Kinder Morgan, Inc. · NYSE:KMI

Kinder Morgan — Kinder Morgan Energy Partners — Credit Suisse 2008 Energy Summit

26 slides from Kinder Morgan's conference presentation, Feb 6, 2008

  1. Slide 1: Credit Suisse 2008 Energy Summit

    Credit Suisse 2008 Energy Summit February 6, 2008

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements This presentation contains forward looking statements, including these, within the meaning of Section 27A of the Securities Act of 1933, as amended and Section 21E of the Exchange Act of 1934, as amended. Forward looking statements are not guarantees of performance. They i

  3. Slide 3: Use of Non-GAAP Financial Measures

    Use of Non-GAAP Financial Measures This presentation utilizes the non- non-generally accepted accounting principles financial measures of segment segment distributable cash flow, KMP distributable cash flow, and earnings before interest, taxes and DD&A (“(“EBITDA” EBITDA”). For KMP overall, we defin

  4. Slide 4: Capital Structure

    Capital Structure Kinder Morgan Energy Partners, L.P. Market Equity (a) $14.0B Debt (b) 7.0B Enterprise Value $21.0B 2008E EBITDA (c) $2.5B 2008E DCF (d) $1.8B Additional Cash Incentive Shares Distribution Distribution KMR KMP (LLC) (Partnership) 72 million i- i-units (a) 176 million units (a) 62M 1

  5. Slide 5: The Kinder Morgan Strategy

    The Kinder Morgan Strategy Same Strategy Since Inception Focus on stable, fee-based assets which are core to the energy infrastructure of growing markets Increase utilization of assets while controlling costs  Classic fixed cost businesses with little variable costs  Improve productivity to drop a

  6. Slide 6: Unmatched Footprint

    Unmatched Trans Footprint Mountain 2 Cochin Largest independent transporter 2 of petroleum products in the U.S. Pacific  Transport more than 2 million barrels per day (Bbl/d) 2nd largest transporter of natural Trailblazer 2 gas in U.S. (a) REX 3 2  Approximately 22,000 miles of Northern REX inters

  7. Slide 7: Well-diversified Asset Base

    Well-diversified Asset Base KMP CO2 2008 DCF Natural Gas Pipelines 32% CO2 transport and sales Profile (b) 47% Texas Intrastate 68% oil production related 53% Rockies Production hedged (a): Little incidental commodity risk CO2 Natural Gas 2008=83% ($44/Bbl) 28% Pipelines 2009=73% ($49) 27% 2010=71%

  8. Slide 8: Eleven Years of Consistent Growth

    Eleven Years of Consistent Growth Total Distributions (GP + LP) ($mm) LP Distribution Per Unit (b) $2,000 $1,843 $4.50 $4.24-$4.32 GP (a) $1,750 $4.00 $3.68 % LP $1,469 $3.50 R = 17 $3.20 $3.32 $1,500 8% CAG $2.96 =4 $1,265 $1,162 $3.00 $2.72 GR $1,250 $2.50 $1,000 CA $827 $978 $2.50 $1.90 $2.20 $70

  9. Slide 9: Significant Historical Returns

    Significant Historical Returns (a) KMP: 29% CAGR (b) KMR: 14% CAGR (c) Dollars Dollars $1,800 $300 $1,721 Alerian $267 MLP Index $1,500 $260 KMP $240 KMR $1,200 $220 $900 $180 $578 $600 $140 $124 Alerian MLP Index $300 $223 $100 S&P 500 S&P 500 $0 $60 1996 1997 1998 1999 2000 2001 2002 2003 2004 200

  10. Slide 10: Promises Made, Promises Kept

    Promises Made, Promises Kept Promises Made Promises Kept Budgeted Actual Distribution per unit: Distribution per unit: 2000: $1.60 2000: $1.71 2001: $1.95 2001: $2.15 2002: $2.40 2002: $2.435 2003: $2.63 2003: $2.63 2004: $2.84 2004: $2.87 2005: $3.13 2005: $3.13 2006: $3.28 2006: $3.26 2007: $3.44

  11. Slide 11: 2008 Partnership Goals

    2008 Partnership Goals Distribution Target  $4.02 per unit (16% growth)  Excess coverage of ~$12 million Maintain Solid Balance Sheet  Expansions / acquisitions financed 50% equity, 50% debt Deliver Projects on Time and on Budget 11

  12. Slide 12: Growth Opportunities

    Growth Opportunities Current Projects (2008-2011) Additional Opportunities Shifting Natural Gas Supply Sources REX Northeast extension, REX/NGPL — Rockies Rockies Express pipeline Chicago project, MEP expansion, KMLP — LNG KM Louisiana pipeline expansion, storage, incremental shipper — Barnett Shale

  13. Slide 13: Shifting Natural Gas Supply Sources

    Shifting Natural Gas Supply Sources Natural Gas Supply % Production Volumes (Bcf/d) 2007E 2013 Change Change Rockies Natural Gas (a) 8.6 11.4 2.8 33% Rockies Barnett Shale Natural Gas (b) 2.1 6.4 4.3 200% production Gulf Coast LNG Imports (a) 0.7 2.8 2.1 300% expected to increase 33% 2007-2013 (a) B

  14. Slide 14: Newbuild Natural Gas Pipelines

    Newbuild Natural Gas Pipelines Wyoming Nebraska Indiana Ohio Illinois Colorado Kansas Missouri Oklahoma ROCKIES EXPRESS PIPELINE IN-SERVICE Mississippi ROCKIES EXPRESS PIPELINE Alabama MIDCONTINENT EXPRESS PIPELINE Texas Texas Louisiana KM LOUISIANA PIPELINE KM HEADQUARTERS Rockies Midcontinent KM E

  15. Slide 15: Increased Use of Renewable Fuels

    Increased Use of Renewable Fuels Renewable Fuels Standard (a) New legislation approximately doubles required use of 40 36.0 renewable fuels over next several years; increases Incremental Impact of EISA - 2007 35 EPACT - 2005 even more dramatically long- long-term 30 R CAG (billion Gal/yr) 25 .5 % 2

  16. Slide 16: Growing Crude Production from Canadian Oilsands

    Growing Crude Production from Canadian Oilsands WCSB Crude Production by Type (a) Heavy/Light Crude Differential (b) WTI vs. Mayan Crude Spot Price 4 $20 Oilsands -‘15 Condensate AG R ‘07 ~12 %C 3 Conventional Heavy il sa nds $15 O (MMBbl/d) Conventional Light 3.0 MMBbl/d ($/Bbl) 2 1.2 MMBbl/d $10 O

  17. Slide 17: High Oil Prices Mean Opportunities for Enhanced Oil Recovery

    High Oil Prices Mean Opportunities for Enhanced Oil Recovery CO2 Deliveries McElmo Dome 1,500  Premiere Source of CO2 in U.S. Other  ~22 years remaining deliverability  45% KM working interest (37% net revenue (MMcf/d) 1,000 Sheep Mtn interest)  9.5 Tcf of remaining reserves (30 Tcf OGIP) Bravo

  18. Slide 18: Increased Production and Use of Heavy Crude

    Increased Production and Use of Heavy Crude North American Petcoke Production (a) Refiners are converting to handle 120 Rest of N. America 102 heavier crude; Oilsands, South -‘1 GR 100 U.S. Gulf Coast America… (mm dry short tons) ‘07 CA 5 % 80 … Heavier, sour crude produces 8.5 66 60 43 45 49 51 52

  19. Slide 19: Coal Imports/Exports

    Coal Imports/Exports Our terminals are well-positioned on coasts and inland waterways to handle either export or import coal U.S. Coal Imports/Exports (a) Coal Imports 120 111 Appalachian coal production declining, U.S. Coal Imports U.S. Coal Exports 100 93 affecting Eastern Utilities 86 (millions o

  20. Slide 20: Current Projects

    Current Projects Over $7.0 Billion In Current Projects Estimated Project Expected Project Cost ($mm) Completion Rockies Express $2,445 (a) 2007-2009 Midcontinent Express 660 (a) 2009 KM Louisiana Pipeline 510 2009 CALNEV expansion 425 2011 Trans Mountain – Anchor Loop expansion 460 2008 CO2 – SACROC

  21. Slide 21: ~$15 Billion in Capital Invested To Date

    ~$15 Billion in Capital Invested To Date (a,b) ($ billions) Total Invested by Type (a,b) $9.0 $8.2 Total Invested by Year (a) $6.5 $3.5 $6.0 REX/MEP $3.3 $3.3 Expansion $3.0 $3.0 Acquisition $2.5 $0.0 Acquisitions Expansions $2.0 $1.9 $1.6 Total Invested by Segment (a,b) $1.5 $1.3 $1.3 $1.3 $5.0 $1.

  22. Slide 22: Returns on Capital

    Returns on Capital 2000 2001 2002 2003 2004 2005 2006 2007 Segment ROI (a): Products Pipelines 11.9% 11.8% 12.8% 12.9% 12.4% 11.6% 11.8% 13.2% Natural Gas Pipelines 13.3 15.5 12.9 13.5 14.0 15.5 16.7 17.6 CO2 27.5 24.6 22.0 21.9 23.8 25.7 23.1 21.8 Terminals 19.1 18.2 17.7 18.4 17.8 16.9 17.1 15.8 T

  23. Slide 23: Balance Sheet Has Remained Solid

    Balance Sheet Has Remained Solid Credit Summary L-T Debt Rating Baa2/BBB 2008 Budget Estimates Debt / EBITDA (a) 3.3x EBITDA / Interest 5.4x CP Capacity (b) Long-term Debt Maturities (b) Total Bank Credit $1,850 2008 $5 Less: 2009 $250 Outstanding CP 589 2010 $250 Letters of Credit 538 2011 $700 Exc

  24. Slide 24: Risks

    Risks Regulatory  Pacific Products Pipeline FERC/CPUC case  Periodic rate reviews  Unexpected policy changes CO2 Crude Oil Production Volumes Construction Cost Overruns Environmental Terrorism Interest Rates  Approximately 50% floating rate debt  Budget assumes flat rates at a level above the c

  25. Slide 25: Summary

    Summary Stable Cash Flow  Own assets core to energy infrastructure Internal Growth Opportunities  Critical Mass  Well-located assets/favorable demographics KMP/KMR: Fixed Cost Business 6-7% Yield  Drop growth to bottom line and Unique Structure 8%  Tax Efficient Long-Term  Incentive Fee Growth

  26. Slide 26: ‘d1 ‘SUANLYWd ADYANA

    ‘d1 ‘SUANLYWd ADYANA NVSUOW 7 dSaqNnyI

Kinder Morgan Energy Partners — Credit Suisse 2008 Energy Summit on 6ix