    For personal use only Investor Presentation Euroz Hartleys Conference Rottnest Island Luke Creagh Managing Director March 2025 ASX: OBM ORABANDAMINING.COM.AU

  2. Slide 2: Forward looking statements

    Forward looking statements IMPORTANT NOTICE AND DISCLAIMER This Presentation dated 7 March 2025 contains summary information about Ora Banda Mining Ltd ABN 69 100 038 266 (Ora Banda Mining or the Company) and its activities based on information available at the time of preparing the Presentation. Th

  3. Slide 3: We are Ora Banda Mining

    We are Ora Banda Mining Sustainably growing gold production to unlock long- term value for all stakeholders DAVYHURST GOLD PROJECT (100% ORA BANDA MINING) For personal use only ► Large land holding with 67 granted tenements over 1,135km2 ► Belt-scale exploration potential with more than 130km of hig

  4. Slide 4: Corporate overview

    Corporate overview ASX: OBM CAPITAL STRUCTURE BOARD OF DIRECTORS Share Price* A$/share 0.980 Peter Mansell Non-executive Chairman (Corporate Lawyer) For personal use only Shares on issue* Million 1,880.8 Luke Creagh Managing Director (Mining Engineer) Performance rights on issue* million 154.8 Alan

  5. Slide 5: Strengthening Balance Sheet

    Strengthening Balance Sheet Execution of $50M Syndicated Facility Agreement provides over $100M in liquidity2 100Koz of Put options for FY26 at A$4,400/oz provides insurance - retain full exposure to gold price upside2 120 SYNDICATED FACILITY AGREEMENT (SFA) For personal use only 1 Improved Liquidit

  6. Slide 6: Delivering on our strategy

    Delivering on our strategy DRIVE to 150 underpins growth target of 150 koz in FY26 and beyond WE FOCUS ON LEVERAGE OPTIMISE PERFORMANCE For personal use only THE FUNDAMENTALS ORGANIC OPPORTUNITIES AND GROW THE BUSINESS 1 2 3   Performance executed in line with plan Increase exploration spend, exte

  7. Slide 7: Delivering on our strategy

    Delivering on our strategy Sustainably growing gold production to unlock long-term value for all stakeholders 180 000 450 0 FOCUS ON THE 1 FY25 COST AND PRODUCTION GUIDANCE3,4* For personal use only 150 koz 160 000 FUNDAMENTALS Open pit + stockpiles (oz Au) 400 0 ► Production up Sand King Undergroun

  8. Slide 8: 1. We focus on the fundamentals

    1. We focus on the fundamentals Delivering a transformational twelve months with Riverina Underground production now fully ramped up For personal use only ORABANDAMINING.COM.AU 8

  9. Slide 9: H1 FY25 – Delivering on underground strategy

    1. H1 FY25 – Delivering on underground strategy Strategy change to focus to underground delivered record revenues and operating cash flows HIGHLIGHTS FROM H1 FY255 SIX MONTHLY SOLD OUNCES AND AISC 3,500.0 For personal use only 3,183 RECORD OPERATING CLOSING 50.0 REVENUE CASH FLOWS CASH 47.8 3,000.0

  10. Slide 10: Sustainability at Ora Banda

    Sustainability at Ora Banda Sets the foundation on which our future production growth will be built OVER TWO AND A HALF YEARS LOST TIME INJURY FREE For personal use only ► H1 FY25 TRIFR: 11.8 IDENTIFY ► Dedicated Sustainability Committee ► Business decision-making guided by our core values ► Environ

  11. Slide 11: 2. Levering our organic opportunities

    2. Levering our organic opportunities Riverina and Sand King Underground mines set to fill the Davyhurst mill with high-grade ore For personal use only ORABANDAMINING.COM.AU 11

  12. Slide 12: Riverina Underground mine

    2. Riverina Underground mine Capital payback achieved only 18 months after commencement6 32,0 00 8.0 STEADY STATE MINING WITH CONTINUOUS HIGH-GRADE MINERALISATION QUARTERLY OUNCES AND MINED GRADE 31,0 00 30,0 00 For personal use only 29,0 00 COMMERCIAL MINED GRADE > OUNCES IN LINE    RAMP UP TO C

  13. Slide 13: Riverina Underground mine

    2. Riverina Underground mine Successful drilling paves way for multi-year mine extension4 ► Deeper drilling confirms continuity of high-grade gold For personal use only mineralisation over 300m below the current mine plan ► Extensional drilling in “Shark Bite” show continuity of mineralisation in un

  14. Slide 14: Riverina Underground mine

    2. Riverina Underground mine Multiple lodes per level deliver low capital intensity and optionality4 For personal use only 2235 Level Multiple ore drives result in low capital 2185 Level (lowest level development) intensity plus optionality in relation to the availability of ore development headings

  15. Slide 15: Sand King Underground mine

    2. Sand King Underground mine DAVYHURST 1.2 Mtpa PROCESSING PLANT Mine ramping up on schedule to steady state in June 257 BERWICK – MOREING TARGET SAND KING SAND KING TO ENABLE 150 KOZ PA PRODUCTION OUTLOOK For personal use only PALMERSTON – PORTAL FIRST STOPING TO CAMPERDOWN TARGET 1 COMMENCED 2 DE

  16. Slide 16: Sand King Underground mine

    2. Sand King Underground mine Numerous intersections outside the current mine plan demonstrate potential for further growth SAND KING LONG SECTION LOOKING NORTHWEST: A LARGE MINERALISED GOLD SYSTEM For personal use only SW NE PHASE 1 45,400M UNDERGROUND DRILLING PROGRAM COMMENCED SEPTEMBER CY24 LEGE

  17. Slide 17: Sand King Underground mine

    2. Sand King Underground mine First development level reconciles positively to FID assumptions in both grade and endowment7 ► First development ore processed reconciled grade was 4.3% above For personal use only expectations (mine call of 2.3g/t vs actual of 2.4g/t) ► Metallurgical recovery reconcil

  18. Slide 18: 3. Our plan for optimising performance and growth

    3. Our plan for optimising performance and growth Unlock the opportunity at Riverina and Sand King in parallel with targeting additional underground potential at other deposits For personal use only ORABANDAMINING.COM.AU 18

  19. Slide 19: Unlocking Riverina Gold Camp

    3. Unlocking Riverina Gold Camp LEGEND RIVERINA GOLD CAMP Gold Resource 730 koz at 2.5 g/t Au Prospect Drill intersection PLAN VIEW Mafic Systematic exploration focus to uncover the full extent of the system Ultramafic Dolerite Diorite Intrusion GREATER PACIFIC Shear zone FY25 EXPLORATION PROGRAM TO

  20. Slide 20: Unlocking Riverina Gold Camp – Little Gem

    3. Unlocking Riverina Gold Camp – Little Gem Highly encouraging initial results from Little Gem creates catalyst for immediate follow up drilling RIVERINA LONG SECTION LOOKING WEST: SHOWING EARLY SUCCESS AT 200VMBS AT LITTLE GEM – HOLE LGDD24001 ► Three mineralised zones identified in discovery hole

  21. Slide 21: Underground potential at the Mulline deposit

    3. Underground potential at the Mulline deposit Underexplored trend over 10 km strike located ~8km west of the Riverina Trend MULLINE LONG SECTION LOOKING WEST: HISTORIC SHALLOW GOLD MINING For personal use only ► Over 10km trend with old open pit mines, numerous surface anomalies & high grades iden

  22. Slide 22: Central Davyhurst UG potential at Waihi Trend

    3. Central Davyhurst UG potential at Waihi Trend Historical underground mined at 29.7g/t head grade with limited down dip exploration of high-grade shoots WAIHI LONG SECTION LOOKING WEST: HIGH GRADE SHOOTS DEMAND FOLLOW UP DRILLING For personal use only ► Drilling has commenced on the Waihi & Homewa

  23. Slide 23: Executing our strategy to deliver value

    Executing our strategy to deliver value Unparalleled growth, delivered sustainably For personal use only OPERATING WITH A DYNAMIC AND BUILDING A INTEGRITY AND CATALYST-RICH PREMIER MID-TIER DELIVERING OUR YEAR AHEAD GOLD MINING COMMITMENTS BUSINESS CONTINUING TO DELIVER RIVERINA DRILLING EXECUTING O

  24. Slide 24: Appendix

    Appendix For personal use only ORABANDAMINING.COM.AU 24

  25. Slide 25: Mineral Resource Estimate Statement

    Mineral Resource Estimate Statement1 MEASURED INDICATED INFERRED TOTAL MATERIAL PROJECT ('000t) (g/t Au) ('000t) (g/t Au) ('000t) (g/t Au) ('000t) (g/t Au) ('000oz.) LIGHTS OF ISRAEL - - 74 4.3 180 4.2 254 4.2 34 MAKAI SHOOT - - 1,985 2.0 153 1.7 2,138 2.0 136 For personal use only WAIHI Open Pit -

  26. Slide 26: Ore Reserve Statement

    Ore Reserve Statement1 For personal use only DAVYHURST GOLD PROJECT ORE RESERVE BY DEPOSIT Notes: 1. The table contains rounding adjustments to reflect accuracy and may not total exactly. PROJECT AREA PROVED PROBABLE TOTAL MATERIAL 2. This Ore Reserve was estimated from practical mining envelopes an

  27. Slide 27: ASX Listing Rule 5.23 Statements

    ASX Listing Rule 5.23 Statements Mineral Resources and Reserves For personal use only The information in this Presentation that relates to Mineral Resources and Ore Reserves Exploration Results (Continued) has been extracted from the Company’s ASX release, ‘Annual Mineral Resource and Ore Reserve St

  28. Slide 28: Endnotes

    Endnotes For personal use only 1. Refer to ASX announcement, ‘Annual Mineral Resource and Ore Reserve Statement’ dated 2 July 2024 2. Refer to ASX announcement, “Balance sheet strengthens with $50m Revolving Credit Facility & Purchase of Put Options at $4,400/oz” dated 7 March 2025 3. Refer to ASX a

  29. Slide 29: Contact details

    Contact details LUKE CREAGH For personal use only Managing Director +61 8 6365 4548 admin@obmltd.com.au ORABANDAMINING.COM.AU