Jayden Resources Inc · TSXV:JDN

Jayden Resources — Investor Presentation (February 2015)

20 slides from Jayden Resources's investor presentation, February 2015

  1. Slide 1: Silver Coin Project, British Columbia

    Slide 1: Silver Coin Project, British Columbia

    Silver Coin Project, British Columbia Bulk-Tonnage | Advanced-Stage | Gold-Silver-Zinc Deposit

  2. Slide 2: Forward-Looking Statement

    Slide 2: Forward-Looking Statement

    FORWARD-LOOKING STATEMENT This presentation contains certain forward-looking statements that may involve a number of risks and uncertainties. Actual events or results could differ materially from Jayden Resources Inc’s (the “Company”) expectations and projections. The Toronto Stock Exchange has neit

  3. Slide 3: The Company

    Slide 3: The Company

    THE COMPANY Jayden Resources Inc.  A Toronto Stock Exchange listed mineral exploration company – TSX: JDN  Formed in 2003 as Pinnacle Mines Ltd; renamed Jayden Resources Inc. in 2010 SILVER COIN  Key project - Silver Coin – well located in British Columbia’s Golden Triangle near Stewart The Compa

  4. Slide 4: Silver Coin Project: Highlights

    Slide 4: Silver Coin Project: Highlights

    SILVER COIN PROJECT: HIGHLIGHTS Advanced-Stage Project with NI 43-101 Resource  Located in established mining camp near Salmon Stewart, B.C. (population ~500) Glacier Silver Coin Property  Ownership: Jayden 80%, Mountain Boy Minerals 20% Granduc Road  Potential to grow resource to the north, east

  5. Slide 5: Silver Coin Project Stewart, BC

    Slide 5: Silver Coin Project Stewart, BC

    SILVER COIN PROJECT STEWART, BC To Galore Cr & STEWART DISTRICT Copper Canyon Historical Production Au Ag Cu 6.2M oz 217M oz 1.6Bln Lbs Current 43-101 Resources Au Ag Cu 144.6M oz 1.03Bln oz 31.8Bln Lbs Regional Map, Stewart District, BC 5

  6. Slide 6: Established Mineralized Trend

    Slide 6: Established Mineralized Trend

    ESTABLISHED MINERALIZED TREND 2.1 Moz Historical Gold Production from Bordering Projects Silbak-Premier Mine ~3.5 km South of Silver Coin  Active 1918-68 & 1989-96  2 million oz gold, 43 million oz silver, 55 million lb lead, 4 million lb copper Big Missouri Mine ~0.5 km North of Silver Coin  Act

  7. Slide 7: Silver Coin Project: Land Tenure

    Slide 7: Silver Coin Project: Land Tenure

    SILVER COIN PROJECT: LAND TENURE  Covers 1,470 effective hectares on 44 claims  Controlled 80% by Jayden Resources and 20% by Mountain Boy Minerals Ltd. Silver Coin resource area, looking south-east Claim map, Silver Coin 7

  8. Slide 8: Silver Coin: Community & Government

    Slide 8: Silver Coin: Community & Government

    SILVER COIN: COMMUNITY & GOVERNMENT  Mining-friendly area  9 companies now have offices or very active projects based in Stewart  Good community relations – Jayden and Mountain Boy are well established in the local community  Jayden has successful history of exploration permitting with BC Regula

  9. Slide 9: Silver Coin – Geology

    Slide 9: Silver Coin – Geology

    SILVER COIN – GEOLOGY  Early Jurassic age Hazelton Group andesitic volcanic rocks  Intrusive center, early Jurassic Texas Creek and Premier porphyry intrusives  Strong phyllic and silicic alteration  North-south structurally controlled mineralization  Silicified breccia and stockwork Geological

  10. Slide 10: Silver Coin: Mineralization

    Slide 10: Silver Coin: Mineralization

    SILVER COIN: MINERALIZATION  Multiple mineralized zones identified across the property  Most significant is the Main Breccia Zone  1000 meters long  300+ meters wide  Up to 100 meters in thickness  Irregular sulfide lenses & stockwork  Mineralization is structurally controlled, with strong ph

  11. Slide 11: Silver Coin Drilling

    Slide 11: Silver Coin Drilling

    SILVER COIN DRILLING Core Drilling at Silver Coin Underground Drilling (Historical): 293 holes Surface Drilling (Historical): 129 holes Surface Drilling (Jayden): 457 holes Total Drilling: 879 holes Total Meters: 108,859 m Jayden / Mountain Boy Exploration  Aggressive exploration program by Jayden

  12. Slide 12: Silver Coin: Growth Potential

    Slide 12: Silver Coin: Growth Potential

    SILVER COIN: GROWTH POTENTIAL Northern Extension: Resource Expansion Potential  600 meters of favorable trend Silver Coin Resource Area  Good results in this area from recent drilling – further follow-up required  New 2 million ounce resource on Jayden’s north border (Ascot Resources, technical r

  13. Slide 13: Silver Coin: 2011 Assay Highlights

    Slide 13: Silver Coin: 2011 Assay Highlights

    SILVER COIN: 2011 ASSAY HIGHLIGHTS Drill Hole ID From (m) To (m) Length (m) Au (g/t) Ag (g/t) SC11-341 89.6 106.0 16.4 2.67 14.25 Including 100.0 103.0 3.1 10.65 43.08 SC11-351 93.5 150.2 56.7 1.48 4.71 Including 116.5 117.7 1.2 4.87 4.80 189.7 202.7 13.0 2.74 3.76 Including 200.9 201.3 0.5 42.78 23

  14. Slide 14: Silver Coin: 3D Model

    Slide 14: Silver Coin: 3D Model

    SILVER COIN: 3D MODEL 3D view of deposit, looking north-west Looking north 14

  15. Slide 15: A Growing Resource

    Slide 15: A Growing Resource

    A GROWING RESOURCE Updated NI 43-101 Resource, April 2011 * Cutoff Au Ag Zn Au Ag Zn Classification Tonnes g/t g/t g/t % oz oz lbs Measured 5,804,370 1.22 5.48 0.21 227,116 1,023,007 26,637,183 0.1 Indicated 31,527,925 0.69 4.56 0.11 695,952 4,624,277 79,375,584 Inferred 74,844,055 0.44 4.66 0.12 1,

  16. Slide 16: Metallurgy and Processing

    Slide 16: Metallurgy and Processing

    METALLURGY AND PROCESSING  Conventional processing methods  All mineralization types free Moderate grind milling  Overall gold recovery – 83%  By-product Ag and potential for Pb and Zn Gravity Flotation 90-98% Au recovery Cyanidation 85-95% Au recovery (from sulfide cons) 16

  17. Slide 17: Preliminary Mine Planning

    Slide 17: Preliminary Mine Planning

    PRELIMINARY MINE PLANNING  Roughly cylindrical, north-south trending ore body  Can be mined as single large open pit ~900 m x 400 m  Favorable strip ratio – 1.7:1 (waste to ore)  Modeled annual production capacity of 1.0 - 2.0 million tonnes of ore delivered to process plant  Excellent logistic

  18. Slide 18: Why Silver Coin?

    Slide 18: Why Silver Coin?

    WHY SILVER COIN?  Key location in established mining camp  Over 800 drill holes plus underground workings have defined a significant gold-silver resource  Quality resource with excellent expansion potential  Excellent infrastructure & access, near town and all-season port with load-out facility

  19. Slide 19: Management and Technical Team

    Slide 19: Management and Technical Team

    MANAGEMENT AND TECHNICAL TEAM Letty Wan, President & CEO Peter Lacroix, B.Sc., P.Eng., Project Previously Executive Director of China Investment Fund Manager Mining Company Ltd., a fund listed on the Stock Exchange of Professional Mining Engineer involved with the Hong Kong. Currently the beneficial

  20. Slide 20: Contact Details

    Slide 20: Contact Details

    Contact Details Letty Wan, President & CEO Head Office: letty.wan@jaydenresources.com Suite #1980 - 1075 West Georgia Street Vancouver, BC V6E 3C9 Lawrence Dick, Chief Geologist lawrence.dick@jaydenresources.com Tel: (604) 688-9588 Fax: (778) 329-9361 Mike Thast, Corporate Affairs Email: info@jayden

Source: Internet Archive copy of jaydenresources.com

More decks from Jayden Resources Inc

All 8 Jayden Resources decks