GTA Resources and Mining — Investor Presentation (June 2014)
28 slides from GTA Resources and Mining's investor presentation, June 2014
Slide 1: Corporate Presentation June 2014
GTA Resources and Mining Inc. y: Corporate Presentation June 2014
Slide 2: Disclaimer
DISCLAIMER This presentation is prepared by GTA Resources and Mining Inc. (GTA or GTA.V) management and GTA is solely responsible for content and format. Robert Duess, P.Geo., is a non-independent Qualified Person and has compiled this presentation from publicly available industry information, NI43-
Slide 3: Corporate Structure
CORPORATE STRUCTURE (as of March 1, 2014) Issued and Outstanding: ~26.7 M Inside Group: ~7.0 M Balmoral Resources: ~3.1 M Stock Options: ~1.6 M Fully Diluted: ~28.3 M Current Price: ~$0.12 Cash ~$1.2 M 3
Slide 4: GTA overview and three projects
GTA is a Canadian based mineral exploration company with an experienced management team, strong balance sheet and three quality projects: NORTHSHORE: • Resource estimate at a 0.5 g/t Au cutoff: •Indicated - 391,000 oz (12,360,000 tonnes at 0.99g/t) •Inferred - 824,000 oz (29,580,000 tonnes at 0.87 g
Slide 5: GTA Resources and Mining Inc.
GTA Resources and Mining Inc.
Slide 6: Northshore Property
NORTHSHORE PROPERTY 5 patented, 2 unpatented mining claims (3.3 sq km) Hemlo-Schreiber Greenstone Belt /Abitibi Greenstone Road accessible, 4 km from Trans Canada Hwy 110 km west of Hemlo Mines (over 23 M oz since 1984) 6
Slide 7: North Shore Project Total Field Magnetics
GTA Resources and Mining Inc. 200, ° 200 200 oo (net) 20x00" Lake Superior GTA Resources and Mining Inc. NORTH SHORE PROJECT TOTAL FIELD MAGNETICS sare LOCATIONS ARE APPROXIMATE
Slide 8: Northshore project drill plan and zones
GTA Resources and Mining Inc. Main Vein a ae NEW TARGET GINO VEIN Felsic Intrusive a Rock AFRIC ZONE > “CORE” x HIGHER GRADE GOLD ZONE GOLD HALO o LOCATIONS ARE APPROXIMATE NORTHSHORE MINE (QIINE WORKINGS) DY /ROUGH GOLD FE ‘Thunder Bay Mining Division, Ontario ‘Om. NOV, 2013 DRILL HOLE LOCATIONS 2
Slide 9: Northshore, Idealized Section
NORTHSHORE, Idealized Section 9
Slide 10: Plan and isometric view of mineralized solid
Plan view showing Isometric view looking east showing mineralized solid in red, surface topography in grey and drill hole traces. 10
Slide 11: Modelled dykes cutting mineralized solid
Plan view showing modelled dykes cutting through the mineralized solid. 11
Slide 12: Indicated and Inferred Resource
INDICATED RESOURCE Cut Off Grade (g/t Tonnage Gold Grade (g/t) Contained Ounces Au) 0..20 27,980,000 0.61 549,000 0.50 12,360,000 0.99 391,000 0.80 6650,000 1.28 275,000 1.20 2,560,000 1.78 147.000 INFERRED RESOURCE Cut Off Grade (g/t Tonnage Gold Grade (g/t) Contained Ounces Au) 0.20 63,490,000 0.5
Slide 13: North Shore Gold Project
GTA Resources and Mining Inc. NORTH SHORE GOLD PROJECT poe ZONE « Sie
Slide 14: Northshore, Higher Grade Central Zone
NORTHSHORE, Higher Grade Central Zone 14
Slide 15: Northshore Property Summary
NORTHSHORE PROPERTY SUMMARY • 52 drill holes (11,390 m) completed since fall 2011 in 4 phases • Total expenditures to date approx $2.5 million • Will vest at 51% interest. Option to go to 70% for additional expenditures • Results delineate a porphyry style gold system (Afric Zone) • 43-101 compliant
Slide 16: Ivanhoe Property
GTA Resources and Mining Inc. IVANHOE PROPERTY
Slide 17: Ivanhoe Property
IVANHOE PROPERTY • Option agreement with local Timmins prospectors whereby GTA to earna 100% interest subject to a 3% NSR (GTA can purchase half the NSR) • 100 sq km property located on southwest extension of Porcupine-Destor Fault and northeast extension of Borden Lake trend • Property is underlain
Slide 18: Ivanhoe Property Claim Map
G A Ri d M i j I I esources an ining inc. Bryce Lake FOLEYET TWP /| MUSKEGO TWP REEVES TWe 426122 4261220 - 4201219 IVANHOE PROPERT' & mide! asia assis arn | aon ae cet Lake. 5 - aarsay aris arr998 aari2ar “arstia ‘a0007 Slave Rock é —- zal Muskego, we a2rt240 in woe 2 | | 201220 | § aeriass Relea!
Slide 19: Ivanhoe Property Location Map
GTA Resources and Mining Inc. Foleyet Joburke Gold Mine Probe Mines “Probe Mines Borden Gold yr East Limb 4.3 Moz Au oy oo GTA E RESOURCES AND MINING INC. Ivanhoe Property Location Map Cété Lake Present Gold Producer / 9.0MozAu * Significant Deposit @G Archean volcanic rocks Legend Date: May, 2014 B
Slide 20: Foleyet Twp geology and showings
GTA Resources and Mining Inc. FOLEYET TWP. {| { 7A Legend Mineral Showings/Occurences D copper Gold Graphite tron Molybdenum Nicke! Zine | __ Slate. [z ie late Lake "elma IVANHOE TWP 0 2 Kilometers “}—Joburke iad om Mine 0 KEITH TWP. 1 Utramafc (to Matic) Metavoleanic Rocks/Inrusions 2 Mafc (to Inte
Slide 21: “\ feoitemacome oon
GTA Resources and Mining Inc. “\ feoitemacome oon ' : Is a y 4 > * @ Graphite ’ ” i 4 > : ] ‘ @ Nicker ad ~ 4 © Zine } & cs *, : USKEGQ TWP . = i. » X. —— ~~ ‘ ; ‘ {= _& ‘ 7 . — . * et % . men t ; UTAH co ~*~ ie, ._ KEITH emia a % a me a — yrospivey ,7 al De ea! “Mine rty — Total Field Magnetics + .
Slide 22: Auden Property
GTA Resources and Mining Inc. AUDEN PROPERTY
Slide 23: Claims location map, Auden Graphite Project
GTA Resources and Mining Inc. Claims location map GTA Resources and Mining Inc. AUDEN GRAPHITE PROJECT Porcupine Mining Division, Ontario LOCATIONS ARE APPROXIMATE GTA RESOURCES = - = [7 ZENYATTA RESOURCES s [) BROOKEMONT RESOURCES [1 cariBou KING RESOURCES [= xmer REsourcES “(J oTHER Constance Lake
Slide 24: Auden Graphite Project structural/mag
rrr TNoouness ‘p90 NnCOMLS TOKORS NOMOESS CONTOUR INTERVAL =20 , 100.07 key for ph ea Blocks ite () West @ ETAAirborne @ Hockey Puck @) Nagagami East © Limestone Rapids GTA Resources and Mining Inc. AUDEN GRAPHITE PROJECT Porcupine Mining Drvision, Ontario GRAPHITE STRUCTURAL / MAG 2014 sc RegMon2 F
Slide 25: Auden Graphite land position and location
AUDEN GRAPHITE LAND POSITION AND LOCATION - Originally staked in 2007 , the claims targeted the clay-covered Auden Greenstone Belt for its Gold-Copper-Nickel-PGE potential - Property now consists of 1748 claim units covering approx 280 sq. km. - Located 20 km north of the Trans-Canada, between Hears
Slide 26: 2014/2015 Budget Estimates
2014/2015 Budget Estimates NORTHSHORE -Metallurgy 25,000 -Environmental Baseline 75,000 -Scoping 50,000 -Detailed in-fill drilling 250,000 -TOTAL $400,000 IVANHOE -Compilation 40,000 -Prospecting/geochemistry 150,000 - Grid work, trenching 100,000 -Diamond drilling 250,000 -TOTAL $540,000 AUDEN -Tar
Slide 27: Management
GTA Resources Management Wayne Reid, B.Sc., P.Geo., Chief Executive Officer and Director Robert Duess, B.Sc., P.Geo., Vice President Exploration and Director Brian Crawford, CA, Chief Financial Officer and Director Birks Bovaird, B.A., Director and Chair Stephen Stares, Director James MacIntosh, B.S
Slide 28: Contact
President & CEO: Wayne Reid contacts: wreid@gtaresources.com 709-699-1733 VP Exploration: Robert Duess rduess@gtaresources.com 613-453-7947 www. gtaresources.com GTA Resources and Mining Inc. 855 Brant Street Burlington, Ontario L7R 2J6 289-288-3255 28
GTA Resources and Mining — Investor Presentation (June 2014) on 6ix