Edison International · NYSE:EIX

Edison International — Q1 2008 Earnings Presentation

15 slides from Edison International's earnings presentation, May 8, 2008

  1. Slide 1: First Quarter 2008 Financial Teleconference

    Exhibit 99.2 Leading First Financial May EDISON8, Quarter 2008 the INTERNATIONAL® Teleconference Way 2008in ElectricitySM

  2. Slide 2: Forward-Looking Statements

    Leading Forward-Looking Statements not differ International’s represent EDISON 1 purely materially the our INTERNATIONAL® historical, contained Way expectations 2007 from inStatements ElectricitySM Form are in current this forward-looking 10-K only presentation expectations. as and ofother the date

  3. Slide 3: First Quarter Earnings Summary

    Leading First GAAP Reported $0.91 $1.01 $333 Net Core1 ($ $0.92 $0.90 $304 $299 EPS 1Q 1 operations EDISON 2 GAAP millions) 07 Income Quarter 1Qthe earnings EPS INTERNATIONAL® 08 and Way Earnings other inper ElectricitySM non-core share Summary refers items. to basic earnings per share. See slide 3

  4. Slide 4: EIX Core EPS Variances 1Q08 vs 1Q07

    Leading EIX Non-core Total Basic Diluted Core Midwest EMG EMMT2 Homer Edison Lower Income Higher Non-Core SCE 1 ($0.01) March 2 3 Seeparent EDISON$Earnings 1Q EPS1 Non-Core Use EPS 0.48 0.01 0.45 0.10 net generation gains 31, gross income City EME Capital EMMT from EPS the 07: Generation Items Varia

  5. Slide 5: Midwest Generation Operating Performance

    Leading •Midwest Operating Total Equivalent Capacity Load Forced All-in 1Q $14.08 $42.16 $56.24 $12.63 $39.68 $52.31 $0 $20 $40 $60 $/MWh Average 1 2 4 Generation Higher 07Generation EDISONFactor Average average vs. 1Q Outage Includes the realized load Generation Factor 1Q 08 Statistics Availability

  6. Slide 6: Homer City Operating Performance

    Leading •Homer Operating Total Equivalent Capacity Load Forced All-in 1Q $58.42 $35.85 $22.57 $59.72 $37.91 $21.81 $60 $40 $20 $0 $/MWh Average 1 2 5 Generation 07Generation EDISONFactor Average average vs. 1Q City Outage Includes the realized Factor 1Q 08 Statistics Availability Way –93.3 Averagelo

  7. Slide 7: EMG Hedge Status

    Leading EMG Status Energy Remainder 2008 Megawatt Load Estimated Homer Total Average Coal 1 the affect 2 Midwest per 3 been EDISON 6 The time MWh lower under 2009 estimated Requirement Hedge retail amount average atCity Only of the Price March Generation INTERNATIONAL® represents Hours MWh1 2010 day

  8. Slide 8: EIX Liquidity Profile

    Leading Liquidity EIX Sources Credit Cash Available 1 2 7 Parent &Facility EDISON Total short ($ the Profile SCELiquidity inWay amounts Millions) term $ 2,500 (availability) ininvestments2 amount at $ Electricity 2,166 March do $SCE 1,100 not$$EMG includes INTERNATIONAL® 31, imply 2,159 1,883 SM $ 2

  9. Slide 9: Reconciliation of Core Earnings and 2008 Guidance

    Leading Reconciliation Core Non-Core Southern Edison Total EIX The 2008 the Assumptions 11.5% Forward prices EMMT Lower $75M EMG’s Excludes Other projects and 1 share EDISON 8 See high non-core current parent core GAAP EPS1 Earnings Guidance Core Non-Core for Use as Return pre-tax Mission Sycamore p

  10. Slide 10: Appendix

    Leading the EDISON Appendix 9 INTERNATIONAL® Way in ElectricitySM

  11. Slide 11: EMG 1Q Comparative Information

    Leading EMG 1Q Midwest Total Energy Load Homer Generation Equivalent Performance Forced Pricing Average Flat EDISON 10 07 Energy 8,630 Requirement Comparative 1Q City Outage Only Information the Realized Cost Generation INTERNATIONAL® 08 Availability (in 8,383 Price Way contracts Contracts Variance

  12. Slide 12: EMG Capacity Status

    Leading EMG Status Apr Midwest Installed Less: Net Fixed Non-unit •Variable Total Average 1 2 3 megawatt purchasing EDISON 2008. 11Net Price Capacity Expected Actual Load During Capacity 1,Capacity Net Capacity Price at 2008 per requirements the Price Capacity contract March Capacity Homer 1Q Specif

  13. Slide 13: EMG Wind Development Platform

    Leading Washington Wyoming Iowa Minnesota Coal New Operating Wind Under Pipeline Natural MW 1 2 3 EDISON 12Natural Owned Contract York Mexico 5,471 Wind (Pipeline) (UC) 566 Development Construction Gas the 4,992 or INTERNATIONAL® gas Wind 5Platform1 Wind award Wind MW 145 19 150 70 67 Other under Wa

  14. Slide 14: EMG Reconciliation of EBITDA

    Leading EMG Reconciliation Net Addback Discontinued Interest Income Depreciation EBITDA1 Production Adjusted 1 2 13 income EDISON– Production See First from expense income taxes the (Deduct): EBITDA1 331 tax $Use Way Quarter and continuing 77 operations 159 to credits2 350 (30) of 91 83 in amortizat

  15. Slide 15: Use of Non-GAAP Financial Measures

    Leading Use Edison and accurately EPS share. securities principal operating EBITDA gain evaluating A referenced EDISON 14reconciliation Exchange EPS of on byNon-GAAP International’s the principal the by operating is INTERNATIONAL® subsidiary (vested compare EMG. in sale defined principal Way the Com

Edison International — Q1 2008 Earnings Presentation on 6ix