Carbine Resources Limited · ASX:CRB

Carbine Resources — Austmine Smart Mining Series (July 2015)

15 slides from Carbine Resources's conference presentation, Jul 24, 2015

  1. Slide 1: Mount Morgan Gold & Copper Project: Targeting Near Term Mine Development

    For personal use only Mount Morgan Gold & Copper Project Austmine Smart Mining Series Presentation: Targeting Near Term Mine Development July 2015

  2. Slide 2: Disclaimer

    DISCLAIMER For personal use only Mineral Resources The Indicated and Inferred Resources referred to in this presentation were presented by Norton Gold Fields Limited at the Mining 2009 Resource Convention (Brisbane). The presentation was released to the ASX on 28 October 2009 and is available for vi

  3. Slide 3: Carbine Snapshot

    CARBINE SNAPSHOT Tightly held, strong cash position For personal use only Share Price History Significant Shareholders 0.09 2,500 0.08 0.07 2,000 Volume ('000s) 0.06 Share Price 0.05 1,500 24% Board, Management & 0.04 Related Parties 1,000 0.03 Other Carbine 0.02 500 0.01 76% Shareholders 0 0 Volume

  4. Slide 4: Mount Morgan Mine Overview

    MOUNT MORGAN MINE Overview For personal use only Significant historical gold mine on central Queensland coast Close proximity to infrastructure and cities, ports & rail Primary ore deposit mined for ~100 years Production 8.4Moz Gold, 400kt Copper & 1.2Moz Silver ~40Mt mineralised tailings deposited

  5. Slide 5: Gold Price Timeline: Mount Morgan Mine development history

    GOLD PRICE TIMELINE Mount Morgan Mine development history For personal use only Closure of open pit Shutdown of tailings QLD Gov. accepts enviro. Perilya transfers Acquired by Norton Acquired by mining operations re-treatment plant liability ownership licences to Moonraker Gold Fields ( ~$7m ) Carbi

  6. Slide 6: Significant Resource Base

    SIGNFICANT RESOURCE BASE +1M oz. Au remaining in tailings For personal use only Resources Tonnes Au (g/t) Cu (%) Au (oz) Cu (t) Indicated 2.49 Mt 1.59 0.16% 127,000 3,900 Inferred 5.86 Mt 1.07 0.14% 202,000 8,400 TOTAL JORC 8.35 Mt 1.23 0.15% 329,000oz 12,300t Low High Low High Low High Low High Low

  7. Slide 7: Tailings Reprocessing

    TAILINGS REPROCESSING Historical operations & technical development For personal use only 1981 – 1991: Tailings Reprocessing Operations 28Mt tailings reprocessed via 3Mtpa CIL plant Excess cyanide consumption caused by soluble copper Ops ceased due to sol. copper and gold price 2000 – 2007: Moonrake

  8. Slide 8: Unlocking the Value: Reverse Leach IX-CIL

    UNLOCKING THE VALUE For personal use only Carbine’s Process Solution: Reverse Leach IX – CIL Application of ion exchange technology to solve soluble copper issue IX technology provides: Selective removal of copper prior to gold CIL extraction Decreased cyanide consumption in gold circuit Additional

  9. Slide 9: IX-CIL Flowsheet

    IX-CIL FLOWSHEET Addressing the soluble copper issue For personal use only Multiple by-products = Low All-in Sustaining Costs

  10. Slide 10: Scoping Study Economics

    SCOPING STUDY ECONOMICS Completed by engineering firm Ausenco ( Oct ’14) For personal use only Parameters Parameter Value Notes Mine Life 8 years JORC resources only Annual Throughput 1,000,000 t/yr Based on available JORC resources Production Gold 36,000 oz./yr High grade resources targeted during

  11. Slide 11: Scoping to PFS Optimisation

    SCOPING ⇨ PFS OPTIMISATION Targeting capex reduction For personal use only PFS Optimisation Testwork: Upgrading of feed ore via rejection of poorly mineralised coarse material General reduction in circuit complexity via minimisation of acid circuit unit processes 21% increase in copper recovery via

  12. Slide 12: Achieving Project Milestones

    ACHIEVING PROJECT MILESTONES Tracking toward mine development financing For personal use only Highlights 2014 2015 2016+ Timeline Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Acquired project (April ‘14) Project DD & Acquisition Completed Scoping Study Phase 1 Testwork Confirmed <US$400 All-in Sustaining Costs Phase 2 T

  13. Slide 13: Plans

    PLANS For the next 12 months For personal use only Finish PFS & assess potential for early stage financing Drill program to upgrade JORC resources and Exploration Target Complete BFS and detailed design Proceed with decision to mine and construction activities Finalise binding contracts for by- prod

  14. Slide 14: Board & Management

    BOARD & MANAGEMENT Overview and experience For personal use only Patrick Walta Rod Smith Russell Dann Executive Director Chief Metallurgist Project Specialist • Metallurgist and mineral economist, • Extractive metallurgist with 40 years • Former Regional Director – QOL commercial & tech. mining expe

  15. Slide 15: Contact

    For personal use only Contact Patrick Walta Executive Director Ph: Ph: +61 8 6142 0986 Carbine Resources Limited Suite 23 513 Hay Street Subiaco WA 6008