Ramelius Resources Limited · ASX:RMS
Ramelius Resources — Investor Presentation (April 2006)
23 slides from Ramelius Resources's investor presentation, Apr 5, 2006
Slide 1: Company Presentation April 2006
COMPANY PRESENTATION APRIL 2006
Slide 2: Ramelius
RAMELIUS
Slide 3: Ramelius
RAMELIUS
Slide 4: Slide 4
Slide 5: Ramelius
‘ RAMELIUS
Slide 6: Royalty Tenements and Exploration Tenements
* Royalty Tenements Exploration Tenements ye her
Slide 7: Slide 7
Slide 8: Mining
Han) MO i MININC LD
Slide 9: Wattle Dam 7800N Orebody
WATTLE DAM 7800N OREBODY ndi catedinferr | 2 1000z Gold ntcoete Mining 0,000 tonnes @ 6. Ogit for 13, 500 oz Gold Potential for additional ore down plunge and down dip 1o80mRL
Slide 10: Ramelius
RAMELIUS
Slide 11: Ramelius
‘ RAMELIUS
Slide 12: Spargoville Geochemistry Gold in Soil
BIE RAMELIUS F " 360000 mE Wattle Dam Gold Mine y20 Au (ppb) §/ i, Spargoville Geochemistry Gold in Soil 0 5 10 ———__—_— Eee kilometres:
Slide 13: Spargoville Simplified Regolith
J We, , *) % Insitu Transported Spargoville Simplified Regolith 0 5 10 —_ kilometres £52000 mn s
Slide 14: Spargoville Exploration Targets
360000 mE 380000 mE Hilditch Nickel x Project Yilmia Hill Gold RAMELIUS 640000 mi |____—_ Lefroy Tantalum Groper North Gold (In Progress) Hilditch Nickel Central Gold Wattle Darn Gold Mine 520000 mn 7OOON to Skylark South Mistletoe Gold (In Progress) 7 Abyss Gold 620000 mN 4 Hidden Valley Gold | Wid
Slide 15: Central Gold Target Gold in Soil Geochemistry
Hi824000 mn 6534000 mN Hess2000 mn 522000 mM Central Gold Target j Gold in Soil Geochemistry and Active Drainage 0 os 1 —— es kilometres a pe i aaa SO wi Hes:0000 mn 520000 mN Wattle Dam Gold Mine ~ a own N q Hes23000 mn 629000 mN
Slide 16: DIINO SDI a A SLL IDLY SY UU EAM Wie WESSON CSSD i LEM
DIINO SDI a A SLL IDLY SY UU EAM Wie WESSON CSSD i LEM eesll a y i LL ae i ay Z Lo ea _ _ ae Le en fo iE é a BEBE LE RE es —r—“‘i™—O™OCOOCOCOCOCOCOCOCOCO;wC Fee fk 7 COs i=. LOE Le Ua ow EE OE i I Ue Bee Yi, Ae ASTM |: a 7 a Ve a, ee fo ee Le RES oe ee ie io Ney . ie a i s 3 ee Z 2 ee EE s ey a i .
Slide 17: Ramelius
RAMELIUS
Slide 18: Hilditch North Interpreted Geology and Drilling
RC Drill Hole Collar RC Drill Hole Trace High Mg Uitramatic Matic Unit ‘ShalesChert WEE, Low ig Utramatic AA Sheared Contact t Hilditch North Section 6537180mN Interpreted Geology and Mineralisation Ramelius Resources Limite Hilditch North Interpreted Geology and Drilling RAMELIUS KALGOORLIE-BOULDER
Slide 19: Hilditch North Nickel Prospect Schematic Geological Section
Hilditch North Nickel Prospect Schematic Geological Section Looking North =
Slide 20: Hilditch North Nickel Prospect Longitudinal Projection
6536800 mE 6537000 mE 6537200.mE 4 RAMELIUS Surface|. Remobilised Zone . * ° Oxides T Sulphides | ° ° : 300 mN 7 Magmatic Zone Prospective Horizon Hilditch North Nickel Prospect. ~ Longitudinal Projection Looking West Intersection within Drill Hole 200 mN. 7. 100 mN 7
Slide 21: Granodiorite
Granodiorite Ea [A Matic rocks 515.4 metres { git Gold
Slide 22: Ramelius
‘ RAMELIUS
Slide 23: Slide 23
Ramelius Resources — Investor Presentation (April 2006) on 6ix