Pure Gold Mining Inc

Pure Gold Mining — Investor Presentation (April 2017)

30 slides from Pure Gold Mining's investor presentation, April 2017

  1. Slide 1: April 2017 PGM:TSX-V

    April 2017 PGM:TSX-V

  2. Slide 2: Forward Looking Statement

    FORWARD LOOKING STATEMENT Cautionary Statement on Forward-Looking Information & Statements This presentation contains certain forward-looking information and statements which may not be based on fact, including without limitation, statements regarding the Company’s expectations in respect of its fut

  3. Slide 3: A Fresh Look at a Historic Producer

    Pure Gold Mining A FRESH LOOK AT A HISTORIC PRODUCER JURISDICTION Red Lake, Ontario, Canada – an established mining district with more than 28 million ounces of high grade gold produced to date (1) One of the highest grade undeveloped deposits in the world (2) with HIGH GRADE currently defined resou

  4. Slide 4: Direct Red Lake Experience

    Pure Gold Mining DIRECT RED LAKE EXPERIENCE Management & Technical Team Board of Directors Darin Labrenz, President, CEO & Director Graeme Currie, Chairman • Former VP Business Development, Terrane Metals Corp. • Former Director, Investment Banking at Canaccord Genuity • Former Chief Geologist, Plac

  5. Slide 5: Capital Structure

    Pure Gold Mining CAPITAL STRUCTURE Capital Structure (as at April 3, 2017) Key Shareholders (2) Shares Outstanding 191.5 million Management & Directors 4.7% Options Outstanding 13.0 million Strategic Shareholders 27.3% Weighted average exercise price $0.34 AngloGold Ashanti 10.8% Evanachan Ltd. (Rob

  6. Slide 6: 2017 Focus on Growth

    Pure Gold Mining 2017 FOCUS ON GROWTH 70,000m of drilling in fully funded Phase I exploration program Aggressive Resource Expansion Close to Infrastructure • Grow resource and improve PEA metrics • Four diamond drill rigs active and focused on resource expansion in McVeigh, Austin and A3 targets at

  7. Slide 7: Red Lake Mining District

    Red Lake Mining District HIGHEST GRADE GOLD BELT IN CANADA +28 million oz high-grade gold mined in Red Lake to date (1) • Established, mining-friendly jurisdiction with +85 year history • 1.3 million ounces of gold produced in the district at a grade of 19.5 g/t from 2013 to 2015 (2) • 45 km2 contig

  8. Slide 8: Focused on Discovery in a Proven District

    Madsen Gold Project FOCUSED ON DISCOVERY IN A PROVEN DISTRICT 3rd largest 2.5 million oz 9.9 g/t LAND PACKAGE IN RED LAKE HISTORIC PRODUCTION (1) AVERAGE HISTORIC GRADE (1) • Permitted mill and tailings management facility • Second largest historic producer in Red Lake, with continuous historical pr

  9. Slide 9: Focused on Discovery in a Proven District

    Madsen Gold Project FOCUSED ON DISCOVERY IN A PROVEN DISTRICT Russet South Target Tailings Madsen Madsen #2 Shaft Management McVeigh Portal Facility and Decline Site Offices McVeigh Austin Mill Powerline 8

  10. Slide 10: +$200 Million of Existing Infrastructure

    Madsen Mine & Mill +$200 MILLION OF EXISTING INFRASTRUCTURE(1) Portal to underground ramp Interior of Madsen mill 1,275 metre deep shaft Permitted tailings facility & 27 levels of workings Madsen mill (1) Management estimate to replace existing infrastructure at current cost estimates. 9

  11. Slide 11: Modern Science Driving Exploration

    Madsen Gold Project MODERN SCIENCE DRIVING EXPLORATION • Multiple highly prospective targets currently being drill tested 10

  12. Slide 12: Multiple Gold Zones Open for Expansion

    Madsen Target Settings MULTIPLE GOLD ZONES OPEN FOR EXPANSION Note: Mine workings and geologic contacts in this image are schematic. The mineral resource estimate reported herein for the Madsen Gold Project is set out in the NI 43-101 technical report “Technical Report on the Preliminary Economic As

  13. Slide 13: Austin – McVeigh Setting

    Madsen Mine Geology AUSTIN – MCVEIGH SETTING McVeigh • Limited near-surface production with a maximum historic mining depth of 230 metres • Recurrent south-plunging mineralized system • Open for expansion – focus of current drill program Austin • Hanging wall horizon mined from surface to a depth of

  14. Slide 14: Targeting High Grade Gold Shoots at McVeigh

    Madsen 2017 Drill Program TARGETING HIGH GRADE GOLD SHOOTS AT MCVEIGH A’ B’ 13.5 g/t Au 4.3 m 11.0 g/t Au 4.2 m 50.2 g/t Au 4.0 m 69.0 g/t Au 1.2 m 67.5 g/t Au 1.1 m 21.3 g/t Au 1.5 m 17.7 g/t Au 2.0 m Note: See Pure Gold news releases dated March 1, 2016, April 4, 2016, May 17, 2016, June 14, 2016,

  15. Slide 15: Austin Long Section – A3 Target

    Madsen 2017 Drill Program AUSTIN LONG SECTION – A3 TARGET • New high grade gold target located within the Austin Horizon, interpreted to be another sub-parallel gold bearing structure that is open in all directions(1) 16.7 g/t Au 1.0 m 25.4 g/t Au 68.0 g/t Au 8.0 m 3.1 m 18.3 g/t Au 58.8 g/t Au 10.0

  16. Slide 16: Targeting High Grade Gold Mineralization

    Madsen 2017 Drill Program TARGETING HIGH GRADE GOLD MINERALIZATION Resource Growth Close to Mine Infrastructure • Geologic setting genetically and spatially links mineralization in multiple settings • A3 discovery is a direction application of modern exploration geoscience to a data rich project • M

  17. Slide 17: +5km Mineralized System

    Madsen Property +5km MINERALIZED SYSTEM Fork McVeigh Starratt Austin High Grade Gold Mineralized System, Scale Potential • Austin open down plunge - hole AD-11-01 returns 14.3 g/t gold over 2.0m at 2.1km vertical depth • McVeigh open for expansion – drilling expanding gold mineralization outside of

  18. Slide 18: High Grade in Satellite Exploration Targets

    Madsen Satellite Zones HIGH GRADE IN SATELLITE EXPLORATION TARGETS Advance Satellite Targets with High Grades 17

  19. Slide 19: Russet South – Potential for Near Surface Resource

    Russet South POTENTIAL FOR NEAR SURFACE RESOURCE • High grade gold located ~1.5 km west of the McVeigh horizon and existing infrastructure • New Zone of Mineralization Discovered PG17-335 returns 4.4 g/t gold over 12.0m including 14.3 g/t gold over 2.0m • Continuity of Mineralization – drilling demo

  20. Slide 20: Preliminary Economic Assessment

    Madsen Gold Project PRELIMINARY ECONOMIC ASSESSMENT • Initial PEA (April 2016) shows total gold 2016 PEA (1) production of ~260,000 ounces over a 6.5 year mine life at an average diluted head grade of Pre-Tax / After-Tax IRR 8.3 g/t gold (1) 74% / 62% ü Positive base case assessment of developing Pr

  21. Slide 21: Pure Opportunity

    Pure Gold Mining PURE OPPORTUNITY High grade deposit with a long mining history Large mineral system open for expansion New science has significantly increased understanding of deposit geology providing a framework for exploration success +$200 million of infrastructure in-place at Madsen(1) Attract

  22. Slide 22: Appendix

    purégjold dream big APPENDIX

  23. Slide 23: Austin Long Section – A3 Target

    Madsen 2017 Drill Program AUSTIN LONG SECTION – A3 TARGET • New high grade gold target located within the Austin Horizon, interpreted to be another sub-parallel gold bearing structure that is open in all directions(1) Note: See Pure Gold news releases dated October 31, 2016 and February 28, 2017 for

  24. Slide 24: Starratt

    Madsen Satellite Zones STARRATT • Regional target associated with the historic Starratt Olsen Mine ü Located ~2.2km south of the Madsen No. 2 Shaft • Open down plunge and along strike, in an analogous geological setting to the McVeigh, South Austin and Austin horizons • Starratt Olsen Mine produced

  25. Slide 25: Current Mineral Resource

    Madsen Gold Project CURRENT MINERAL RESOURCE Grade Grade Contained Gold Resource Class Zone Tonnes g/t Au oz/t oz Au Indicated Austin 1,677,000 7.92 0.23 427,000 South Austin 850,000 9.32 0.27 254,000 McVeigh 374,000 9.59 0.28 115,000 8 Zone 335,000 12.21 0.36 132,000 Total Indicated 3,236,000 8.93

  26. Slide 26: 2016 PEA – Additional Details

    Madsen Gold Project 2016 PEA – ADDITIONAL DETAILS • Underground mining via mechanized cut and fill, PEA SUMMARY PARAMETERS (1) shrinkage, and long-hole mining methods Gold Price US$1,175/oz • $20.1 million in pre-production capital costs over a Exchange Rate (US$ to C$) 0.80 12-month period Total Re

  27. Slide 27: Benchmarking vs. Peers – Resource Grade

    Pure Gold Mining BENCHMARKING VS. PEERS – RESOURCE GRADE M&I Resource Grade 12.0 11.61 10.0 9.13 8.93 M&I Resource Grade (g/t Au) 8.42 8.0 5.87 6.0 4.91 4.09 3.50 4.0 2.66 1.63 2.0 0.82 0.0 (1) Dalradian Integra Pure Gold Osisko Sabina Gold Auryn Eastmain Condor Gold ATAC Midas Gold Ascot Inferred R

  28. Slide 28: Benchmarking vs. Peers – Market Cap & P/NAV

    Pure Gold Mining BENCHMARKING VS. PEERS – MARKET CAP & P/NAV Price / NAV 1.20x 1.14x 0.90x 0.82x 0.79x Price / NAV 0.60x 0.55x 0.60x 0.47x 0.32x 0.27x 0.30x 0.00x Osisko Integra Sabina Gold Dalradian Pure Gold Midas Gold Eastmain ATAC Market Capitalization $904 $900 $800 $700 Market Cap (C$mm) $600

  29. Slide 29: One of the World's Highest Grade Gold Projects

    Madsen Gold Project ONE OF THE WORLD’S HIGHEST GRADE GOLD PROJECTS Select High Grade Gold Assets Hope Bay (TMAC) Back River (Sabina) Brucejack (VOK) Madsen Fire Creek Red Lake Brucejack (VOK) Cocheneur (Pretium) Jerusalem Lamaque (Integra) Zaruma Fire Creek & Midas (Klondex) Madsen Cocheneur& Red Go

  30. Slide 30: Corporate Inquiries

    Corporate Inquiries: Darin Labrenz President & CEO t: 604.646.8000 info@puregoldmining.ca PGM:TSX-V 1900 – 1055 West Hastings Street Vancouver, BC V6E 2E9 www.puregoldmining.ca

Pure Gold Mining — Investor Presentation (April 2017) on 6ix