Star Gold Corp. · OTC:SRGZ
Star Gold — Investor Presentation (February 2026)
16 slides from Star Gold's investor presentation, February 2026
Slide 1: Advancing Gold & Silver Projects in Nevada
Advancing Gold & Silver Projects in Nevada February 2026
Slide 2: Forward-Looking Statements
OTCQB:SRGZ Forward-Looking Statements This presentation is for the purpose of providing information regarding the Company, including management’s assessment of the Company’s future plans and operations and certain statements set forth in this presentation are forward looking. All statements other th
Slide 3: Star Gold Property – 100% owned
Star Gold Property – 100% owned “Near Term” Producer of Gold/Silver, Large Land Package with Growth Potential Main 3
Slide 4: Longstreet Project
OTCQB:SRGZ Longstreet Project • Longstreet is Star Gold’s flagship open pit, heap-leach gold and silver project, located in Nevada’s Walker Lane Belt, one of the most productive and well- established gold mining districts in the United States. • Formed during similar time period during Caldera Volca
Slide 5: LongStreet Main Zone Deposit—Updated Resources
OTCQB:SRGZ LongStreet Main Zone Deposit—Updated Resources December 8th,2025 Technical Report (SK 1300 Noland Report 2025): Approx. 213,000 ounces AuEq with 132,414 ounces gold and 4,839,931 ounces Silver on less than 2% of targeted acres. Model represents less than 10% of the main hill Resource Esti
Slide 6: Longstreet Project: Preliminary Design Completed
OTCQB:SRGZ Longstreet Project: Preliminary Design Completed From the PEA of Longstreet Gold Current In-Pit Mineralized Project from February 02, 2021 Inventory Life-of-Mine LOM Au Ag • Moving to final permit in 2021 when Gold Category Tonnes (g/t) (g/t) prices went down and put the project on Leach
Slide 7: Longstreet Project: Economic Viability
OTCQB:SRGZ Longstreet Project: Economic Viability* • An open-pit heap leach Au + Ag project based in a historically productive The Below Estimated Net Cash Flows are Based on mining area in Nevada the 2021 PEA With Updated Costs for Contract • Relatively straight-forward mining process; open pit, bl
Slide 8: Star Gold's Resource Potential
Star Gold’s: Resource Potential • Cyprus Ridge • Over 3,600 feet of exposed multiple-vein system • Surface Au Assays up to 0.36 oz/ton Nine Distinct Targets • 20+ foot wide banded quartz vein is part of this system • Red Knob • Surface Au assays up to 0.095 oz/ton • Surface mineralized zone running
Slide 9: Longstreet Project: Exploration Plan
OTCQB:SRGZ Longstreet Project: Exploration Plan • To date, North is the only additional target at Longstreet to obtain drill results and the 3 holes drilled provide confirmation the possible connection of the Ore Body (insufficient for an additional resource) • North, like Main, had material averagi
Slide 10: Experienced, Proven & Multidisciplinary Team
OTCQB:SRGZ Experienced, Proven & Multidisciplinary Team Lindsay Gorrill Richard Kern Kaitlin Sweet Reinis N. Sipols Chairman & CEO Senior Geologist Director of Env. Engineering Director of Project Mgt. 30+ yrs mining entrepreneur 40+ yrs in mining exploration & dev. 18+ yrs in mining env. & permit 2
Slide 11: Presentation
PRESENTATION
Slide 12: LongStreet Main Zone Deposit (<2% of the Longstreet Land Package)
OTCQB:SRGZ Proposed Pit Outline with Drilling Data LongStreet Main Zone Deposit (<2% of the Longstreet Land Package) • Total Drill Meters • 26,010 • Reverse Circulation (RC) Drillholes for 24,700 M • 403 • Diamond Drill Core (DD) Holes 1,310 M • 19 • All drilling has been relatively shallow focused
Slide 13: Project: Metallurgy
OTCQB:SRGZ Longstreet Project: Metallurgy From the PEA of Longstreet Gold Project from Cumulative Recover, %of total February 02, 2021 (by McClelland Laboratories) Gold Recovery 80% After • Excellent leachability of gold at the Main Zone, based on 20 Days Leach-time column leach tests done with a 1
Slide 14: Longstreet Project: Permitting Framework
OTCQB:SRGZ Longstreet Project: Permitting Framework Given Nevada’s familiarity with heap-leach gold projects and the relatively modest size/footprint, timeline to mine permitting & production decision is expected within 12 months from the time when the permit is submitted Step 1: Baseline Studies St
Slide 15: Plan of Operation Permit
OTCQB:SRGZ Plan of Operation Permit U.S. Forest Service (USFS) approved the current POO (Plan of Operation) in March 2023 (currently being updated) provides permission for the following: • Production water-well drilling; Location close to the proposed mine • Water monitor well drilling; Location clo
Slide 16: 2026 Operational Plan
OTCQB:SRGZ 2026 Operational Plan • Approved POO work program focused on defining local water supply and completing Hydrology baseline study for mine permitting • Geotechnical testing of proposed heap-leach pad location • Geochemical testing of ‘ore’ and waste for ARD potential and completion of Geoc