22 slides from Pure Gold Mining's investor presentation, November 2017

  1. Slide 1: November 2017

    November 2017 PGM:TSX-V

  2. Slide 2: Forward Looking Statement

    FORWARD LOOKING STATEMENT Cautionary Statement on Forward-Looking Information & Statements This presentation contains certain forward-looking information and statements which may not be based on fact, including without limitation, statements regarding the Company’s expectations in respect of its fut

  3. Slide 3: Madsen Gold Project

    Pure Gold Mining MADSEN GOLD PROJECT TEAM Owners team in place with expert technical knowledge Current mineral resource – 1,648,000 ozs at 8.9 g/t Gold in 5.79 GRADE Mt Indicated and 178,000 ozs at 9.4 g/t Gold in 0.59 Mt Inferred(1) JURISDICTION Red Lake, Ontario, Canada – an established mining dis

  4. Slide 4: Capital Structure

    Pure Gold Mining CAPITAL STRUCTURE Capital Structure (as at November 14, 2017) Key Shareholders (2) Shares Outstanding 223.2 million Management & Directors 3.6% Options Outstanding Strategic Shareholders 26.7% Weighted average exercise 13.2 million AngloGold Ashanti 11.4% price $0.34 Evanachan Ltd.

  5. Slide 5: Madsen Gold Project

    Red Lake Mining District CANADIAN HIGH GRADE GOLD BELT Madsen Gold Project 2.45 million oz HISTORICAL PRODUCTION (1) 1.65 million oz INDICATED RESOURCE (2) 0.18 million oz INFERRED RESOURCE (2) Current Mineral Resource(2): 1,648,000 ozs at 8.9 g/t Gold in 5.79 Mt Indicated 178,000 ozs at 9.4 g/t Gol

  6. Slide 6: Infrastructure in Place

    Madsen Gold Project INFRASTRUCTURE IN PLACE 200 m 5

  7. Slide 7: Preliminary Economic Assessment

    Madsen Gold Project PRELIMINARY ECONOMIC ASSESSMENT 2017 PEA (1) Project Attributes Mineable Resource 3.0 Mt @ 10.3 g/t • Total gold production of ~911,500 Initial CAPEX ounces over a 14 year mine life at an $51 million average diluted head grade of 10.3 g/t gold (1) After-Tax Payback 2.8 years  Un

  8. Slide 8: Preliminary Economic Assessment

    Madsen Gold Project PRELIMINARY ECONOMIC ASSESSMENT High Margin Detail (US$/oz @ US$1,275/oz) Low Cost Profile Power, $66 G&A, $112 Total Cash Cost 595 (US$/oz) Processing, $74 Mining Cost, All-in Sustaining Cash 714 $342 Cost (US$/oz) Sustaining Capital, $118 44% NET FCF Margin (pre-tax) per PEA @

  9. Slide 9: Project Enhancement Opportunities

    Madsen Gold Project PROJECT ENHANCEMENT OPPORTUNITIES Resource Expansion Potential • Satellite resources to be disclosed in Q417 • Exploration expansion opportunities at Madsen Optimization of Mine Plan • Investigate mechanized cut and fill and long hole mining methods • Review ramp sequencing to op

  10. Slide 10: Modern Science Driving Exploration

    Madsen Gold Project MODERN SCIENCE DRIVING EXPLORATION • Multiple highly prospective targets currently being advanced section 9

  11. Slide 11: Multiple Gold Zones Open for Expansion

    Madsen Target Settings MULTIPLE GOLD ZONES OPEN FOR EXPANSION Note: Mine workings and geologic contacts in this image are schematic. (1) The resource estimate reported herein for the Madsen Gold Project is set out in the NI 43-101 technical report “Madsen Gold Project 2017 Mineral Resource” with an

  12. Slide 12: +5km Mineralized System

    Madsen Property +5km MINERALIZED SYSTEM Fork McVeigh Starratt Austin Significant Gold Mineralized System, Scale Potential • Austin open down plunge – • hole AD-11-01 returns 14.3 g/t gold over 2.0 m at 2.1 km vertical depth • Hole PG17-456 returns 34.6 g/t gold over 4.3 m in South Austin at 1.4 km v

  13. Slide 13: Near Term Development

    Madsen Gold Project NEAR TERM DEVELOPMENT • Underground drilling – de-risk early mine life stopes and test extensions to resources • Results to date confirm resources and expand gold mineralized zones proximal to existing underground infrastructure (1) See news releases dated September 5, 2017, Sept

  14. Slide 14: Madsen – Starratt Corridor

    Madsen Gold Project MADSEN – STARRATT CORRIDOR • 5 kilometre mineralized system • Other targets to develop 13

  15. Slide 15: Emerging Canadian Developer

    Madsen Gold Project EMERGING CANADIAN DEVELOPER  Madsen resource update August 2017 Exploration • Surface drilling – test new target models 8 Zone - Russet South • Underground drilling – de-risk early stage mining shapes and test extensions to resource • Update mineral resource Q4 2017 Development

  16. Slide 16: Benchmarking vs. Peers – Resource Grade

    Pure Gold Mining BENCHMARKING VS. PEERS – RESOURCE GRADE M&I Resource Grade 12.0 11.53 M&I Resource Grade (g/t Au) 10.0 9.13 8.90 8.42 8.41 7.85 8.0 6.16 5.87 6.0 4.0 2.66 1.63 2.0 0.0 (1) (3) Dalradian Integra (2) Pure Gold Osisko Harte Auryn Eastmain Sabina Gold ATAC Midas Gold Inferred Resource G

  17. Slide 17: Benchmarking vs. Peers – Market Cap

    Pure Gold Mining BENCHMARKING VS. PEERS – MARKET CAP Market Cap + Pre-Production Capital $1,102 $1,100 $963 Market Cap + Capex (C$mm) $916 $850 $765 $673 $600 $350 $259 $156 $100 Midas Gold Osisko Sabina Gold Integra (2) Dalradian Harte Gold Pure Gold Market Capitalization $722 $600 $501 $500 $435 M

  18. Slide 18: Appendix

    puréfjold dream big APPENDIX

  19. Slide 19: Direct Red Lake Experience

    Pure Gold Mining DIRECT RED LAKE EXPERIENCE Management & Technical Team Board of Directors Darin Labrenz, President, CEO & Director Graeme Currie, Chairman • Former VP Business Development, Terrane Metals Corp. • Former Director, Investment Banking at Canaccord Genuity • Former Chief Geologist, Plac

  20. Slide 20: Current Mineral Resource

    Madsen Gold Project CURRENT MINERAL RESOURCE Resource Grade Contained Gold Tonnes Classification g/t Au (oz.) Indicated 5,785,000 8.9 1,648,000 Inferred 587,000 9.4 178,000 The updated mineral resource estimate for Madsen is reported at a 4.0 g/t Au cut-off effective September 14, 2017 (1). Mineral

  21. Slide 21: Project Details

    PROJECT DETAILS Parameters • Underground mining via a combination of conventional cut & fill and shrinkage methods • $50.9 million in pre-production capital costs over a 12-month period  Majority of cost for mill upgrades, ramp and surface development  New ventilation and dewatering system which w