  1. Slide 1: Presentation on Boilers

    Slide 1: Presentation on Boilers

    PRESENTATION ON BOILERS DESIGNED MANUFACTURED INSTALLED AND COMMISSIONED BY LLOYDS STEELS INDUSTRIES LTD.

  2. Slide 2: List of Major Executed Waste Heat Recovery Boilers and Power Plant

    Slide 2: List of Major Executed Waste Heat Recovery Boilers and Power Plant

    LIST OF MAJOR EXECUTED WASTE HEAT RECOVERY BOILERS AND POWER PLANT Item Description / Inspecti Quantit Contractua Scope Sr. Technical Parameters, on Date of Client / Project site Site location P.O.No. & date Process / Application y/ l Delivery of No. size / Rating, Material Authori supply Value Date

  3. Slide 3: List of Major Executed Waste Heat Recovery Boilers and Power Plant

    Slide 3: List of Major Executed Waste Heat Recovery Boilers and Power Plant

    LIST OF MAJOR EXECUTED WASTE HEAT RECOVERY BOILERS AND POWER PLANT Item Description / Quanti Contractual Execution Sr. Client / Project Technical Parameters, Process / Inspection Date of Site location P.O.No. & date ty / Delivery Methology No. site size / Rating, Material Application Authority suppl

  4. Slide 4: Waste Heat Boiler 18.7 TPH for IOCL Paradip Refinery Project

    Slide 4: Waste Heat Boiler 18.7 TPH for IOCL Paradip Refinery Project

    WASTE HEAT BOILER -18.7 TPH FOR IOCL- PARADIP REFINERY PROJECT

  5. Slide 5

    Slide 5

  6. Slide 6: 1) a SO

    Slide 6: 1) a SO

    == 1) a SO

  7. Slide 7

    Slide 7

  8. Slide 8

    Slide 8

  9. Slide 9: Waste Heat Boiler Evaporator Coil for 9.7 TPH for IOCL Paradip Refinery Project

    Slide 9: Waste Heat Boiler Evaporator Coil for 9.7 TPH for IOCL Paradip Refinery Project

    WASTE HEAT BOILER EVAPORATOR COIL FOR 9.7 TPH FOR IOCL – PARADIP REFINERY PROJECT

  10. Slide 10: Waste Heat Boilers 18.7 TPH & 9.7 TPH for IOCL Paradip Refinery Project

    Slide 10: Waste Heat Boilers 18.7 TPH & 9.7 TPH for IOCL Paradip Refinery Project

    WASTE HEAT BOILERS -18.7 TPH & 9.7 TPH FOR IOCL- PARADIP REFINERY PROJECT

  11. Slide 11

    Slide 11

  12. Slide 12

    Slide 12

  13. Slide 13: 9.7 & 18.7 TPH Steam Drum for IOCL Paradip Refinery

    Slide 13: 9.7 & 18.7 TPH Steam Drum for IOCL Paradip Refinery

    9.7 & 18.7 TPH STEAM DRUM FOR IOCL- PARADIP REFINERY

  14. Slide 14: Economiser Coils Under Dispatch for 40 TPH Waste Heat Boiler

    Slide 14: Economiser Coils Under Dispatch for 40 TPH Waste Heat Boiler

    ECONOMISER - COILS UNDER DISPATCH FOR 40 TPH WASTE HEAT BOILER

  15. Slide 15

    Slide 15

  16. Slide 16

    Slide 16

  17. Slide 17

    Slide 17

  18. Slide 18: Waste Heat Recovery Boiler 40 TPH for Mid India

    Slide 18: Waste Heat Recovery Boiler 40 TPH for Mid India

    WASTE HEAT RECOVERY BOILER –40 TPH FOR MID INDIA

  19. Slide 19: Waste Heat Recovery Boiler 40 TPH for Mid India

    Slide 19: Waste Heat Recovery Boiler 40 TPH for Mid India

    WASTE HEAT RECOVERY BOILER –40 TPH FOR MID INDIA

  20. Slide 20: 4x12 TPH WHR Boilers at LMEL Ghugus, Chandrapur

    Slide 20: 4x12 TPH WHR Boilers at LMEL Ghugus, Chandrapur

    4x 12 TPH WHR Boilers at LMEL Ghugus, Chandrapur.

  21. Slide 21: Turn Key Project 90TPH AFBC at Lloyds Metal & Energy Ltd Ghugus

    Slide 21: Turn Key Project 90TPH AFBC at Lloyds Metal & Energy Ltd Ghugus

    TURN KEY PROJECT 90TPH AFBC AT LLOYDS METAL & ENERGY LTD GHUGUS CHANDRAPUR

  22. Slide 22: Turn Key Project 4x12 TPH Waste Heat Recovery Boiler at Gopani Iron & Power

    Slide 22: Turn Key Project 4x12 TPH Waste Heat Recovery Boiler at Gopani Iron & Power

    TURN KEY PROJECT 4x 12 TPH WASTE HEAT RECOVERY BOILER AT GOPANI IRON & POWER LTD TADALI

  23. Slide 23: WHRS Boiler Package for SRU BPCL Kochi

    Slide 23: WHRS Boiler Package for SRU BPCL Kochi

    WHRS Boiler Package for SRU BPCL Kochi Sub Order by Tecnicas Reunidas Two Trains of each Comprising of following : AA -Waste Heat Boiler – 43 TPH Design Pr / Temp-24 Kg/ cm 285 0C BB -Thermal Incinerator-Length 20.7 m Total Wt 70MT Design Temp 343oC CC -Vent Stack –Dia 6.35 m/4.18/m/2.15m,Height 85m

  24. Slide 24: Certifications

    Slide 24: Certifications

    CERTIFICATIONS Cenicate IN11#3286, continued ‘Conticate IN 103288 Lloyds Steels Industries Ltd. enwagenetoptend Lloyds Steels Industries Ltd. ‘ead Offce: Trade Weld, °C" Wing 16h Flor, Kamala Cy, ISO 9001:2008 sepa ‘The scope of registration appears on page 2 of this certificate. Se This certificate

  25. Slide 25: Contact Us

    Slide 25: Contact Us

    CONTACT US Marketing office Factory: Kamala city, Trade World A 6/3 &5/5 MIDC Area, ‘C’ Wing, 16th Floor, Murbad Taluka Senapati Bapat Marg, Dist: Thane 421401 Lower Parel, Maharashtra Mumbai 400 013 Tel : 91-252422271/9270901141 Maharashtra Fax : 91-2524222273 India. Tel: 91-22-30418111, Fax: 91-22

  26. Slide 26: Thank You

    Slide 26: Thank You