Vior Gold Corporation Inc. · TSXV:VIO

Vior Gold — Investor Presentation (March 2025)

21 slides from Vior Gold's investor presentation, March 2025

  1. Slide 1: Corporate Presentation March 2025

    TSXV: VIO ∙ OTCQB: VIORF ∙ FRANKFURT: VL51 M A R C H 2 0 2 5 CORPORATE PRESENTATION

  2. Slide 2: Forward Looking Statements & Technical Content

    FORWARD Statements in this document, to the extent Such risks and uncertainties with respect to not based on historical events, constitute the company include the effects of general LOOKING forward-looking looking statements. statements include, Forward- without economic conditions, changing exchang

  3. Slide 3: Unlocking Value Through Discoveries

    UNLOCKING VALUE THROUGH DISCOVERIES QUEBEC Wemindjii Sept-Iles Matagami Chibougamau Rouyn-Noranda Quebec Val d’Or BELLETERRE Winneway Belleterre Montreal 3

  4. Slide 4: Belleterre Gold Project: Highlights & Opportunity

    Rouyn-Noranda BELLETERRE Val-d’Or GOLD PROJECT 95 km Highlights & Opportunity 95 km • Historic high-grade Belleterre mine produced over 750,000 oz Au at 10.7 g/t (MERN) Winneway • Gold system untested at depth and along strike • Excellent location and low-cost exploration Belleterre • District scale

  5. Slide 5: Belleterre Gold Project: Proven Mining Belt and Value Creation

    BELLETERRE GOLD PROJECT One of the last under explored historic high-grade gold mining camps in the Abitibi Greenstone Belt … PROVEN MINING BELT PROVEN VALUE CREATION STRATEGY • Historic Belleterre gold mine produced M&A ACTIVITIES from previous consolidated past-producing camps: over 750,000 oz Au

  6. Slide 6: Belleterre Gold Project: Mineral Claims

    BELLETERRE BELLETERRE GOLD MINERAL CLAIMS 635 Claims ~350 km2 N GOLD PROJECT Winneway Belleterre Gold Mine Aubelle Deposit Belleterre DISTRICT-SCALE GOLD PROJECT 1,195 claims over 670 km2 LEGEND Brownfield Exploration Area Area of Significant Gold Exploration Potential Advanced Exploration Prospect

  7. Slide 7: Belleterre Gold: Proposed Drill Plan

    BELLETERRE GOLD: PROPOSED DRILL PLAN Collar Locations for +60,000m Drill Program HOSKIN VEIN 59.8 g/t Au & 44.9g/t Ag 16.0 g/t Au & 32.5g/t Ag BELLETERRE CONWAY VEIN PAQUIN VEIN MINE 274.9 g/t Au 21.7 g/t Au & 60.1g/t Ag BT#9 VEIN 45.3 g/t Au AUBELLE DEPOSIT 50.1 g/t Au QFP A 19.0 g/t Au TOWN 175 g/

  8. Slide 8: Belleterre Gold: Next Potential Discovery

    BELLETERRE GOLD: NEXT POTENTIAL DISCOVERY Belleterre Mine Trend Plan View and Long Section Plan View 60 ppm Au 30 ppm Au 67 ppm Au 16 ppm Au 22 ppm Au 275 ppm Au CONWAY DEPOSIT BELLETERRE MINE PAST PRODUCTION LEGEND ~800K oz Au @ 10.7 g/t (MERN) 50 ppm Au Vior Gold Grab 14 ppm Au samples 24 ppm Au V

  9. Slide 9: Belleterre Gold Mine Cross Section – West View

    BELLETERRE GOLD MINE Cross Section – West View Surface LEGEND Vein #12 Historic Deposits & Workings Projected Vein #12 Potential Stacked Veins Felsic Intrusive 500 m Mafic Volcanics Diorite Infinite Long Section (South view) • Gold system extension at depth • Gold correlation to felsic intrusive • S

  10. Slide 10: Belleterre Gold: Recent Results

    BELLETERRE GOLD: RECENT RESULTS

  11. Slide 11: Belleterre Gold: Recent Results

    BELLETERRE GOLD: RECENT RESULTS A A' • Recent results confirming extension of Vein 12 N 250 metres at depth. OPEN BV24-059 11.6 g/t Au over 2.0 m (16.1 g/t Au / 1.2 m) OPEN

  12. Slide 12: Belleterre Gold: Untested at Depth

    BELLETERRE GOLD: UNTESTED AT DEPTH C D CONWAY ZONE PAQUIN ZONE AUBELLE DEPOSIT AUBELLE 2 VEIN 250 m BV21-001 BV24-056 55.2 g/t Au over 0.5 m 9.0 g/t Au / 0.5m (Released April 6th, 2022) BV24-045 BV21-005 24 g/t Au / 1m 6.4 g/t au over 1 m (Released April 6th, 2022) 500 m BV24-002 1.6 g/t Au / 8 m BV

  13. Slide 13: Belleterre Gold Mine Trend: Primary Drill Targets

    BELLETERRE GOLD MINE TREND Primary Drill Targets BELLETERRE TARGETS • Test depth extension and northern stacking FORMER BELLETERRE MINE veins • Extend multiple east plunging high-grade AUBELLE DEPOSIT shoots AUBELLE TARGETS • Test depth extension and northern stacking of Aubelle deposit • Delineate

  14. Slide 14: Exploration Timeline and Project Milestones

    BELLETERRE GOLD PROJECT Exploration Timeline and Project Milestones SIGNIFICANT IDENTIFICATION INITIATED MINE TREND AND DISTRICT SCALE PROJECT GOLD OF MINERALIZED EXTENSIVE EXPLORATION CONSOLIDATION RESULTS AT STRUCTURAL DRILL SURFACE TRAPS PROGRAM 2021 – 2024 ACHIEVEMENTS 2025 – 2026 OBJECTIVES • C

  15. Slide 15: Corporate Profile

    CORPORATE PROFILE BOARD OF DIRECTORS MANAGEMENT MATHIEU SAVARD CHARLES-OLIVIER TARTE MATHIEU SAVARD President & CEO President & CEO PASCAL SIMARD VP Exploration INGRID MARTIN CFO SHAYAAN BELLUZZO Corporate Secretary MARK FEDOSIEWICH ANDRE LEBEL Chairman TECHNICAL TEAM BEN CLELAND, P.Geo. Senior Expl

  16. Slide 16: Corporate Structure

    CORPORATE STRUCTURE + WORKING CAPITAL $54.6M(1) Adjusted Working Capital 415M Shares Outstanding $83M Market Capitalization ($0.20/share) Note 1: : The "adjusted working capital" is a non-IFRS measure that includes the December 31, 2024 working capital and investment (long term portion) plus the net

  17. Slide 17: Value Based on Strong Fundamentals

    SAFE JURISDICTION TEAM WITH PROVEN Quebec TRACK RECORD Amongst world’s top mining Management and Technical Team jurisdictions (Fraser Institute, 2023) Track record of World Class Gold Discoveries CORPORATE PROFILE VALUE BASED ON STRONG FUNDAMENTALS Strategy: Unlocking Value through Discoveries STRON

  18. Slide 18: Contact Us

    18 CONTACT US Mathieu Savard President, CEO & Director 418-670-1448 msavard@vior.ca TSXV: VIO OTCQB: VIORF FRANKFURT: VL51 Learn more at VIOR.CA

  19. Slide 19: Appendix: More on Our Projects

    A P P E N D I X MORE ON OUR PROJECTS 19

  20. Slide 20: Belleterre Gold Mine Trend: Reinterpretation of Geological Map

    BEFORE AFTER BELLETERRE GOLD MINE TREND Reinterpretation of Geological Map 20

  21. Slide 21: Belleterre Gold Project: 3D Litho-Structural Model

    BELLETERRE GOLD PROJECT 3D Litho-Structural Model 21

Vior Gold — Investor Presentation (March 2025) on 6ix