opportunities on feed grade and metallurgical recoveries being investigated in the initial phase of the Pre-Feasibility Study • Modelling of higher-grade, staged open-pit starter cases adopting a higher cut-off grade Strate
Slide 10: Market Outlook
Market Outlook 15
Slide 11: New discoveries are becoming increasingly rare just when the world needs more critical minerals
New discoveries are becoming increasingly rare just when the world needs more critical minerals – we must explore, discover and develop Post WWII boom and new Rise of China and surge in 60 modern exploration tools exploration expenditure (11x) 50 ~60% drop in 40 exploration expenditure and shallow ‘
Slide 12: The need to decarbonise the global economy will underpin demand for green metals
The need to decarbonise the global economy will underpin long-term demand for green metals like nickel, copper, cobalt and PGEs Electric Hybrid Energy Semi- Wind & Importance of metals Hydrogen Vehicles Vehicles Storage conductors Solar PV Nickel and Cobalt • Key industrial and electrification metal
Slide 13: The case for hybrid electric vehicles is growing
The case for hybrid electric vehicles is growing – the ‘best of both worlds’ solution will drive strong demand for battery metals and PGEs • Sales of battery electric vehicles (BEVs) are growing at 16% p.a., whilst sales of plug-in hybrid Electric vehicle sales, September 2022-2023 (‘000s) electric
Slide 14: Platinum and Palladium are essential in every stage of the hydrogen value chain
Platinum and Palladium are essential in every stage of the hydrogen value chain, a critical solution to achieving net-zero carbon economy Production Transport and Storage Utilisation Green hydrogen produced by electrolysis of Long-term storage and transport of green Green hydrogen ideal for use in g
Slide 15: Gonneville Project
Gonneville Project Project update and priorities
Slide 16: Gonneville Ni-Cu-PGE Project Overview
Gonneville Ni-Cu-PGE Project Overview A new long-life, low-cost, low-carbon green metals project in Western Australia A globally significant magmatic sulphide Resource ~70km from Perth: • 560Mt @ ~0.54% NiEq or 1.7g/t PdEq for ~3.0Mt NiEq or 30Moz PdEq1 contained – deposit remains open at depth • St
Slide 17: Gonneville is positioned to become a strategic asset for Australia and the western world
Gonneville is positioned to become a strategic asset for Australia and the western world, given its rare palladium-nickel-cobalt content Gonneville is the first major PGE discovery in Australia Global Palladium and Nickel Primary Supply Market Share (2022)3 and one of the few recent large-scale magm
Slide 18: Gonneville scoped to be 2nd quartile on the PGE industry cost curve
Gonneville scoped to be 2nd quartile on the PGE industry cost curve – PGE basket price needs to be >US$1,600/oz to sustain current market PGE Industry Cost Curve – Net total cash costs per 4E oz (after by-product credits), CY2022, US$/oz2 Quartile 1 Quartile 2 Quartile 3 Quartile 4 2,000 Avg AISC of
Slide 19: Unlocking the full value of Gonneville through upside opportunities
Unlocking the full value of Gonneville through upside opportunities in mining, processing and commercial areas is underway [Orange] = Near term priorities Assessed upside potential • Early high-grade underground mining in parallel to open-pit phase and block/sub-level caving options • Selectivity, e
Slide 20: The rare, tier-1 scale Gonneville Resource has high-grade optionality
The rare, tier-1 scale Gonneville Resource has high-grade optionality and compelling growth potential Mineral Resource Estimate1: Gonneville Nickel Equivalent Grade-Tonnage Curve in-pit (on NiEq cut-off grade basis) • 560Mt @ 0.88g/t 3E (Pd+Pt+Au), 800 1.7 1.8 0.16% Ni, 0.09% Cu, 0.015% Co COG range
Slide 21: High-grade base metal rich mineralisation near surface is targeted with starter cases
High-grade base metal rich mineralisation near surface is targeted with the starter cases currently being modelled Gonneville hosts a range of sulphide mineralisation styles, starting near surface: • High-Sulphide / base metal-rich mineralisation (>1.0% NiEq, 20-100 vol% sulphide) • Low-Sulphide PGE
Slide 22: The Resource remains open down-dip
The Resource remains open down-dip, with ongoing drilling demonstrating potential for material growth of the deposit • Residual Resource unmined beyond Study 3D view (looking SSW) of Gonneville Intrusion, >0.8% NiEq Resource blocks and drilling modelled life of 90-200Mt for 540-1,100kt contained NiE
Slide 23: Phasing of the process flowsheet configuration is being evaluated in the PFS
Phasing of the process flowsheet configuration is being evaluated in the initial phase of the PFS Sizing Grinding Oxide feed bypasses flotation and goes to leach circuit – 75% Pd and 90% Au overall recovery from oxide modelled Oxide feed Potential to drop copper flotation stage to maximise metal rec
Slide 24: Regional Exploration
Regional Exploration
Slide 25: Gonneville Resource occupies just ~2km of the >30km long Julimar Complex
Gonneville Resource occupies just ~2km of the >30km long Julimar Complex – regional drilling expected to commence in the coming weeks 3D view (looking ESE) of the Julimar Complex, Gonneville Resource and soil geochemistry Gonneville Project Torres Target (untested) • ~2km long section of the Julimar
Slide 26: Ramping up an expansive regional exploration program
Ramping up an expansive regional exploration program in late 2024 – >10 new high-priority greenfield targets to be drilled across the province Barrabarra Project ~1,200km long western margin of the Yilgarn craton is Development Project highly prospective for orthomagmatic Ni-Cu+/-PGE Barrabarra Nick
Slide 27: Gonneville starter cases, regional drilling and partnering represent potential catalysts
Gonneville high-grade starter cases, regional exploration drilling and the ongoing strategic partnering process represent potential catalysts Milestones achieved to date Forward Plan1 Regional exploration drilling Strategic partnering process Pre-Feasibility Study (target completion in mid 2025) Gon
Slide 28: Summary: Key value drivers and priorities
Summary Key value drivers and priorities Chalice owns 100% of a new Gonneville Project optimisation – investigating long-life, low-cost, low-carbon green metals project in WA 01 upside to Scoping Study metrics Strategic partnering – aim to attract a potential 02 Chalice’s team has a track record par
Slide 29: Slide 29
Slide 30: Thank you
Thank you Conclusion of meeting chalice-mining @ChaliceMining www.chalicemining.com
Slide 31: Appendix
Appendix
Slide 32: Gonneville Mineral Resource Estimate (JORC Code 2012), March 2023
Gonneville Mineral Resource Estimate (JORC Code 2012), 28 March 2023 Cut-off Domain Category Mass Grade Contained Metal Grade Pd Au NiEq PdEq Pd Pt Au NiEq PdEq (Mt) Pt (g/t) Ni (%) Cu (%) Co (%) Ni (kt) Cu (kt) Co (kt) (g/t) (g/t) (%) (g/t) (Moz) (Moz) (Moz) (kt) (Moz) Measured - - - - - - - - - -
Slide 33: Higher-grade sulphide component of Gonneville Resource
Higher-grade sulphide component of Gonneville Resource (in pit and underground), 28 March 2023 Cut-off Domain Category Mass Grade Contained Metal Grade Pd Au Co NiEq PdEq Pd Pt Au NiEq PdEq (Mt) Pt (g/t) Ni (%) Cu (%) Ni (kt) Cu (kt) Co (kt) (g/t) (g/t) (%) (%) (g/t) (Moz) (Moz) (Moz) (kt) (Moz) Mea
Slide 34: Metal equivalent assumptions of Gonneville Resource
Metal equivalent assumptions of Gonneville Resource, 28 March 2023 Based on metallurgical testwork completed to date for the sulphide domain, it is the Company’s opinion that all the quoted elements included in metal equivalent calculations (palladium, platinum, gold, nickel, copper and cobalt) have
Slide 35: Visit our website and sign up to receive our latest news
Visit our website and sign up to receive our latest news chalice-mining @ChaliceMining www.chalicemining.com Level 3, 46 Colin Street West Perth WA 6005, Australia +61 8 9322 3960 info@chalicemining.com ABN 47 1 16 648 956