Vision Lithium, Inc. · TSXV:VLI
Vision Lithium — Investor Presentation (January 2018)
27 slides from Vision Lithium's investor presentation, Jan 31, 2018
Slide 1: Corporate Presentation
Corporate Presentation BATTERY MINERAL EXPLORATION JANUARY 2018
Slide 2: Forward Looking Statement
TSXV: VLI — visionlithium.com 2 JANUARY 2018 FORWARD LOOKING STATEMENT Caution regarding forward-looking information: This presentation certain “forward-looking statements” under applicable Canadian securities legislation. Forward-looking statements include, but are not limited to, statements with r
Slide 3: Vision Lithium Focused on Battery Mineral Exploration
TSXV: VLI — visionlithium.com 3 JANUARY 2018 VISION LITHIUM FOCUSED ON BATTERY MINERAL EXPLORATION • A junior exploration company focused on exploring and developing high quality battery mineral assets in safe jurisdictions, primarily Canada • Led by skilled and qualified mineral exploration and bus
Slide 4: Mining Properties
TSXV: VLI — visionlithium.com 4 JANUARY 2018 Mining Properties Sirmac Dome Lemieux Surface Properties Claims Ownership polygon (Ha) Sirmac 24 100% 1,100 Dome 225 100% 12,056 Lemieux
Slide 5: Corporate structure
TSXV: VLI — visionlithium.com 5 JANUARY 2018 Corporate JANUARY 29, 2018 Shares issued 77,338,570 structure Warrants Options 43,297,500 4,312,500 Fully diluted 124,948,570 Market capitalization $52 Million Share price $0.67 52-week low $0.175 52-week high $0.79
Slide 6: Management and Board of Directors
TSXV: VLI — visionlithium.com 6 JANUARY 2018 MANAGEMENT AND BOARD OF DIRECTORS YVES J. ROUGERIE, B.SC., GEO. President and Chief Executive Officer (Val-d’Or, Quebec) Yves Rougerie, P.Geo. is a graduate of the University of Quebec in Earth Sciences and brings 35 years of experience in the mining expl
Slide 7: Robert C. Bryce, Director
TSXV: VLI — visionlithium.com 7 ROBERT C. BRYCE, ING., MBA Director (Val-d’Or, Quebec) Robert C. Bryce, P.Eng., MBA is a graduate of the University of Toronto (B.Sc. Mining Engineering 1960) and of Western University (MBA 1964) withmore than 50 years of practical and executive mining experience at a
Slide 8: Property One: Sirmac Lithium Project
TSXV: VLI — visionlithium.com 8 PROPERTY ONE SIRMAC LITHIUM PROJECT
Slide 9: Property location
TSXV: VLI — visionlithium.com 9 JANUARY 2018 Property location
Slide 10: Sirmac Definitive Agreement
TSXV: VLI — visionlithium.com 10 JANUARY 2018 SIRMAC DEFINITIVE AGREEMENT On December 14, 2017, ABE Resources announced the signing of a definitive asset purchase agreement for a 100% undivided interest in the Sirmac Lithium Property from Nemaska Lithium Inc. — ABE to issue $250,000 cash payment and
Slide 11: Sirmac Lithium project
TSXV: VLI — visionlithium.com 11 JANUARY 2018 Sirmac Lithium project 1 The Sirmac Property consists of 24 mining claims 3 The campaign was very successful with multiple (1,100 hectares) located about 180km NW of intersections over 2% Li2O. One hole intersected Chibougamau, in the province of Québec
Slide 12: Nemaska Lithium drilling results
TSXV: VLI — visionlithium.com 12 JANUARY 2018 Nemaska Lithium drilling results Some of the best diamond drill hole results from Dyke #5 included: •SIR-12-01: 1.30% Li2O over 35.05 m, including 2.30% Li2O over 12.35 m •SIR-12-03: 1.19% Li2O over 32.35 m, including 2.06% Li2O over 9.0 m •SIR-12-17: 1.
Slide 13: Nemaska Lithium drilling results
TSXV: VLI — visionlithium.com 13 JANUARY 2018 Nemaska Lithium drilling results The Laurisha Extension (West of Dyke #5). Three holes were drilled: •SIR-12-18: 1.27% Li2O over 5.7 m •SIR-12-19: 1.50% Li2O over 4.1 m •SIR-12-20: 1.69% Li2O over 5.0 m On the North Extension of Dyke #5, a total of 12 ho
Slide 14: Historical resource estimate
TSXV: VLI — visionlithium.com 14 JANUARY 2018 Historical resource estimate Cut-Off Grade Category To n n a g e ( t ) ( 1 ) ( 3 ) Average Grade A v e r a g e G r a d e Ta 2 O 5 (1)(2) Li2O%(1) Li2O%(1) (ppm) (1)(4) 0.50 Measured 185,000 1.40 70 0.50 Indicated 79,000 1.40 80 0.50 Inferred 40,000 1.10
Slide 15: Exploration plan
TSXV: VLI — visionlithium.com 15 JANUARY 2018 • Conduct close-spaced high resolution Mag Exploration survey to better define the geometry and extent of the numerous pegmatite dykes on plan the property • Plan drill program to confirm known mineralization and test other dyke potential • Metallurgy to
Slide 16: Property Two: Dôme Lemieux Copper Project
TSXV: VLI — visionlithium.com 16 PROPERTY TWO DÔME LEMIEUX COPPER PROJECT
Slide 17: Property location
TSXV: VLI — visionlithium.com 17 JANUARY 2018 Property location
Slide 18: Dôme Lemieux project
TSXV: VLI — visionlithium.com 18 JANUARY 2018 Dôme Lemieux project 1 The Dome Lemieux property consist of 225map- 3 Easy road access by way of the main highway designated claims totaling 12,056ha, an area of >120 square kilometers. — Recently 16 more (908 ha) have been added The property is located
Slide 19: Dôme Lemieux project
TSXV: VLI — visionlithium.com 19 JANUARY 2018 Dôme Lemieux project 5 Large land package never been consolidated into one 7 Mineralization presents different characteristics that company, ABE now has a view of the entire are likely related to different genesis. mineralization and structural system —
Slide 20: Dôme Lemieux project: two-phase exploration program
TSXV: VLI — visionlithium.com 20 JANUARY 2018 Dôme Lemieux project A TWO-PHASE EXPLORATION PROGRAM IS PLANNED Phase I: Phase II: • Verification and assaying if necessary of the • 2,225 m drilling program on Big Pioneer, Dionne, Vein #6, Véronique, Guillaume, Eagle Gaspésie and Ruisseau de remaining
Slide 21: Lithium Ion Batteries
TSXV: VLI — visionlithium.com 21 LITHIUM ION BATTERIES BATTERY MINERALS SUPPLY DEMAND
Slide 22: Mega factories under construction
TSXV: VLI — visionlithium.com 22 Mega factories under construction BENCHMARK MINERALS OCTOBER 2017
Slide 23: Battery Grade Lithium 2017-2021 Phase 1 of Lithium Ion Battery Growth
TSXV: VLI — visionlithium.com 23 BATTERY GRADE LITHIUM 2017 - 2021 PHASE 1 OF LITHIUM ION BATTERY GROWTH BENCHMARK MINERALS OCTOBER 2017
Slide 24: Battery Grade Lithium 2021-2026: The Path to 650GWh
TSXV: VLI — visionlithium.com 24 BATTERY GRADE LITHIUM 2021-2026: PHASE 1 + PHASE 2 = THE PATH TO 650GWH BENCHMARK MINERALS OCTOBER 2017
Slide 25: Battery Grade Lithium Salts Prices Global Scenario
TSXV: VLI — visionlithium.com 25 BATTERY GRADE LITHIUM SALTS PRICES GLOBAL SCENARIO BENCHMARK MINERALS AUGUST 2017
Slide 26: Copper Supply Shortage Predicted
TSXV: VLI — visionlithium.com 26 COPPER SUPPLY SHORTAGE PREDICTED HUDBAY DECEMBER 2017 • Copper market moves into a significant deficit anticipated near the end of the decade after last of new supply absorbed
Slide 27: Thank You
TSXV: VLI — visionlithium.com 27 Thank You CONTACT US AT 819 874 6200 YROUGERIE @ VISIONLITHIUM . CA
Vision Lithium — Investor Presentation (January 2018) on 6ix