Grange Resources Limited · ASX:GRR

Grange Resources — Macquarie Conference, Perth 2011

45 slides from Grange Resources's conference presentation, Nov 8, 2011

  1. Slide 1: Australia's leading magnetite producer

    For personal use only Australia’s leading magnetite producer Ross Carpenter Macquarie Conference, Perth, WA 8th November 2011

  2. Slide 2: Disclaimer

    Disclaimer For personal use only The material in this presentation (“material”) is not and does not constitute an offer, invitation or recommendation to subscribe for, or purchase, any security in Grange Resources Limited (“GRR”) nor does it form the basis of any contract or commitment. GRR makes no

  3. Slide 3: Company Overview

    Company Overview For personal use only Grange remains Australia’s leading magnetite producer. An ASX 300 index, dividend paying company, with a strong balance sheet, no net debt , a large producing mine and a larger magnetite project. November 2011 Slide 3

  4. Slide 4: Magnetite – The premium iron ore

    Magnetite – The premium iron ore For personal use only Iron Ore Pellet ~65-69% Fe Higher ~US$200 FOB Tasmania Magnetite Concentrate QUALITY ~67% Fe Direct Shipping Lump ~63% Fe Direct Shipping Fines Lower ~62% Fe ~US$150 CFR China Lower Price Higher November 2011 Slide 4

  5. Slide 5: Company Snapshot

    Company Snapshot For personal use only Current key statistics (A$) Current Ownership Structure Ordinary shares on issue 31 October 2011 1,153m Free float Last share price 31 October 2011 $0.46 33.83% PML 46.83% Market capitalization 31 October 2011 $530m RGL Group Cash & Receivables 30 September 201

  6. Slide 6: Grange Board

    Grange Board For personal use only Grange has a board with a diverse range of relevant experience. Xi Zhiqiang: Chairman Neil Chatfield: Deputy Chairman (Independent) Extensive experience in the Chinese steel industry Recently Executive Director and CFO of Toll Holdings, a position held Baosteel emp

  7. Slide 7: Jiangsu Shagang – Cornerstone Shareholder

    Jiangsu Shagang – Cornerstone Shareholder For personal use only A strong partnership Grange’s largest shareholder Major customer with a LOM offtake agreement at Savage River at market prices. Agreement to negotiate at fair market price for Grange’s share of offtake from Assets • In excess of A$19 bi

  8. Slide 8: Grange Resources: Australia's Leading Magnetite Producer

    Grange Resources For personal use only Australia’s Leading Magnetite Producer Grange’s position is supported by quality assets In Tasmania and Western Australia. Southdown Project (70%) Savage River (100%) 90km northeast of the Northwest Tasmania Port of Albany Annualised production rate 650 million

  9. Slide 9: Savage River Overview

    Savage River Overview For personal use only Ownership Grange 100% Mineral Resource of 306Mt magnetite at 52.3% Resources DTR and Reserves Ore Reserve of 119Mt magnetite at 51.2% DTR 2.0 Mtpa blast furnace pellets (2011 guidance) Production Potential to expand to 2.6Mtpa Operating A$127/t pellets (Se

  10. Slide 10: Savage River Large Scale Operations

    Savage River Large Scale Operations For personal use only November 2011 Slide 10

  11. Slide 11: Savage River Downstream Infrastructure

    Savage River Downstream Infrastructure For personal use only November 2011 Slide 11

  12. Slide 12: Savage River Port & Shiploading Infrastructure

    Savage River Port & Shiploading Infrastructure For personal use only November 2011 Slide 12

  13. Slide 13: Savage River Solid Customer Base

    Savage River Solid Customer Base For personal use only Long term offtake agreements – providing revenue stability Agreements are in place for both Savage River and Southdown production at index based market prices. Shagang China’s largest private steel mill, producing 29Mtpa of pig iron Grange’s lar

  14. Slide 14: Savage River - Leveraged to price

    Savage River - Leveraged to price For personal use only Margin leverage to price @2.0Mtpa 500 September 2011 450 400 350 MARGIN A$ million 300 250 200 Revenue 150 Costs 100 120 130 140 150 160 170 180 190 200 210 220 230 Price US$/t November 2011 Slide 14

  15. Slide 15: September Quarter Summary

    September Quarter Summary For personal use only Production and Production and Production and Costs Costs Costs September Quarter June Quarter September Quarter 2011 2011 2010 Total BCM Mined 3,184,680 4,103,863 4,055,157 Total Ore BCM 402,846 510,546 217,167 Weight Recovery (% DTR) 34.5 32.3 39.6 Co

  16. Slide 16: Southdown Key Facts

    Southdown Magnetite Project Key Facts For personal use only Ownership Grange 70%, Sojitz Corporation 30% Resources and Mineral Resource of 654Mt magnetite at 36.5% DTR1,2 Reserves1 Ore Reserve of 388Mt magnetite at 35.5% DTR1,3 Targeting 10Mtpa magnetite concentrate for premium Production1 blast fur

  17. Slide 17: PFS Highlights

    Southdown Magnetite Project PFS Highlights For personal use only • Mine Capex, including infrastructure A$2.57 billion; • Operating costs per tonne of concentrate produced < A$60 per tonne; • Positive NPV with favourable IRR; • Mine life of 19-40 years @10mtpa of concentrate; • Definitive Feasibilit

  18. Slide 18: Location Plan

    Southdown Magnetite Project Location Plan For personal use only November 2011 Slide 18

  19. Slide 19: Orebody

    Southdown Magnetite Project Orebody For personal use only 654 Mt at 36.5% magnetite November 2011 Slide 19

  20. Slide 20: Resources and Reserves

    Southdown Magnetite Project Resources and Reserves For personal use only Mineral Resources Classification Measured Indicated Inferred Total Resources Tonnes (Mt) 219.7 210.3 224.4 654.4 DTC wt% 37.4 38.9 33.4 36.5 DTC Fe% 69.2 69.3 69.1 69.2 DTC SiO2% 1.72 1.94 2.07 1.91 DTC Al2O3% 1.43 1.27 1.29 1.

  21. Slide 21: Orebody Potential

    Southdown Magnetite Project Orebody Potential For personal use only Short Term PFS Case Long Term Potential Details Potential Western Resource Western/Eastern Resource Full Western Resource Mine Life 19 years 21 years 40 years Ore (million tonnes) 430 ~575 ~1,200 Ore Grade %DTR 37.7% 36.8% 36.5% Con

  22. Slide 22: Mining

    Southdown Magnetite Project Mining For personal use only Open pit mining Conventional bulk mining methods utilising Mining Method hydraulic face shovels, dump trucks and drill and blast coupled to a Run of Mine (ROM) stockpile Material ~110 Mtpa for first six years Movement Shovel size – 650 tonnes

  23. Slide 23: Monster Pit

    Southdown Magnetite Project 12 kilometre Monster Pit For personal use only Southdown Open Pit Savage outline River Open Pit 3 Kilometres November 2011 Slide 23

  24. Slide 24: Concentrator Flow Sheet

    Southdown Magnetite Project Concentrator Flow Sheet For personal use only November 2011 Slide 24

  25. Slide 25: Product Quality

    Southdown Magnetite Project Product Quality For personal use only Southdown Magnetite Southdown Iron % % Concentrate Ore Pellets Total Fe 68.9 Total Fe 67 SiO2 1.56 B2 0.54 Al2O3 1.45 SiO2+Al2O3+TiO2 3.31 CaO 0.11 P <0.01 MgO 0.16 S 0.01 TiO2 0.38 P 0.04 S 0.08 LOI (Loss of ignition) -3.18 November

  26. Slide 26: Power and Pipelines

    Southdown Magnetite Project Power and Pipelines For personal use only Key Facts - Power: Estimated Length 288km Capital Cost A$272 million 330kV transmission line Ongoing discussions with Capacity Status Western Power Key Facts – Pipeline: Estimated Length 100km (1.5 metres deep) Capacity Line Volum

  27. Slide 27: Water Supply

    Southdown Magnetite Project Water Supply For personal use only Seawater reverse Source osmosis desalination plant Capacity 10GL/a Capital cost A$170 million Coastal location 25km from mine and pumped Location to the mine site after treatment November 2011 Slide 27

  28. Slide 28: Albany Port Infrastructure

    Southdown Magnetite Project Albany Port Infrastructure For personal use only Vessels Cape size (18m draft) Deepen; widen and extend existing shipping channel Activities New wharf Filtration plant and storage shed 9ha Increases port Area Reclaimed capacity from 2.5Mt to 14Mt New Berth Location New Be

  29. Slide 29: Environmental Permits

    Southdown Magnetite Project Environmental Permits For personal use only 3 Mine Environmental permit Granted November 2009, amendment required in 2011 for 10mtpa 3 Port permits Granted November 2010 Water permit Desalination permit expected Q1, 2012 November 2011 Slide 29

  30. Slide 30: PFS Capital Expenditure

    Southdown Magnetite Project PFS Capital Expenditure For personal use only SOUTHDOWN CAPITAL EXPENDITURE A$m Mine (1) 560 Concentrator 850 Slurry Pipeline 200 Transmission Line 320 Desalination and Water Supply 200 Albany Concentrate Filtration and Storage 20 Port of Albany 400 Allowances for Provisi

  31. Slide 31: Project Australia - Malaysia

    Southdown Project Australia - Malaysia For personal use only 4. Pellet Plant (7Mtpa) 3. Concentrate shipped (10Mtpa) 2. 100km slurry pipeline to Albany Port 1. Mine and concentrator targeting 10Mtpa of concentrate production for over 25 years November 2011 Slide 31

  32. Slide 32: The Kemaman Pellet Plant Location Plan

    The Kemaman Pellet Plant Location Plan For personal use only November 2011 Slide 32

  33. Slide 33: Kemaman Project PFS Capital Expenditure

    Kemaman Project PFS Capital Expenditure For personal use only KEMAMAN A$m Pellet Plant 640 Kemaman Port Facilities and Materials Handling 300 Allowances for Provisional Sums 1 Total Costs (2) – Malaysian Operations 941 (2) Includes EPCM, Owners Costs, Estimate Accuracy and Project Contingency Novemb

  34. Slide 34: Project PFS Operating Cost Summary

    Southdown Project PFS Operating Cost Summary For personal use only Unit Rates Cost per tonne of concentrate produced <A$60 Cost per tonne of pellets produced <A$75 (1) Excludes WA Mineral Royalty November 2011 Slide 34

  35. Slide 35: Forecast Project Schedule

    Forecast Project Schedule For personal use only 2011 2012 2013 2014 Definitive Feasibility Financing Construction Commissioning & Production November 2011 Slide 35

  36. Slide 36: PFS Highlights

    Southdown Magnetite Project PFS Highlights For personal use only Why is this project different to other magnetite projects being built? • Grange’s cashflow, extensive operating experience and existing IP dramatically reduces execution risk, • The project is well advanced: Major permits for the mine

  37. Slide 37: Resources and Reserves 2011

    Resources and Reserves 2011 For personal use only Supporting Long Mine Lives Mineral Resources (inclusive of reserves) Ore Reserves Tonnes Grade Tonnes Grade (Mt) (%DTR) (Mt) (%DTR) Savage River 4 Savage River Measured 81 54.2 Proved 48 51.6 Indicated 132 53.5 Probable 66 51.4 Inferred 87 48.8 Total

  38. Slide 38: Production growth prospects

    Production growth prospects only 14000 12000 use 10000 Million tonnes For personal 8000 Southdown 6000 4000 2000 Savage River 0 2006 2008 2010 2012 2014 2016 2018 2020 (Southdown production includes Sojitz 30% share)) November 2011 Slide 38

  39. Slide 39: Grange - The largest Producing Magnetite Company

    Grange - The largest Producing Magnetite Company For personal use only 2.78b Out of the numerous junior companies with magnetite assets, Grange is the only one in production. November 2011 Slide 39

  40. Slide 40: Current Focus and Future Milestones

    Current Focus and Future Milestones For personal use only Position Savage River for long term sustainable production: – Replacement ball mill installed February 2011 2012 – Replacement AG mill purchased – Trucking fleet re-built – Reviewing options for Port Latta emissions reduction – Completing eas

  41. Slide 41: Summary

    Summary For personal use only Australia's leading magnetite & iron ore pellet producer Solid investor, customer and revenue base Extensive magnetite technical and operational expertise Strong balance sheet and strong cashflow forecasts Healthy mix of Cornerstone, Institutional and Retail investors I

  42. Slide 42: Key Contacts

    Key Contacts For personal use only Primary contacts: Russell Clark Managing Director & Chief Executive Officer +61 8 9327 7901 managingdirector@grangeresources.com.au November 2011 Slide 42

  43. Slide 43: Competent Person Statement

    Competent Person Statement For personal use only Southdown Project The information in this presentation which relates to the Mineral Resources of the Southdown Project is based on information compiled by James Farrell who is a full-time employee of Golder Associates Pty Ltd and a Member of the Austr

  44. Slide 44: Appendix A – Southdown Project

    Appendix A – Southdown Project For personal use only Mineral Resource Estimate Classification Measured Resources Indicated Resources Inferred Resources Total Resources Tonnes (Mt) 219.7 210.3 224.4 654.4 DTC wt% 37.4 38.9 33.4 36.5 DTC Fe% 69.2 69.3 69.1 69.2 DTC SiO2% 1.72 1.94 2.07 1.91 DTC Al2O3%

  45. Slide 45: Appendix B – Savage River

    Appendix B – Savage River For personal use only Mineral Resource and Ore Reserve Estimates Mineral Resource Tonnes (Mt) Grade (%DTR) Grade Ore Reserve Tonnes (Mt) (%DTR) Savage-River Total Measured 86.4 54 Savage-River Total Indicated 131.9 53 Proved 50.6 51 Inferred 87.8 49 Probable 67.9 51 Total 3